CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects
18 projects · funding €128.7m
Nuevo acceso sur por ferrocarril y carretera al Puerto de Barcelona - Fase 2 - Obras de conexión.
€36.1m
TerminatedAutoridad Portuaria de Barcelona · Multimodal · Mediterranean Corridor · call 2014 · Jul 2015 → Dec 2018 · investment €120.4m
Línea ferroviaria de alta velocidad Bilbao-Vitoria (excluido acceso a la ciudad )
€21.1m
TerminatedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · May 2016 → Dec 2019 · investment €105.7m
Despliegue de ERTMS (ETCS+GSMR) en el corredor atlántico. Tramo vitoria - bilbao - san sebastián
€11.7m
TerminatedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2015 · Aug 2017 → Dec 2020 · investment €23.3m
MiRO 2 - Multimodal Route connecting Barcelona to Paris
€11.1m
TerminatedVIIA (Francia) · Multimodal · Mediterranean Corridor · call 2018 · Feb 2019 → Dec 2023 · investment €55.4m
Tecnologías e innovación del gnl en el transporte marítimo para la promoción de la sostenibilidad, la multimodalidad y la eficiencia de la net obra (gainn 4 ship innovación)
€7.5m
TerminatedFundación Valenciaport · Maritime · Outside the corridors · call 2014 · Jan 2015 → Dec 2018 · investment €15m
LNGHIVE2 power supply & LNG bunkering
€6.4m
TerminatedSociedad de Gestión de Bienes de Equipos Eléctricos, S.L. · Maritime · Outside the corridors · call 2019 · Jan 2020 → Oct 2020 · investment €31.9m
Establishment of a new intermodal terminal at BASF ESPAÑOLA, S.L. in Tarragona - Spain - for modal shift between rail and road
€5.5m
TerminatedCOMBI TERMINAL CATALONIA, S.L. · Multimodal · Mediterranean Corridor · call 2014 · Oct 2015 → Sept 2019 · investment €25.5m
LNGHIVE2 FRS - PROMOTING ENERGY TRANSITION AND SUSTAINABLE TRANSPORT FREIGHT IN THE STRATEGICAL AREA OF GIBRALTAR STRAIT
€3m
TerminatedFörde Reederei Seetouristik Iberia S.L.U. · Maritime · Outside the corridors · call 2019 · Jan 2020 → Oct 2020 · investment €18m
Plataforma Logística Intermodal Constanti
€1.4m
TerminatedREPSOL QUíMICA S.A. · Rail · Mediterranean Corridor · call 2014 · Jun 2015 → Dec 2018 · investment €7m
Study for the optimization of an existing intermodal terminal in Port of Tarragona for modal shift between rail and road
€1.4m
TerminatedCOMBI TERMINAL CATALONIA SL · Multimodal · Outside the corridors · call 2020 · Mar 2021 → Jul 2024 · investment €2.7m
Corredor Atlántico / MED. Tren de alta velocidad Sines / Lisboa - Madrid. Nodo urbano de madrid. Estudio del Complejo Ferroviario de la Estación de Atocha (Fase 2).
€1.1m
TerminatedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2015 · Dec 2016 → Dec 2019 · investment €2.2m
Autopista del mar nantes saint nazaire - gijón
€1m
TerminatedAutoridad Portuaria de Gijón · Maritime · Outside the corridors · call 2015 · Feb 2016 → Dec 2018 · investment €3.4m
Blue gas growth to boost energy transition for low-carbon European economy (Blue2EU)
€930,000
TerminatedMOLGAS ENERGIA, S.A.U. · Road · Outside the corridors · call 2019 · investment €9.3m
Safe and Secure Parking Areas for Heavy-Duty Vehicles in Spanish Petrol Service Stations
€494,880
TerminatedREPSOL · Road · Atlantic and Mediterranean · call 2018 · Nov 2018 → Dec 2022 · investment €2.5m
SESAR Deployment Programme implementation 2019 - IOP Foundation
€20m
TerminatedSESAR Deployment Alliance Association Internationale Sans But Lucratif · Air · Outside the corridors · call 2019 · Jan 2020 → Oct 2020 · investment €40m
MEDITERRANEAN CORRIDOR. SECTION CASTELLÓN-VANDELLÓS. IMPLEMENTATION OF UIC GAUGE. TRACK ASSEMBLAGE AND ELECTRIFICATION WORKS
—
TerminatedNo beneficiary · Rail · Outside the corridors · call CEF-T-2022-COREGEN
H2Accelerate Expansion Network Part 2
—
TerminatedTotalenergies Marketing Services · Road · Outside the corridors · call CEF-T-2021-AFIFGEN-4.º corte
Road access to Intermodal Terminal and Logistic Activity Area of Murcia for its dual use
—
TerminatedCONSEJERIA DE FOMENTO E INFRAESTRUCTURAS · — · Outside the corridors · call CEF-T-2023-MILMOB
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.