CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects
8 projects · funding €72.7m
First methanol bunkering infrastructure in Huelva as part of the Andalusian Green Hydrogen Valley
€16.6m
In preparationCEPSA · Maritime · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €55.2m
Electric charging infrastructure for APMT Spanish gateways’ port equipment
€16.5m
In preparationAPMTB · Maritime · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €55m
First ammonia bunkering infrastructure in Algeciras as part of the Andalusian Green Hydrogen Valley
€13.6m
In preparationCEPSA · Maritime · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €45.4m
Deployment of a network of hydrogen fuelling stations of 1.000kg/day of capacity in Spain
€8m
In preparationSCALE GAS SOLUTIONS S.L. · Road · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €26.8m
Deployment of Reliable Infrastructure for Vehicle Electrification
€6.5m
In preparationREPSOL COMERCIAL DE PRODUCTOS PETROLIFEROS SA · Road · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €6.5m
MILES General: Mobility Infrastructure for Logistics - Electric & Sustainable in AT, BE, DE, DK, ES, FR, IT, NL, and SE
€4.6m
In preparationMilence Infrastructure Holding B.V · Road · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €15.3m
ACTIVA
€4.2m
In preparationHVR Energy · Road · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €14m
Electra European ultra-fast recharging network
€2.7m
In preparationELECTRA · Road · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €2.7m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.