CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects · “Algeciras”
11 projects · funding €48.1m
Design and deployment of On-shore powersupply in Algeciras Port
€6.4m
OngoingAP BAHIA DE ALGECIRAS · Maritime · Atlantic and Mediterranean · call CEF-T-2022-COREGEN · Mar 2023 → Jan 2027 · investment €20.3m
Study of gauges for the development of Rail Motorway Algeciras - Zaragoza
€2.4m
OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.9m
Desarrollo del Corredor de Carga Ferroviaria Atlántico "Sines-Lisboa / Leixoes - Madrid- Medina del Campo / Bilbao / San Sebastián-Irún-Burdeos-París / Le Havre / Metz - Estrasburgo / Mannheim / Sines-Elvas / Algeciras"
€765,000
OngoingGEIE Corridor Ferroviaire de Marchandises 4 (GEIE CFM4) · Rail · Atlantic Corridor · call 2014 · Nov 2015 → Mar 2021 · investment €1.5m
First ammonia bunkering infrastructure in Algeciras as part of the Andalusian Green Hydrogen Valley
€13.6m
In preparationCEPSA · Maritime · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €45.4m
LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay
€11.3m
CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m
Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO
€5.2m
CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m
ATL_Freight_South_access_to_Bilbao_Port
€3.5m
CompletedDirección de Infraestructuras del Transporte. Gobierno Vasco · Rail · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €7m
Impulso de la energía combustibles sostenibles para el transporte de mercancías en las autopistas europeas (Bestway)
€2.5m
CompletedGas Natural Servicios SDG, SA · Road · Atlantic Corridor · call 2014 · Sept 2014 → Aug 2020 · investment €4.9m
Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.
€1.2m
CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m
Improvement of the railway connection with the port facilities located in Algeciras Bay
€806,945
CompletedAutoridad Portuaria de la Bahía de Algeciras · Multimodal · Outside the corridors · call 2020 · Aug 2021 → Dec 2024 · investment €1.6m
Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal
€492,500
CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.