CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects
29 projects · funding €180.8m
Ponentia-La Melusa international railway multimodal terminal
€19.5m
OngoingPONENTIA LOGISTICS S.A · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Sept 2024 → Dec 2026 · investment €64.2m
INTERMODAL TERMINAL OF MURCIA AND ITS RAIL LINK
€13.9m
OngoingConsejería de Fomento e Infraestructuras (C. A. Región de Murcia) · Multimodal · Mediterranean Corridor · call CEF-T-2021-COREGEN · Oct 2022 → Nov 2025 · investment €46.1m
Intermodal Platform of the Port of Huelva II: a boost to multimodality, connectivity and sustainability
€6.7m
OngoingAutoridad Portuaria de Huelva · Multimodal · Atlantic Corridor · call CEF-T-2022-COREGEN · Oct 2022 → Apr 2025 · investment €22.4m
Optimization of the TRAffic MAnagement and infrastructure capacity in the port of Valencia
€4.1m
OngoingFUNDACION DE LA COMUNIDAD VALENCIANA PARA LA INVESTIGACION,PROMOCION Y ESTUDIOS COMERCIALES DE VALENCIAPORT · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Mar 2024 → Dec 2026 · investment €8.2m
DATA SPACE 4 MOBILITY MODELS INTEGRATION
€3m
OngoingESTACIONAMIENTOS Y SERVICIOS, S.A.U · Multimodal · Outside the corridors · call CEF-T-2023 · Jun 2024 → May 2027 · investment €6m
Support to Spain for CEF related activities, participation in the RFC and CNC, and on TENtec
€1.9m
OngoingMITMA · Multimodal · Outside the corridors · call CEF-T-2021-TAGENEA · Jan 2021 → Dec 2025
Upgrade of Zaragoza's terminal rail facilities Upgrade of TmZ terminal rail facilities for 750 m trains and new North rail connection to become a through terminal and avoid bottlenecks in the accesses
€1.8m
OngoingTerminal Marítima de Zaragoza SL · Multimodal · Mediterranean Corridor · call CEF-T-2022-COREGEN · Jan 2023 → Feb 2026 · investment €6m
Solicitud conjunta para la implementación del pdp - grupo 1
€22.8m
CompletedENAIRE · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2020 · investment €45.7m
CORE LNGas - Corredores Red Básica Gas Natural Licuado (obras)
€16.5m
CompletedEnagas Transporte, S.A.U. · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2021 · investment €33.1m
Plataforma logística intermodal en el suroeste de Europa
€7.6m
CompletedGobierno de Extremadura · Multimodal · Atlantic Corridor · call 2014 · Apr 2014 → Sept 2022 · investment €35.8m
Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO
€5.2m
CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m
Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies
€4.5m
CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m
FEDeRATED
€4.4m
CompletedMINISTERIE VAN INFRASTRUCTUUR EN WATERSTAAT (PAÍSES BAJOS) · Multimodal · Outside the corridors · call 2018 · Jan 2019 → Mar 2024 · investment €8.9m
Mejora de las conexiones y el desarrollo de la Plataforma Logística Multimodal en el Puerto de Sevilla, el único puerto interior del sur de Europa.
€2.7m
CompletedAutoridad Portuaria de Sevilla · Multimodal · Mediterranean Corridor · call 2015 · Jan 2017 → Mar 2020 · investment €16.2m
Plataforma Intermodal Puerto de Huelva
€2.5m
CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2015 · Feb 2016 → Dec 2021 · investment €12.3m
Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport
€1.9m
CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m
A European FEderated Network of Information eXchange in Logistics (FENIX)
€1.3m
CompletedERTICO-ITS EUROPE (Bélgica) · Multimodal · Outside the corridors · call 2018 · Apr 2019 → Dec 2022 · investment €2.5m
Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.
€1.2m
CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m
Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado
€1m
CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m
Estudios para el desarrollo de un terminal intermodal y área de actividad logística asociada (LAA de Murcia)
€970,450
CompletedConsejería de Fomento e Infraestructuras de la Región de Murcia (CARM) · Multimodal · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2022 · investment €1.9m
Improvement of the railway connection with the port facilities located in Algeciras Bay
€806,945
CompletedAutoridad Portuaria de la Bahía de Algeciras · Multimodal · Outside the corridors · call 2020 · Aug 2021 → Dec 2024 · investment €1.6m
Autopista del ferrocarril del Atlántico: cambio modal de todo tipo de semirremolques en el corredor Atlántico
€762,500
CompletedMinistère de la Transition Écologique et Solidaire (MTES) · Multimodal · Atlantic Corridor · call 2016 · Feb 2017 → Mar 2024 · investment €1.5m
Análisis de viabilidad sobre la armonización de las categorías de tipos de datos comunes para la red de carreteras y de transporte público (HARMONY)
€644,185
CompletedIndra Sistemas S.A · Multimodal · Outside the corridors · call 2014 · Nov 2015 → Dec 2018 · investment €1.3m
Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1
€540,000
CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m
Improvement of the Railway Interoperability and Connections with the hinterland of the Port of Huelva
€480,688
CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €961,376
Nuevo acceso sur por ferrocarril y carretera al Puerto de Barcelona - Fase 2 - Obras de conexión.
€36.1m
TerminatedAutoridad Portuaria de Barcelona · Multimodal · Mediterranean Corridor · call 2014 · Jul 2015 → Dec 2018 · investment €120.4m
MiRO 2 - Multimodal Route connecting Barcelona to Paris
€11.1m
TerminatedVIIA (Francia) · Multimodal · Mediterranean Corridor · call 2018 · Feb 2019 → Dec 2023 · investment €55.4m
Establishment of a new intermodal terminal at BASF ESPAÑOLA, S.L. in Tarragona - Spain - for modal shift between rail and road
€5.5m
TerminatedCOMBI TERMINAL CATALONIA, S.L. · Multimodal · Mediterranean Corridor · call 2014 · Oct 2015 → Sept 2019 · investment €25.5m
Study for the optimization of an existing intermodal terminal in Port of Tarragona for modal shift between rail and road
€1.4m
TerminatedCOMBI TERMINAL CATALONIA SL · Multimodal · Outside the corridors · call 2020 · Mar 2021 → Jul 2024 · investment €2.7m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.