Trans-European Network · Connecting Europe Facility
The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.
In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.
CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
18 projects · funding €75.8m
Solicitud conjunta para la implementación del pdp - grupo 1
€22.8m
CompletedENAIRE · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2020 · investment €45.7m
CORE LNGas - Corredores Red Básica Gas Natural Licuado (obras)
€16.5m
CompletedEnagas Transporte, S.A.U. · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2021 · investment €33.1m
Plataforma logística intermodal en el suroeste de Europa
€7.6m
CompletedGobierno de Extremadura · Multimodal · Atlantic Corridor · call 2014 · Apr 2014 → Sept 2022 · investment €35.8m
Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO
€5.2m
CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m
Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies
€4.5m
CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.
FEDeRATED
€4.4m
CompletedMINISTERIE VAN INFRASTRUCTUUR EN WATERSTAAT (PAÍSES BAJOS) · Multimodal · Outside the corridors · call 2018 · Jan 2019 → Mar 2024 · investment €8.9m
Mejora de las conexiones y el desarrollo de la Plataforma Logística Multimodal en el Puerto de Sevilla, el único puerto interior del sur de Europa.
€2.7m
CompletedAutoridad Portuaria de Sevilla · Multimodal · Mediterranean Corridor · call 2015 · Jan 2017 → Mar 2020 · investment €16.2m
Plataforma Intermodal Puerto de Huelva
€2.5m
CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2015 · Feb 2016 → Dec 2021 · investment €12.3m
Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport
€1.9m
CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m
A European FEderated Network of Information eXchange in Logistics (FENIX)
€1.3m
CompletedERTICO-ITS EUROPE (Bélgica) · Multimodal · Outside the corridors · call 2018 · Apr 2019 → Dec 2022 · investment €2.5m
Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.
€1.2m
CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m
Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado
€1m
CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m
Estudios para el desarrollo de un terminal intermodal y área de actividad logística asociada (LAA de Murcia)
€970,450
CompletedConsejería de Fomento e Infraestructuras de la Región de Murcia (CARM) · Multimodal · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2022 · investment €1.9m
Improvement of the railway connection with the port facilities located in Algeciras Bay
€806,945
CompletedAutoridad Portuaria de la Bahía de Algeciras · Multimodal · Outside the corridors · call 2020 · Aug 2021 → Dec 2024 · investment €1.6m
Autopista del ferrocarril del Atlántico: cambio modal de todo tipo de semirremolques en el corredor Atlántico
€762,500
CompletedMinistère de la Transition Écologique et Solidaire (MTES) · Multimodal · Atlantic Corridor · call 2016 · Feb 2017 → Mar 2024 · investment €1.5m
Análisis de viabilidad sobre la armonización de las categorías de tipos de datos comunes para la red de carreteras y de transporte público (HARMONY)
€644,185
CompletedIndra Sistemas S.A · Multimodal · Outside the corridors · call 2014 · Nov 2015 → Dec 2018 · investment €1.3m
Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1
€540,000
CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m
Improvement of the Railway Interoperability and Connections with the hinterland of the Port of Huelva
€480,688
CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €961,376