Trans-European Network · Connecting Europe Facility
The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.
In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.
CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
9 projects · funding €283.3m
ATLANTIC CORRIDOR: SECTION BERGARA-SAN SEBASTIAN-BAYONNE. BERGARA JUNCTION TRACK BED WORKS AND SERVICES FOR FOLLOW-UP WORKS. PHASE 2
€145.4m
OngoingADIF Alta Velocidad · Rail · Atlantic Corridor · call CEF-T-2021-COREGEN · Jan 2021 → Dec 2025 · investment €290.8m
Mediterranean corridor. Bilbao-Pamplona-Zaragoza-Sagunto line. Section Zaragoza-Teruel-Sagunto. Electrification works
€77.8m
OngoingADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS · Rail · Mediterranean Corridor · call CEF-T-2023 · Oct 2024 → Dec 2028 · investment €259.2m
Sagunto Multimodal Logistic Platform
€27.6m
OngoingGeneralitat Valenciana · Rail · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Sept 2026 · investment €92.1m
ATLANTIC CORRIDOR. TRACK BED WORKS AND SERVICES FOR FOLLOW-UP WORKS. SECTION ATXONDO - ABADIÑO. PHASE 2
€22m
OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-COREGEN · Feb 2023 → Jan 2027 · investment €73.4m
PCZ 2022: Bridging the cross border missing link between FR & SP: Pau-Canfranc-Zaragoza
€3m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.
OngoingRegión Nouvelle-Aquitaine · Rail · Outside the corridors · call CEF-T-2022-SIMOBGEN · Feb 2023 → Apr 2026 · investment €6.1m
Study of gauges for the development of Rail Motorway Algeciras - Zaragoza
€2.4m
OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.9m
Works for gauge adaptation in railway line Medina del Campo – Salamanca- Fuentes de Oñoro and services to follow-up works
€2.2m
OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.5m
Digital Capacity Management Implementation 2024-2026
€2.1m
OngoingRAILNETEUROPE-VEREINIGUNG ZUR FORDERUNG DES INTERNATIONALEN VERKEHRS AUF DER EISENBAHNINFRASTRUKTUR · Rail · Outside the corridors · call CEF-T-2023 · Apr 2024 → Dec 2027 · investment €4.1m
Desarrollo del Corredor de Carga Ferroviaria Atlántico "Sines-Lisboa / Leixoes - Madrid- Medina del Campo / Bilbao / San Sebastián-Irún-Burdeos-París / Le Havre / Metz - Estrasburgo / Mannheim / Sines-Elvas / Algeciras"
€765,000
OngoingGEIE Corridor Ferroviaire de Marchandises 4 (GEIE CFM4) · Rail · Atlantic Corridor · call 2014 · Nov 2015 → Mar 2021 · investment €1.5m