Trans-European Network · Connecting Europe Facility
The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.
In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.
CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
12 projects · funding €268.4m
Ponentia-La Melusa international railway multimodal terminal
€19.5m
OngoingPONENTIA LOGISTICS S.A · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Sept 2024 → Dec 2026 · investment €64.2m
Implementación del ancho UIC (fase 1) en el tramo Valencia-Tarragona-Barcelona del corredor Mediterráneo.
€124.5m
CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €311.2m
Implantacion del ancho UIC en el tramo Castellbisbal-Vilaseca. Corredor Mediterráneo.
€57m
CompletedADIF · Rail · Mediterranean Corridor · call 2017 · Jul 2017 → Dec 2024 · investment €285m
Mediterranean Corridor. Section Valencia-Sagunto-Castellón. Implementation of UIC gauge. Phase 2."
€41.5m
CompletedADIF · Rail · Mediterranean Corridor · call 2019 · Feb 2020 → Dec 2024 · investment €103.8m
Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.
€11.4m
CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.
Despliegue de ERTMS en las líneas de cercanías de Barcelona
€5.2m
CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Nov 2015 → Dec 2022 · investment €10.4m
Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies
€4.5m
CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m
Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.
€1.2m
CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m
Variable Gauge for Freight Transport (Eje de Ancho Variable para Mercancías - EAVM)
€1.1m
CompletedADIF · Rail · Mediterranean Corridor · call 2018 · Nov 2018 → Jun 2021 · investment €2.3m
Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"
€750,000
CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m
Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1
€540,000
CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m
Corredor Atlántico / MED. Tren de alta velocidad Sines / Lisboa - Madrid. Nodo urbano de madrid. Estudio del Complejo Ferroviario de la Estación de Atocha (Fase 2).
€1.1m
TerminatedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2015 · Dec 2016 → Dec 2019 · investment €2.2m