Loading data…
Trans-European Network · Connecting Europe Facility
The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.
In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.
CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
93 projects · funding €942.3m
Mediterranean corridor. Bilbao-Pamplona-Zaragoza-Sagunto line. Section Zaragoza-Teruel-Sagunto. Electrification works
€77.8m
OngoingADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS · Rail · Mediterranean Corridor · call CEF-T-2023 · Oct 2024 → Dec 2028 · investment €259.2m
TANGERINE
€40.6m
OngoingIberdrola Clientes SA (IBCLI) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €40.6m
Sagunto Multimodal Logistic Platform
€27.6m
OngoingGeneralitat Valenciana · Rail · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Sept 2026 · investment €92.1m
Onshore power supply for container ships, ferries and cruise ships in the Port of Valencia
€23.8m
OngoingFUNDACION DE LA COMUNIDAD VALENCIANA PARA LA INVESTIGACION, PROMOCION Y ESTUDIOS COMERCIALES DE VALENCIAPORT · Maritime · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Dec 2028 · investment €78.7m
Accelerate Europe’s key infrastructure - GENERAL
€23.4m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.
OngoingTesla Italy SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €23.4m
PALLANTIA
€22.5m
OngoingGrupo Easycharger SA · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €22.5m
Ponentia-La Melusa international railway multimodal terminal
€19.5m
OngoingPONENTIA LOGISTICS S.A · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Sept 2024 → Dec 2026 · investment €64.2m
Smart Electrification Infrastructure for the Urban Surface
€15.4m
OngoingEMT · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €51.2m
Phase 1 and 2 of the Plan to implement Shore-to-Ship Power Supply at the Port of Barcelona
€15.2m
OngoingAUTORITAT PORTUARIA DE BARCELONA · Maritime · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Dec 2028 · investment €49.8m
INTERMODAL TERMINAL OF MURCIA AND ITS RAIL LINK
€13.9m
OngoingConsejería de Fomento e Infraestructuras (C. A. Región de Murcia) · Multimodal · Mediterranean Corridor · call CEF-T-2021-COREGEN · Oct 2022 → Nov 2025 · investment €46.1m
HY2MOVE1
€12.8m
OngoingRepsol Comercial de Productos Petrolíferos (RCPP) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Dec 2022 → Oct 2025 · investment €42.8m
Accelerating on-the-go EV ultra-fast charging network in Italy, France, Spain and Portugal
€11.4m
OngoingAtlante SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €11.4m
INSPIRA MADRID
€7.4m
OngoingFRV-X · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €24.6m
Mediterranean-Atlantic Transport Intelligent Systems
€6.7m
OngoingASFA · Road · Atlantic and Mediterranean · call CEF-T-2022-SIMOBGEN · Jan 2023 → Jan 2027 · investment €13.5m
Design and deployment of On-shore powersupply in Algeciras Port
€6.4m
OngoingAP BAHIA DE ALGECIRAS · Maritime · Atlantic and Mediterranean · call CEF-T-2022-COREGEN · Mar 2023 → Jan 2027 · investment €20.3m
Next Wav-E: Developing an EU-wide network of electric vehicles’ high-power charging infrastructure for the electrification of mobility and decarbonisation of the road transport sector
€6m
OngoingENEL X WAY · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Nov 2022 → Nov 2025 · investment €6m
Southern European EV fast-charging network (Italy, France, Spain)
€5.8m
OngoingAtlante SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025 · investment €5.8m
Port Real-time Information Smart Management; PRISMA
€5.1m
OngoingAUTORIDAD PORTUARIA DE SEVILLA · Maritime · Atlantic and Mediterranean · call CEF-T-2023 · Jan 2024 → Dec 2027 · investment €10.3m
Safe Parking for Trucks (SSTPA) in the LAA of Murcia
€5m
OngoingConsejería de Fomento e Infraestructuras · Road · Mediterranean Corridor · call CEF-T-2022-SAFEMOBGEN · Nov 2023 → Nov 2025 · investment €9.9m
Ultrafast e-mobility infrastructure in ES-PT Mediterranean
€4.5m
OngoingCEPSA COMERCIAL PETROLEO SA (CCP) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €4.5m
Optimization of the TRAffic MAnagement and infrastructure capacity in the port of Valencia
€4.1m
OngoingFUNDACION DE LA COMUNIDAD VALENCIANA PARA LA INVESTIGACION,PROMOCION Y ESTUDIOS COMERCIALES DE VALENCIAPORT · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Mar 2024 → Dec 2026 · investment €8.2m
Temple & Mare Nostrum SSTPA Extensions A7
€4m
OngoingTRANSPORTES CALSINA Y CARRE SOCIEDAD LIMITADA · Road · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Nov 2026 · investment €8m
Upgrade and extension of a safe and secure parking area in the Spanish-French border region on the Mediterranean TEN-T Core Network Corridor
€3.5m
OngoingTransportes Calsina y Carre SL · Road · Mediterranean Corridor · call CEF-T-2021-SAFEMOBGEN · Jun 2021 → Jun 2024 · investment €7.9m
Spanish Airports' decarbonization through the implementation of electric vehicles of handling operators
€3.4m
OngoingAENA SME SA · Air · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Dec 2024 · investment €11.3m
Spanish Safe and Secure Truck Parking Area Network
€3.1m
OngoingGP Límite Andamur SL · Road · Atlantic and Mediterranean · call CEF-T-2021-SAFEMOBGEN · Mar 2022 → Sept 2025 · investment €6.3m
Heavy Wav-E, Mediterranean ultra-fast charging arteria for electric heavy-duty and light-duty vehicles
€2.8m
OngoingENEL X WAY · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Jul 2023 → Dec 2025 · investment €2.8m
Safe and secure parking area in Pinto in the South of Madrid on the Atlantic TEN-T Core Network Corridor
€2.4m
OngoingAtalaya Patrimonio Inmobiliario S.L · Road · Atlantic and Mediterranean · call CEF-T-2023 · Sept 2024 → Oct 2025 · investment €4.9m
Air Products' European HRS Network
€2.3m
OngoingAir Products Nederland BV · Road · Mediterranean Corridor · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €7.5m
Upgrade of Zaragoza's terminal rail facilities Upgrade of TmZ terminal rail facilities for 750 m trains and new North rail connection to become a through terminal and avoid bottlenecks in the accesses
€1.8m
OngoingTerminal Marítima de Zaragoza SL · Multimodal · Mediterranean Corridor · call CEF-T-2022-COREGEN · Jan 2023 → Feb 2026 · investment €6m
Accelerating Europe’s key infrastructure phase II
€1.8m
OngoingTesla Motors Netherlands B.V · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €1.8m
Ultra Fast in Europe
€50.4m
OngoingBE CHARGE SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025
Expand-E General: EXpanding Performance and Network Density – Electric
€28.2m
OngoingIONITY GMBH · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025
AMBRA-E lectrify Europe
€14.2m
OngoingEnel X S.r.l. (Italia) · Road · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2022
European Hydrogen Network by Hype
€18.1m
OngoingHype Assets · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Nov 2022 → Nov 2025
Implementación del ancho UIC (fase 1) en el tramo Valencia-Tarragona-Barcelona del corredor Mediterráneo.
€124.5m
CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €311.2m
Implantacion del ancho UIC en el tramo Castellbisbal-Vilaseca. Corredor Mediterráneo.
€57m
CompletedADIF · Rail · Mediterranean Corridor · call 2017 · Jul 2017 → Dec 2024 · investment €285m
Mediterranean Corridor. Section Valencia-Sagunto-Castellón. Implementation of UIC gauge. Phase 2."
€41.5m
CompletedADIF · Rail · Mediterranean Corridor · call 2019 · Feb 2020 → Dec 2024 · investment €103.8m
IBERDROLA SMART MOBILITY
€13.4m
CompletedIBERDROLA CLIENTES, S.A. · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2022 · investment €89.2m
LNGHIVE2 VESSEL DEMAND: GREEN AND SMART LINKS
€11.8m
CompletedBalearia · Maritime · Atlantic and Mediterranean · call 2017 · Apr 2018 → Jul 2021 · investment €59m
Mejora de la conexión ferroviaria interior y de la accesibilidad marítima al Puerto de Valencia (CONNECT VALENCIAPORT).
€11.6m
CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €55.9m
Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.
€11.4m
CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m
LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay
€11.3m
CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m
Implementation of Voice over IP (VoIP) in Barcelona ACC
€10.8m
CompletedSESAR Deployment Manager (NATs en route) · Air · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2023 · investment €21.7m
TB CLEAN URBAN TRANSPORT FLEET RENEWAL
€9.2m
CompletedTransports de Barcelona S.A · Road · Mediterranean Corridor · call 2019 · Jan 2020 → Dec 2024 · investment €47.6m
LNGHIVE2 Barcelona- An efficient LNG bunker barge in the port of Barcelona
€9.2m
CompletedENAGAS · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2023 · investment €45.8m
Project Everest
€7.3m
CompletedNORDIAN CPO, SL · Road · Atlantic and Mediterranean · call 2019 · Aug 2020 → Jun 2023 · investment €48.9m
Despliegue de ERTMS en las líneas de cercanías de Barcelona
€5.2m
CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Nov 2015 → Dec 2022 · investment €10.4m
Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO
€5.2m
CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m
Eco-gate: corredores europeos para la eficiencia del transporte de gas natural
€5.1m
CompletedGas Natural Madrid SDG, S.A. · Road · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2021 · investment €10.2m
Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies
€4.5m
CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m
Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors across Spain
€3.3m
CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €21.9m
Cleanport - combustibles alternativos y soluciones para el planchado en frío del puerto: normalización del marco reglamentario obra y demostración de la viabilidad de la explotación
€3.2m
CompletedGAS NATURAL SDG, S.A. · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €6.4m
LNGHIVE2 INFRASTRUCTURE AND LOGISTICS SOLUTIONS
€2.9m
CompletedEnagas Transporte, S.A.U. · Maritime · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2023 · investment €14.7m
Interoperability of the rail system with TAF TSI in TEN-T Corridors (I RAIL)
€2.7m
CompletedFundación Valenciaport · Rail · Atlantic and Mediterranean · call 2018 · Jan 2019 → Dec 2023 · investment €6.9m
MedTIS III
€2.7m
CompletedAssociation des sociétés francaises d'autoroutes (ASFA) (Francia) · Road · Mediterranean Corridor · call 2016 · Feb 2017 → Dec 2021 · investment €13.5m
Mejora de las conexiones y el desarrollo de la Plataforma Logística Multimodal en el Puerto de Sevilla, el único puerto interior del sur de Europa.
€2.7m
CompletedAutoridad Portuaria de Sevilla · Multimodal · Mediterranean Corridor · call 2015 · Jan 2017 → Mar 2020 · investment €16.2m
Green and Connected Ports (GREEN C PORTS)
€2.3m
CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2018 · Apr 2019 → Mar 2023 · investment €4.6m
MedTIS II
€2.3m
CompletedAssociation professionnelle des societes francaises concessionnaires ou exploitantes deautoroutes ou deouvrages routiers (ASFA) · Road · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €11.5m
Bclink_MoS for the future
€2.1m
CompletedAutoritá di Sistema Portuale del Mar Tirreno Centro Settentrionale (Italia) · Maritime · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2024 · investment €14.2m
BioLNG EuroNet
€2m
CompletedShell Western LNG B.V (Holanda) · Road · Atlantic and Mediterranean · call 2017 · Apr 2018 → Dec 2024 · investment €9.8m
LNGHIVE2 Vessels Demand2: Completing Green Links
€1.9m
CompletedBalèaria Eurolíneas Marítimas SA · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2022 · investment €12.7m
Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport
€1.9m
CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m
EALINGWorks Valenciaport: Preparation of the electrical grid of the Port of Valencia for Onshore Power Supply
€1.8m
CompletedFUNDACIÓN VALENCIAPORT · Maritime · Mediterranean Corridor · call 2019 · Apr 2020 → Dec 2024 · investment €8.6m
Caresmatic - apoyo a la distribución de coches y coches eléctricos utilizando las soluciones de las autopistas del mar y promoviendo conceptos de transporte marítimo sostenible.
€1.7m
CompletedLuka Koper (Puerto de Koper) · Maritime · Mediterranean Corridor · call 2015 · Mar 2016 → Mar 2020 · investment €5.6m
Remodelación del complejo ferroviario de Chamartín en Madrid para adaptar los servicios de Alta Velocidad.
€1.6m
CompletedMinisterio de Fomento - Secretaria de Estado de Infraestructuras Transporte y Vivienda · Rail · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2020 · investment €3.2m
Proyecto CIRVE
€1.6m
CompletedIBIL Gestor de Carga del vehículo eléctrico S.A. · Road · Atlantic and Mediterranean · call 2015 · Jul 2016 → Dec 2021 · investment €3.2m
Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors in Spain & Portugal
€1.5m
CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jan 2021 → Dec 2024 · investment €10m
Airis-ps. Implantación avanzada de los ris en el puerto de sevilla y guadalquivir euroway: la única vía navegable terrestre de españa en tent core netobra
€1.4m
CompletedAutoridad Portuaria de Sevilla · Inland waterways · Mediterranean Corridor · call 2015 · Jan 2017 → Apr 2021 · investment €2.9m
Frigorail - Transporte ferroviario refrigerado entre España, Francia y Bélgica, utilizando corredores TEN-T
€1.3m
CompletedCOMSA RAIL TRANSPORT, SA · Rail · Mediterranean Corridor · call 2014 · Sept 2015 → Aug 2019 · investment €6.5m
Chameleom. Creación de lng road haulage market de forma inteligente y rápida
€1.3m
CompletedHam Criogénica · Road · Mediterranean Corridor · call 2015 · Feb 2016 → Jun 2019 · investment €2.5m
ECO-Net_Spanish network of alternative fuels refuelling stations
€1.3m
CompletedENAGAS · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2023 · investment €12.6m
IMAB. Interconexión de redes, puerto, aeropuerto y gestión óptima del tráfico en el área metropolitana de Barcelona, nodo del corredor europeo mediterráneo.
€1.3m
CompletedAyuntamiento Barcelona · Road · Mediterranean Corridor · call 2015 · Apr 2016 → Sept 2022 · investment €2.5m
Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.
€1.2m
CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m
Despliegue avanzado de soluciones innovadoras para mejorar la gestión y operación del tráfico ferroviario en la red núcleo.
€1.2m
CompletedAutoridad Portuaria de Sevilla · Rail · Mediterranean Corridor · call 2016 · Sept 2017 → Dec 2021 · investment €2.4m
Variable Gauge for Freight Transport (Eje de Ancho Variable para Mercancías - EAVM)
€1.1m
CompletedADIF · Rail · Mediterranean Corridor · call 2018 · Nov 2018 → Jun 2021 · investment €2.3m
Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado
€1m
CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m
Estudios para el desarrollo de un terminal intermodal y área de actividad logística asociada (LAA de Murcia)
€970,450
CompletedConsejería de Fomento e Infraestructuras de la Región de Murcia (CARM) · Multimodal · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2022 · investment €1.9m
AIRIS II-SYNCHRO. Synchromodal Traffic & Transport Information Services
€850,000
CompletedAutoridad Portuaria Sevilla · Inland waterways · Mediterranean Corridor · call 2018 · May 2019 → Aug 2022 · investment €1.7m
E-via - movilidad flex-e en at, de, es, fr, it
€811,575
CompletedENEL SpA (Italia) · Road · Atlantic and Mediterranean · call 2016 · Jul 2017 → Mar 2022 · investment €1.6m
Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"
€750,000
CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m
Parking seguros
€750,000
CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLíFEROS S.A. · Road · Atlantic and Mediterranean · call 2014 · Jan 2014 → Dec 2017 · investment €1.5m
Eliminación de cuellos de botella que impiden que el puerto de Cartagena conecte la red central y mejora el tráfico urbano (estudios)
€647,500
CompletedAutoridad Portuaria de Cartagena · Maritime · Mediterranean Corridor · call 2016 · Jan 2017 → Dec 2022 · investment €1.3m
Vinculación Zaragoza: conectividad urbana con la red central.
€589,838
CompletedConsorcio de Transporte del Área de Zaragoza · Rail · Mediterranean Corridor · call 2016 · Feb 2017 → Aug 2019 · investment €1.2m
Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1
€540,000
CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m
Corredor Atlántico / Mediterráneo. Nodo urbano de madrid. Estudios de adaptación mejorada e intermodal de la estación de Chamartín y acceso HSL al aeropuerto de Madrid.
€500,000
CompletedMinisterio de Fomento · Rail · Atlantic and Mediterranean · call 2015 · May 2016 → Jun 2019 · investment €1m
Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal
€492,500
CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m
Mejora y fortalecimiento del Corredor de Carga Ferroviaria 6 - Corredor Mediterráneo, incluida la extensión a Croacia.
€400,000
CompletedGEIE per il Corridoio Merci 6 EEIG for Rail Freight Corridor 6 · Rail · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2018 · investment €800,000
Nuevo acceso sur por ferrocarril y carretera al Puerto de Barcelona - Fase 2 - Obras de conexión.
€36.1m
TerminatedAutoridad Portuaria de Barcelona · Multimodal · Mediterranean Corridor · call 2014 · Jul 2015 → Dec 2018 · investment €120.4m
MiRO 2 - Multimodal Route connecting Barcelona to Paris
€11.1m
TerminatedVIIA (Francia) · Multimodal · Mediterranean Corridor · call 2018 · Feb 2019 → Dec 2023 · investment €55.4m
Establishment of a new intermodal terminal at BASF ESPAÑOLA, S.L. in Tarragona - Spain - for modal shift between rail and road
€5.5m
TerminatedCOMBI TERMINAL CATALONIA, S.L. · Multimodal · Mediterranean Corridor · call 2014 · Oct 2015 → Sept 2019 · investment €25.5m
Plataforma Logística Intermodal Constanti
€1.4m
TerminatedREPSOL QUíMICA S.A. · Rail · Mediterranean Corridor · call 2014 · Jun 2015 → Dec 2018 · investment €7m
Corredor Atlántico / MED. Tren de alta velocidad Sines / Lisboa - Madrid. Nodo urbano de madrid. Estudio del Complejo Ferroviario de la Estación de Atocha (Fase 2).
€1.1m
TerminatedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2015 · Dec 2016 → Dec 2019 · investment €2.2m
Safe and Secure Parking Areas for Heavy-Duty Vehicles in Spanish Petrol Service Stations
€494,880
TerminatedREPSOL · Road · Atlantic and Mediterranean · call 2018 · Nov 2018 → Dec 2022 · investment €2.5m