7-day average · Estimated total volume
0 t
28-day average
916 t
Vs 28-day average
-100.0%
Year on year (same week)
-100.0%
Estimated total volume — daily series
AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.
By vessel type
| Type | Port calls | Est. imports | Est. exports |
|---|---|---|---|
| Container | 0 | 0 t | 0 t |
| Dry bulk | 2 | 23 kt | 0 t |
| General cargo | 1 | 0 t | 2.7 kt |
| Ro-Ro | 0 | 0 t | 0 t |
| Tanker | 3 | 0 t | 181 t |
Main connections
Full footprint: all 35 connections of Majunga aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).
Where vessels arrive from
Ports of origin (upstream)
- 1.Port de LongoniMayotte1.3 days between calls
- 2.Tulear (Toliara)Madagascar2.7 days between calls
- 3.AndoanyMadagascar1.1 days between calls
- 4.Antsiranana (Diego Suarez)Madagascar1.7 days between calls
- 5.ToamasinaMadagascar4.7 days between calls
Where they sail on to
Destination ports (downstream)
- 1.Antsiranana (Diego Suarez)Madagascar5.1 days between calls
- 2.ToamasinaMadagascar7.0 days between calls
- 3.Tulear (Toliara)Madagascar2.6 days between calls
- 4.AndoanyMadagascar1.6 days between calls
- 5.Port LouisMauritius5.3 days between calls
IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.
Indicators · EED Data