Majunga: 509 t/day estimated with Antsiranana (Diego Suarez) Majunga Toamasina: 461 t/day estimated with Antsiranana (Diego Suarez) Toamasina Andoany: 216 t/day estimated with Antsiranana (Diego Suarez) Andoany Port Louis: 210 t/day estimated with Antsiranana (Diego Suarez) Port Louis Port de Longoni: 73 t/day estimated with Antsiranana (Diego Suarez) Port de Longoni Port Est: 42 t/day estimated with Antsiranana (Diego Suarez) Port Est Al Adabiyah: 38 t/day estimated with Antsiranana (Diego Suarez) Al Adabiyah Moroni: 33 t/day estimated with Antsiranana (Diego Suarez) Moroni Port Elizabeth: 29 t/day estimated with Antsiranana (Diego Suarez) Port Elizabeth Zhanjiang: 25 t/day estimated with Antsiranana (Diego Suarez) Zhanjiang Fangcheng: 25 t/day estimated with Antsiranana (Diego Suarez) Fangcheng Tulear (Toliara): 18 t/day estimated with Antsiranana (Diego Suarez) Tulear (Toliara) Karachi: 14 t/day estimated with Antsiranana (Diego Suarez) Karachi Lianyungang: 13 t/day estimated with Antsiranana (Diego Suarez) Lianyungang Victoria: 13 t/day estimated with Antsiranana (Diego Suarez) Victoria Khor Fakkan: 9 t/day estimated with Antsiranana (Diego Suarez) Khor Fakkan Colombo: 9 t/day estimated with Antsiranana (Diego Suarez) Colombo Paranaguá: 8 t/day estimated with Antsiranana (Diego Suarez) Paranaguá Dung Quat: 8 t/day estimated with Antsiranana (Diego Suarez) Dung Quat Ehoala: 6 t/day estimated with Antsiranana (Diego Suarez) Ehoala Mombasa: 6 t/day estimated with Antsiranana (Diego Suarez) Mombasa Istanbul: 2 t/day estimated with Antsiranana (Diego Suarez) Istanbul Salalah: 2 t/day estimated with Antsiranana (Diego Suarez) Salalah Las Palmas (de Gran Canaria): 2 t/day estimated with Antsiranana (Diego Suarez) Las Palmas (de Gran Canaria) Singapore: 2 t/day estimated with Antsiranana (Diego Suarez) Singapore Nacala: 1 t/day estimated with Antsiranana (Diego Suarez) Nacala Maputo: 1 t/day estimated with Antsiranana (Diego Suarez) Maputo Antsiranana (Diego Suarez) + − ⌂
click to enable scroll zoom · drag to pan Full footprint: all 27 connections of Antsiranana (Diego Suarez) aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).
Where vessels arrive from
Ports of origin (upstream)
1. Majunga Madagascar 5.1 days between calls
2. Toamasina Madagascar 4.4 days between calls
3. Andoany Madagascar 1.0 days between calls
4. Port de Longoni Mayotte 2.5 days between calls
IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.