Port profile · Maritime Radar

Port of Akita daily activity

Akita handled an estimated average of 1.9 kt a day in the week ending 25 September 2026 (-16.2% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPAXT · Main cargo sectors: Mineral Products, Wood & Wood Products, Chemical & Allied Industries

Data up to · 25 September 2026

7-day average · Estimated total volume

1.9 kt

28-day average

8.2 kt

Vs 28-day average

-76.3%

Year on year (same week)

-16.2%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container132.6 kt12 kt
Dry bulk1186 kt2.5 kt
General cargo126.7 kt2.6 kt
Ro-Ro00 t0 t
Tanker26100 kt17 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Tomakomai: 2,013 t/day estimated with AkitaTomakomaiBusan: 1,324 t/day estimated with AkitaBusanUlsan: 1,196 t/day estimated with AkitaUlsanNiigata: 1,081 t/day estimated with AkitaNiigataChiba: 903 t/day estimated with AkitaChibaHimekawa: 794 t/day estimated with AkitaHimekawaHakodate: 735 t/day estimated with AkitaHakodateHachinohe: 681 t/day estimated with AkitaHachinoheLos Angeles-Long Beach: 610 t/day estimated with AkitaLos Angeles-Long BeachSakata: 527 t/day estimated with AkitaSakataManzanillo: 522 t/day estimated with AkitaManzanilloKanda: 482 t/day estimated with AkitaKandaKashima-Ibaraki: 469 t/day estimated with AkitaKashima-IbarakiUbe: 436 t/day estimated with AkitaUbeDung Quat: 382 t/day estimated with AkitaDung QuatSendai-Shiogama: 363 t/day estimated with AkitaSendai-ShiogamaIshinomaki: 337 t/day estimated with AkitaIshinomakiOnahama: 321 t/day estimated with AkitaOnahamaIwakuni: 315 t/day estimated with AkitaIwakuniFushiki-Toyama: 312 t/day estimated with AkitaFushiki-ToyamaMuroran: 284 t/day estimated with AkitaMuroranRichards Bay: 251 t/day estimated with AkitaRichards BayDonghae: 244 t/day estimated with AkitaDonghaeYatsushiro: 222 t/day estimated with AkitaYatsushiroPortland: 220 t/day estimated with AkitaPortlandVancouver: 198 t/day estimated with AkitaVancouverGwangyang (Kwangyang): 194 t/day estimated with AkitaGwangyang (Kwangyang)Lianyungang: 186 t/day estimated with AkitaLianyungangMejillones: 178 t/day estimated with AkitaMejillonesCallao: 171 t/day estimated with AkitaCallaoGuaymas: 166 t/day estimated with AkitaGuaymasNaoetsu: 166 t/day estimated with AkitaNaoetsuKawasaki: 164 t/day estimated with AkitaKawasakiTaichung: 158 t/day estimated with AkitaTaichungShanghai: 145 t/day estimated with AkitaShanghaiOita: 141 t/day estimated with AkitaOitaQingdao Port: 141 t/day estimated with AkitaQingdao PortKushiro: 137 t/day estimated with AkitaKushiroFangcheng: 136 t/day estimated with AkitaFangchengNiihama: 122 t/day estimated with AkitaNiihamaAntofagasta: 122 t/day estimated with AkitaAntofagastaMizushima: 120 t/day estimated with AkitaMizushimaYokkaichi: 116 t/day estimated with AkitaYokkaichiIshikariwan-Shinko: 114 t/day estimated with AkitaIshikariwan-ShinkoAomori: 108 t/day estimated with AkitaAomoriHimeji: 107 t/day estimated with AkitaHimejiKanazawa: 94 t/day estimated with AkitaKanazawaSaganoseki: 89 t/day estimated with AkitaSaganosekiTokuyama: 85 t/day estimated with AkitaTokuyamaHon Gai: 83 t/day estimated with AkitaHon GaiYokohama: 83 t/day estimated with AkitaYokohamaMatarani: 81 t/day estimated with AkitaMataraniNanao: 73 t/day estimated with AkitaNanaoRada De Arica: 72 t/day estimated with AkitaRada De AricaYantai: 69 t/day estimated with AkitaYantaiXiagong: 67 t/day estimated with AkitaXiagongTaboguilla: 67 t/day estimated with AkitaTaboguillaVanino: 63 t/day estimated with AkitaVaninoMarin: 62 t/day estimated with AkitaMarinKota Baru: 62 t/day estimated with AkitaKota BaruKitakyushu (Wakamatsu): 61 t/day estimated with AkitaSakai-Semboku: 61 t/day estimated with AkitaNoshiro: 56 t/day estimated with AkitaTagonoura: 52 t/day estimated with AkitaSiam Seaport: 50 t/day estimated with AkitaNagoya: 46 t/day estimated with AkitaBunbury: 46 t/day estimated with AkitaZhapu: 44 t/day estimated with AkitaRumoi: 41 t/day estimated with AkitaSuzhou (Zhangjiagang): 38 t/day estimated with AkitaCoronel: 38 t/day estimated with AkitaRio Grande: 38 t/day estimated with AkitaVostochnyy: 36 t/day estimated with AkitaManila: 35 t/day estimated with AkitaHibikinada: 35 t/day estimated with AkitaFukui: 35 t/day estimated with AkitaShougang Jingtang: 34 t/day estimated with AkitaKanokawa: 33 t/day estimated with AkitaHakata: 32 t/day estimated with AkitaPohang: 30 t/day estimated with AkitaGeelong: 30 t/day estimated with AkitaJiangyin: 29 t/day estimated with AkitaTianjin Xin Gang: 28 t/day estimated with AkitaJinzhou: 28 t/day estimated with AkitaXiamen: 27 t/day estimated with AkitaVladivostok: 26 t/day estimated with AkitaRizhao: 25 t/day estimated with AkitaTangshan (Jingtang): 25 t/day estimated with AkitaKaohsiung: 25 t/day estimated with AkitaTokachi: 23 t/day estimated with AkitaDongjiakou: 23 t/day estimated with AkitaTownsville: 23 t/day estimated with AkitaJebel Ali: 22 t/day estimated with AkitaJohor: 22 t/day estimated with AkitaLongkou Gang: 22 t/day estimated with AkitaTsuruga: 21 t/day estimated with AkitaWeifang Port: 21 t/day estimated with AkitaLas Palmas (de Gran Canaria): 21 t/day estimated with AkitaHouston (US-TX): 21 t/day estimated with AkitaOfunato: 21 t/day estimated with AkitaLanqiao Port: 21 t/day estimated with AkitaFunabashi: 20 t/day estimated with AkitaPort Klang: 20 t/day estimated with AkitaSakai: 20 t/day estimated with AkitaWakayama-Shimotsu: 19 t/day estimated with AkitaSuao: 19 t/day estimated with AkitaShimizu: 19 t/day estimated with AkitaMasao: 18 t/day estimated with AkitaMaizuru: 18 t/day estimated with AkitaSalaverry: 17 t/day estimated with AkitaSingapore: 17 t/day estimated with AkitaBuenaventura: 16 t/day estimated with AkitaNanaimo: 16 t/day estimated with AkitaSuzhou (Taicang): 16 t/day estimated with AkitaFukuyama: 16 t/day estimated with AkitaKobe: 15 t/day estimated with AkitaPunta Lobitos: 15 t/day estimated with AkitaZhoushan: 15 t/day estimated with AkitaBatangas City: 15 t/day estimated with AkitaMoji: 15 t/day estimated with AkitaAlbany: 15 t/day estimated with AkitaKikuma: 15 t/day estimated with AkitaMontevideo: 14 t/day estimated with AkitaNew Westminster: 14 t/day estimated with AkitaEmpire: 14 t/day estimated with AkitaNewcastle: 14 t/day estimated with AkitaHitachi: 14 t/day estimated with AkitaKomatsushima: 14 t/day estimated with AkitaSaigon: 13 t/day estimated with AkitaTeluk Bayur: 13 t/day estimated with AkitaKisarazu: 12 t/day estimated with AkitaSan Martin: 12 t/day estimated with AkitaDa Nang: 12 t/day estimated with AkitaPyeongtaek: 12 t/day estimated with AkitaHualien: 12 t/day estimated with AkitaBell Bay: 11 t/day estimated with AkitaBayuquan: 11 t/day estimated with AkitaBeihai: 10 t/day estimated with AkitaSakaide: 10 t/day estimated with AkitaGunsan: 10 t/day estimated with AkitaBahia Quintero (Ventanas): 9 t/day estimated with AkitaLongview: 9 t/day estimated with AkitaTanjung Priok: 9 t/day estimated with AkitaTaipei: 8 t/day estimated with AkitaTokyo: 8 t/day estimated with AkitaNemrut Bay: 7 t/day estimated with AkitaKuantan: 7 t/day estimated with AkitaKeelung: 7 t/day estimated with AkitaFuzhou: 7 t/day estimated with AkitaHai Phong: 7 t/day estimated with AkitaMatsuyama: 7 t/day estimated with AkitaKamaishi: 7 t/day estimated with AkitaKagoshima: 6 t/day estimated with AkitaIligan: 6 t/day estimated with AkitaIncheon: 5 t/day estimated with AkitaRotterdam: 5 t/day estimated with AkitaDalian: 5 t/day estimated with AkitaBaltimore: 5 t/day estimated with AkitaCai Mep: 5 t/day estimated with AkitaNakhodka: 5 t/day estimated with AkitaOnomichi-Itozaki: 5 t/day estimated with AkitaOtaru: 4 t/day estimated with AkitaDumai: 4 t/day estimated with AkitaYangon: 4 t/day estimated with AkitaOnoda: 4 t/day estimated with AkitaHong Kong: 4 t/day estimated with AkitaDandong: 3 t/day estimated with AkitaOsaka: 3 t/day estimated with AkitaUno: 3 t/day estimated with AkitaYawatahama: 3 t/day estimated with AkitaNew Orleans: 3 t/day estimated with AkitaTanjunguban: 3 t/day estimated with AkitaHamada: 3 t/day estimated with AkitaMikawa: 3 t/day estimated with AkitaKemaman Harbor: 3 t/day estimated with AkitaCalaca: 3 t/day estimated with AkitaNingbo: 3 t/day estimated with AkitaChofu: 3 t/day estimated with AkitaDafeng: 3 t/day estimated with AkitaKiire: 2 t/day estimated with AkitaTsukumi: 2 t/day estimated with AkitaHenza Island: 2 t/day estimated with AkitaSandakan: 2 t/day estimated with AkitaZhouliwang: 2 t/day estimated with AkitaXiuyu: 2 t/day estimated with AkitaMarugame: 2 t/day estimated with AkitaChittagong: 2 t/day estimated with AkitaLNG Tangguh: 2 t/day estimated with AkitaSanshandaocun: 2 t/day estimated with AkitaTawau: 2 t/day estimated with AkitaDavao: 2 t/day estimated with AkitaYokosuka: 2 t/day estimated with AkitaDunkirk: 1 t/day estimated with AkitaTaranto: 1 t/day estimated with AkitaHososhima: 1 t/day estimated with AkitaZhanjiang: 1 t/day estimated with AkitaMasan: 1 t/day estimated with AkitaEsbjerg: 1 t/day estimated with AkitaAko: 1 t/day estimated with AkitaLuanjiakou: 1 t/day estimated with AkitaAkita
click to enable scroll zoom · drag to pan

Full footprint: all 221 connections of Akita aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.TomakomaiJapan1.7 days between calls
  2. 2.NiigataJapan1.6 days between calls
  3. 3.Los Angeles-Long BeachUnited States23.0 days between calls
  4. 4.ChibaJapan3.3 days between calls
  5. 5.HachinoheJapan1.9 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.TomakomaiJapan1.2 days between calls
  2. 2.BusanKorea3.1 days between calls
  3. 3.UlsanKorea5.7 days between calls
  4. 4.NiigataJapan1.3 days between calls
  5. 5.ChibaJapan2.9 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)