Singapore: 23,559 t/day estimated with Fujairah Singapore Shuaiba: 13,540 t/day estimated with Fujairah Shuaiba Jebel Ali: 10,094 t/day estimated with Fujairah Jebel Ali Umm Qasr: 9,993 t/day estimated with Fujairah Umm Qasr Jubail: 8,348 t/day estimated with Fujairah Jubail Doha-Umm Said: 7,410 t/day estimated with Fujairah Doha-Umm Said Bashayer: 6,699 t/day estimated with Fujairah Bashayer Al Hamriyah LPG Terminal: 5,428 t/day estimated with Fujairah Al Hamriyah LPG Terminal Ras Tanura: 5,152 t/day estimated with Fujairah Ras Tanura Port of Sohar: 4,811 t/day estimated with Fujairah Port of Sohar Yanbu (King Fahd Port): 4,745 t/day estimated with Fujairah Yanbu (King Fahd Port) Mombasa: 4,558 t/day estimated with Fujairah Mombasa Sitrah: 4,317 t/day estimated with Fujairah Sitrah Mina Al Ahmadi: 3,608 t/day estimated with Fujairah Mina Al Ahmadi Mumbai-Jawaharlal Nehru (Nhava Sheva): 2,984 t/day estimated with Fujairah Mumbai-Jawaharlal Nehru (Nhava Sheva) Tanjung Pelepas: 2,845 t/day estimated with Fujairah Tanjung Pelepas Karachi: 2,647 t/day estimated with Fujairah Karachi Jabal Az Zannah-Ruways: 2,642 t/day estimated with Fujairah Jabal Az Zannah-Ruways Dar Es Salaam: 2,551 t/day estimated with Fujairah Dar Es Salaam Djibouti: 2,502 t/day estimated with Fujairah Djibouti Muhammad Bin Qasim: 2,496 t/day estimated with Fujairah Muhammad Bin Qasim Taman: 2,261 t/day estimated with Fujairah Taman Rotterdam: 2,197 t/day estimated with Fujairah Rotterdam Sikka: 2,075 t/day estimated with Fujairah Sikka Ulsan: 2,013 t/day estimated with Fujairah Ulsan Gwangyang (Kwangyang): 1,913 t/day estimated with Fujairah Gwangyang (Kwangyang) Port Louis: 1,898 t/day estimated with Fujairah Port Louis Novorossiysk: 1,894 t/day estimated with Fujairah Novorossiysk Ust-Luga: 1,795 t/day estimated with Fujairah Ust-Luga Durban: 1,757 t/day estimated with Fujairah Durban Rabigh: 1,688 t/day estimated with Fujairah Rabigh Comodoro Rivadavia: 1,660 t/day estimated with Fujairah Comodoro Rivadavia Ras Laffan: 1,605 t/day estimated with Fujairah Ras Laffan New Mangalore: 1,582 t/day estimated with Fujairah New Mangalore Port Sudan: 1,491 t/day estimated with Fujairah Port Sudan Maputo: 1,427 t/day estimated with Fujairah Maputo Aden: 1,401 t/day estimated with Fujairah Aden Zhoushan: 1,374 t/day estimated with Fujairah Zhoushan Kandla: 1,332 t/day estimated with Fujairah Kandla Johor: 1,307 t/day estimated with Fujairah Johor Sharjah: 1,247 t/day estimated with Fujairah Sharjah Pengerang: 1,208 t/day estimated with Fujairah Pengerang Male: 1,193 t/day estimated with Fujairah Male Beira: 1,165 t/day estimated with Fujairah Beira Colombo: 1,122 t/day estimated with Fujairah Colombo Jeddah: 1,111 t/day estimated with Fujairah Jeddah Daesan: 1,100 t/day estimated with Fujairah Daesan El Sokhna: 1,063 t/day estimated with Fujairah El Sokhna Antwerp: 1,060 t/day estimated with Fujairah Antwerp Victoria: 988 t/day estimated with Fujairah Victoria Dubai: 974 t/day estimated with Fujairah Dubai Gulei: 947 t/day estimated with Fujairah Gulei Houston (US-TX): 871 t/day estimated with Fujairah Houston (US-TX) Port Est: 851 t/day estimated with Fujairah Port Est Kaohsiung: 840 t/day estimated with Fujairah Kaohsiung Chennai (Madras): 831 t/day estimated with Fujairah Chennai (Madras) New Orleans: 806 t/day estimated with Fujairah New Orleans Richards Bay: 754 t/day estimated with Fujairah Richards Bay Toamasina: 716 t/day estimated with Fujairah Toamasina Dongjiakou: 715 t/day estimated with Fujairah Dongjiakou Primorsk: 712 t/day estimated with Fujairah Lanqiao Port: 703 t/day estimated with Fujairah Visakhapatnam: 702 t/day estimated with Fujairah Chiba: 686 t/day estimated with Fujairah Shanghai (Yangshan): 669 t/day estimated with Fujairah Mukalla: 666 t/day estimated with Fujairah Oita: 665 t/day estimated with Fujairah Mailiao: 657 t/day estimated with Fujairah Qingdao Port: 613 t/day estimated with Fujairah Tanga: 604 t/day estimated with Fujairah Aliaga: 596 t/day estimated with Fujairah Agioi Oil Terminal: 587 t/day estimated with Fujairah Cape Town: 562 t/day estimated with Fujairah Saint Petersburg: 557 t/day estimated with Fujairah Algeciras: 546 t/day estimated with Fujairah Tuban: 542 t/day estimated with Fujairah Ningbo: 541 t/day estimated with Fujairah Khor Fakkan: 516 t/day estimated with Fujairah New York-New Jersey: 500 t/day estimated with Fujairah Mundra: 494 t/day estimated with Fujairah Trieste: 487 t/day estimated with Fujairah Karimun: 483 t/day estimated with Fujairah Las Palmas (de Gran Canaria): 470 t/day estimated with Fujairah Le Havre: 462 t/day estimated with Fujairah Tianjin Xin Gang: 447 t/day estimated with Fujairah Hazira: 430 t/day estimated with Fujairah Nakhodka: 425 t/day estimated with Fujairah Mogadishu: 419 t/day estimated with Fujairah Dalian: 413 t/day estimated with Fujairah Shanghai: 406 t/day estimated with Fujairah Mina Saqr: 400 t/day estimated with Fujairah Shuqaiq: 388 t/day estimated with Fujairah Walvis Bay: 385 t/day estimated with Fujairah Nacala: 382 t/day estimated with Fujairah Port Dickson: 381 t/day estimated with Fujairah Longkou Gang: 381 t/day estimated with Fujairah Chittagong: 376 t/day estimated with Fujairah Sakai-Semboku: 375 t/day estimated with Fujairah Barcelona: 368 t/day estimated with Fujairah Tuticorin: 368 t/day estimated with Fujairah Port Elizabeth: 364 t/day estimated with Fujairah Aqaba: 363 t/day estimated with Fujairah Constantza: 361 t/day estimated with Fujairah Istanbul: 353 t/day estimated with Fujairah Map Ta Phut: 347 t/day estimated with Fujairah Yarimca: 347 t/day estimated with Fujairah Milazzo: 343 t/day estimated with Fujairah Dahej: 342 t/day estimated with Fujairah Madre De Deus: 341 t/day estimated with Fujairah Gdansk: 340 t/day estimated with Fujairah Krishnapatnam Port: 334 t/day estimated with Fujairah Salalah: 322 t/day estimated with Fujairah Khalifa Port: 320 t/day estimated with Fujairah Amsterdam: 318 t/day estimated with Fujairah Paradip: 314 t/day estimated with Fujairah Luanda: 309 t/day estimated with Fujairah Augusta: 307 t/day estimated with Fujairah Fos: 299 t/day estimated with Fujairah Hudaydah (Hodeidah): 296 t/day estimated with Fujairah Tanjung Sekong: 293 t/day estimated with Fujairah Haldia: 286 t/day estimated with Fujairah Rayong: 281 t/day estimated with Fujairah Manila: 279 t/day estimated with Fujairah Sarroch Oil Terminal: 278 t/day estimated with Fujairah Port Klang: 276 t/day estimated with Fujairah Vado Ligure: 271 t/day estimated with Fujairah Ras Isa Terminal: 270 t/day estimated with Fujairah Pachi: 270 t/day estimated with Fujairah Juaymah: 257 t/day estimated with Fujairah Mormugao: 256 t/day estimated with Fujairah Geelong: 252 t/day estimated with Fujairah Banten: 250 t/day estimated with Fujairah Corpus Christi: 241 t/day estimated with Fujairah Dammam: 240 t/day estimated with Fujairah Fremantle: 237 t/day estimated with Fujairah Sidi Kerir: 229 t/day estimated with Fujairah Bandar-E Pars Terminal: 220 t/day estimated with Fujairah Abu Dhabi: 211 t/day estimated with Fujairah Zhouliwang: 210 t/day estimated with Fujairah Limetree Bay: 206 t/day estimated with Fujairah Melbourne: 201 t/day estimated with Fujairah Santa Panagia: 195 t/day estimated with Fujairah Berbera: 193 t/day estimated with Fujairah Bayuquan: 193 t/day estimated with Fujairah Shougang Jingtang: 186 t/day estimated with Fujairah Los Angeles-Long Beach: 185 t/day estimated with Fujairah Barbor's Point: 185 t/day estimated with Fujairah Serangoon Harbor: 180 t/day estimated with Fujairah Tarragona: 177 t/day estimated with Fujairah Cartagena: 171 t/day estimated with Fujairah Port Botany: 169 t/day estimated with Fujairah Bilbao: 166 t/day estimated with Fujairah Zhanjiang: 166 t/day estimated with Fujairah Duqm: 163 t/day estimated with Fujairah Huanghua: 157 t/day estimated with Fujairah Suzhou (Taicang): 156 t/day estimated with Fujairah Genova: 155 t/day estimated with Fujairah Milford Haven: 152 t/day estimated with Fujairah Wilhelmshaven: 152 t/day estimated with Fujairah Botas: 149 t/day estimated with Fujairah Vancouver: 149 t/day estimated with Fujairah Xiuyu: 146 t/day estimated with Fujairah Marcus Hook: 144 t/day estimated with Fujairah Brisbane: 143 t/day estimated with Fujairah Cochin (Kochi): 138 t/day estimated with Fujairah Skikda (Port Methanier): 138 t/day estimated with Fujairah Das Island: 137 t/day estimated with Fujairah Murmansk: 136 t/day estimated with Fujairah Vysotsk: 136 t/day estimated with Fujairah Batangas City: 134 t/day estimated with Fujairah Point Tupper: 134 t/day estimated with Fujairah Bontang LNG Terminal: 130 t/day estimated with Fujairah Sines: 129 t/day estimated with Fujairah Ventspils: 122 t/day estimated with Fujairah Incheon: 117 t/day estimated with Fujairah Botas Natural Gas Terminal: 116 t/day estimated with Fujairah Hong Kong: 115 t/day estimated with Fujairah Paranaguá: 113 t/day estimated with Fujairah Moroni: 112 t/day estimated with Fujairah Bahia Blanca: 112 t/day estimated with Fujairah Sanshandaocun: 111 t/day estimated with Fujairah Delta Terminal: 110 t/day estimated with Fujairah Port de Longoni: 109 t/day estimated with Fujairah Port Arthur: 109 t/day estimated with Fujairah Mongstad: 108 t/day estimated with Fujairah Yangpu: 106 t/day estimated with Fujairah Marsaxlokk: 105 t/day estimated with Fujairah Omisalj: 103 t/day estimated with Fujairah Taboguilla: 103 t/day estimated with Fujairah Kalundborg: 103 t/day estimated with Fujairah Rizhao: 101 t/day estimated with Fujairah Lianyungang: 101 t/day estimated with Fujairah Port De Salvador: 100 t/day estimated with Fujairah Tokuyama: 100 t/day estimated with Fujairah Western Port: 98 t/day estimated with Fujairah Massawa: 96 t/day estimated with Fujairah Tuapse: 96 t/day estimated with Fujairah Stigsnaes: 95 t/day estimated with Fujairah Bristol: 94 t/day estimated with Fujairah Karaikal: 92 t/day estimated with Fujairah Fujairah + − ⌂
click to enable scroll zoom · drag to pan Full footprint: all 419 connections of Fujairah aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).
Where vessels arrive from
Ports of origin (upstream)
1. Umm Qasr Iraq 10.7 days between calls
2. Jubail Saudi Arabia 6.3 days between calls
3. Bashayer Sudan 13.6 days between calls
4. Singapore Singapore 38.3 days between calls
5. Jebel Ali United Arab Emirates 5.4 days between calls
Where they sail on to
Destination ports (downstream)
1. Singapore Singapore 26.3 days between calls
2. Shuaiba Kuwait 7.5 days between calls
3. Doha-Umm Said Qatar 8.1 days between calls
4. Jebel Ali United Arab Emirates 5.7 days between calls
5. Mombasa Kenya 16.6 days between calls
IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.