Port profile · Maritime Radar

Port of Portland, ME daily activity

Portland, ME handled an estimated average of 1.5 kt a day in the week ending 25 September 2026 (-92.3% year on year), with an average of 0 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
United States · LOCODE USPWM · Main cargo sectors: Chemical & Allied Industries, Mineral Products, Vehicles & Equipment

Data up to · 25 September 2026

7-day average · Estimated total volume

1.5 kt

28-day average

5.2 kt

Vs 28-day average

-70.5%

Year on year (same week)

-92.3%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container414 kt0 t
Dry bulk00 t0 t
General cargo00 t0 t
Ro-Ro00 t0 t
Tanker7132 kt0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Saint John: 6,536 t/day estimated with Portland, MESaint JohnBoston: 785 t/day estimated with Portland, MEBostonVila Do Conde: 707 t/day estimated with Portland, MEVila Do CondeHalifax: 643 t/day estimated with Portland, MEHalifaxSearsport: 556 t/day estimated with Portland, MESearsportReykjavík: 381 t/day estimated with Portland, MEReykjavíkArgentia: 245 t/day estimated with Portland, MEArgentiaProvidence: 241 t/day estimated with Portland, MEProvidencePortmouth: 238 t/day estimated with Portland, MEPortmouthNew York-New Jersey: 220 t/day estimated with Portland, MENew York-New JerseyPoint Tupper: 202 t/day estimated with Portland, MEPoint TupperWhiffen Head: 174 t/day estimated with Portland, MEWhiffen HeadAmsterdam: 172 t/day estimated with Portland, MEAmsterdamRotterdam: 135 t/day estimated with Portland, MERotterdamQuebec: 117 t/day estimated with Portland, MEQuebecAntwerp: 107 t/day estimated with Portland, MEAntwerpBaltimore: 98 t/day estimated with Portland, MEBaltimoreNew Haven: 94 t/day estimated with Portland, MENew HavenCartagena: 67 t/day estimated with Portland, MECartagenaNew Orleans: 52 t/day estimated with Portland, MENew OrleansMontreal: 49 t/day estimated with Portland, MEMontrealWilmington, NC: 48 t/day estimated with Portland, MEWilmington, NCLa Baie (Port Alfred): 43 t/day estimated with Portland, MELa Baie (Port Alfred)Puerto Nuevo: 41 t/day estimated with Portland, MEPuerto NuevoVysotsk: 37 t/day estimated with Portland, MEVysotskMilford Haven: 35 t/day estimated with Portland, MEMilford HavenRas Laffan: 33 t/day estimated with Portland, MERas LaffanSanta Marta: 32 t/day estimated with Portland, MESanta MartaCaleta Patillos: 31 t/day estimated with Portland, MECaleta PatillosAlexandria: 25 t/day estimated with Portland, MEAlexandriaPorto Grande: 20 t/day estimated with Portland, MEPorto GrandeAlgeciras: 19 t/day estimated with Portland, MEAlgecirasMatthew Town: 18 t/day estimated with Portland, MEMatthew TownPort-De-Bouc: 17 t/day estimated with Portland, MEPort-De-BoucTerneuzen: 17 t/day estimated with Portland, METerneuzenMongstad: 17 t/day estimated with Portland, MEMongstadLe Havre: 17 t/day estimated with Portland, MELe HavreSaint John's: 16 t/day estimated with Portland, MESaint John'sCorpus Christi: 16 t/day estimated with Portland, MECorpus ChristiGhent: 16 t/day estimated with Portland, MEGhentFujairah: 16 t/day estimated with Portland, MEFujairahTarragona: 16 t/day estimated with Portland, METarragonaPhiladelphia: 15 t/day estimated with Portland, MEPhiladelphiaHouston (US-TX): 14 t/day estimated with Portland, MEHouston (US-TX)Al Hamriyah LPG Terminal: 13 t/day estimated with Portland, MEAl Hamriyah LPG TerminalVeracruz: 12 t/day estimated with Portland, MEVeracruzHaina: 10 t/day estimated with Portland, MEHainaTampa Port: 8 t/day estimated with Portland, METampa PortLivorno: 6 t/day estimated with Portland, MELivornoMorehead City: 6 t/day estimated with Portland, MEMorehead CityNewport News: 6 t/day estimated with Portland, MENewport NewsBaie Comeau: 5 t/day estimated with Portland, MEBaie ComeauNorfolk: 5 t/day estimated with Portland, MENorfolkAlbany: 3 t/day estimated with Portland, MEAlbanyPort Everglades: 2 t/day estimated with Portland, MEPort EvergladesSan Juan: 2 t/day estimated with Portland, MESan JuanSarnia: 2 t/day estimated with Portland, MESarniaCanaveral Harbor: 1 t/day estimated with Portland, MECanaveral HarborPortland, ME
click to enable scroll zoom · drag to pan

Full footprint: all 58 connections of Portland, ME aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Saint JohnCanada1.0 days between calls
  2. 2.Vila Do CondeBrazil11.7 days between calls
  3. 3.BostonUnited States1.4 days between calls
  4. 4.HalifaxCanada1.1 days between calls
  5. 5.ReykjavíkIceland7.1 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Saint JohnCanada1.8 days between calls
  2. 2.SearsportUnited States0.6 days between calls
  3. 3.BostonUnited States1.5 days between calls
  4. 4.ProvidenceUnited States1.2 days between calls
  5. 5.HalifaxCanada1.3 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)