Port profile · Maritime Radar

Port of Moss daily activity

Moss handled an estimated average of 770 t a day in the week ending 25 September 2026 (-26.7% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Sweden · Main cargo sectors: Mineral Products, Wood & Wood Products, Prepared Foodstuffs & Beverages

Data up to · 25 September 2026

7-day average · Estimated total volume

770 t

28-day average

858 t

Vs 28-day average

-10.3%

Year on year (same week)

-26.7%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container139.4 kt548 t
Dry bulk00 t0 t
General cargo116.7 kt6.8 kt
Ro-Ro3255 t39 t
Tanker1184 t0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Oslo: 782 t/day estimated with MossOsloLarvik: 417 t/day estimated with MossLarvikRotterdam: 383 t/day estimated with MossRotterdamBremerhaven: 196 t/day estimated with MossBremerhavenKristiansand: 191 t/day estimated with MossKristiansandStavanger: 189 t/day estimated with MossStavangerBrevik: 183 t/day estimated with MossBrevikFredrikstad: 176 t/day estimated with MossFredrikstadDrammen: 162 t/day estimated with MossDrammenKlaipeda: 108 t/day estimated with MossKlaipedaHamburg: 95 t/day estimated with MossHamburgPorsgrunn: 78 t/day estimated with MossPorsgrunnImmingham: 73 t/day estimated with MossImminghamTrondheim: 68 t/day estimated with MossTrondheimVentspils: 58 t/day estimated with MossVentspilsGlomfjord: 47 t/day estimated with MossGlomfjordRostock: 43 t/day estimated with MossRostockGdynia: 39 t/day estimated with MossGdyniaKotka: 30 t/day estimated with MossKotkaGdansk: 29 t/day estimated with MossGdanskMarkenes: 28 t/day estimated with MossMarkenesKøge: 28 t/day estimated with MossKøgeMoerdijk: 27 t/day estimated with MossMoerdijkBrunsbuettel: 27 t/day estimated with MossBrunsbuettelDjupviken: 23 t/day estimated with MossDjupvikenSteinkjer: 21 t/day estimated with MossSteinkjerMo i Rana: 20 t/day estimated with MossMo i RanaKøbenhavn: 19 t/day estimated with MossKøbenhavnStade: 19 t/day estimated with MossStadeAarhus: 15 t/day estimated with MossAarhusHelsingborg: 15 t/day estimated with MossHelsingborgRanders: 15 t/day estimated with MossRandersGöteborg: 14 t/day estimated with MossGöteborgFredericia: 13 t/day estimated with MossFredericiaKarlshamn: 13 t/day estimated with MossKarlshamnHirtshals: 13 t/day estimated with MossHirtshalsAntwerp: 12 t/day estimated with MossAntwerpLiepaja: 11 t/day estimated with MossLiepajaVyborg: 11 t/day estimated with MossVyborgRiga: 10 t/day estimated with MossRigaVarberg: 10 t/day estimated with MossVarbergOdense: 9 t/day estimated with MossOdenseWismar: 9 t/day estimated with MossWismarKalundborg: 9 t/day estimated with MossKalundborgThyboron: 8 t/day estimated with MossThyboronMongstad: 8 t/day estimated with MossMongstadKristiansund: 8 t/day estimated with MossKristiansundÅbenrå: 7 t/day estimated with MossÅbenråFlorø: 7 t/day estimated with MossFlorøRouen: 7 t/day estimated with MossRouenEemshaven: 6 t/day estimated with MossEemshavenFredrikshamn: 6 t/day estimated with MossFredrikshamnSkagen: 6 t/day estimated with MossSkagenSwinoujscie: 6 t/day estimated with MossSwinoujscieHalden: 6 t/day estimated with MossHaldenAalborg: 5 t/day estimated with MossAalborgSzczecin: 5 t/day estimated with MossSzczecinLas Palmas (de Gran Canaria): 5 t/day estimated with MossLas Palmas (de Gran Canaria)Nyborg: 5 t/day estimated with MossNyborgKolding: 5 t/day estimated with MossKoldingBrake: 5 t/day estimated with MossFelixstowe: 5 t/day estimated with MossSandnessjøen: 4 t/day estimated with MossÅlesund: 4 t/day estimated with MossRørvik: 4 t/day estimated with MossBarry: 4 t/day estimated with MossEmden: 4 t/day estimated with MossStralsund: 4 t/day estimated with MossHammerfest: 3 t/day estimated with MossIJmuiden: 3 t/day estimated with MossBergen: 3 t/day estimated with MossHull: 3 t/day estimated with MossMåløy: 3 t/day estimated with MossLakselv: 3 t/day estimated with MossFrederikshavn: 3 t/day estimated with MossSölvesborg: 3 t/day estimated with MossSassnitz: 3 t/day estimated with MossCeuta: 3 t/day estimated with MossKunda: 3 t/day estimated with MossSkoldvik: 3 t/day estimated with MossNamsos: 3 t/day estimated with MossLuanda: 3 t/day estimated with MossCuxhaven: 3 t/day estimated with MossLubeck-Travemunde: 3 t/day estimated with MossKokkola: 2 t/day estimated with MossHalmstad: 2 t/day estimated with MossOskarshamn: 2 t/day estimated with MossStigsnaes: 2 t/day estimated with MossGarston: 2 t/day estimated with MossVlissingen: 2 t/day estimated with MossSaint Petersburg: 2 t/day estimated with MossZeebrugge: 2 t/day estimated with MossEsbjerg: 2 t/day estimated with MossHorten: 2 t/day estimated with MossGijon: 2 t/day estimated with MossSkelleftehamn: 2 t/day estimated with MossWaterford: 2 t/day estimated with MossArdal: 2 t/day estimated with MossPaldiski: 2 t/day estimated with MossHaroysundet: 2 t/day estimated with MossRunavik: 2 t/day estimated with MossMalmö: 2 t/day estimated with MossFalkenberg: 2 t/day estimated with MossNewport: 2 t/day estimated with MossSingapore: 2 t/day estimated with MossTananger: 2 t/day estimated with MossNordenham: 2 t/day estimated with MossVikanes: 2 t/day estimated with MossHaugesund: 1 t/day estimated with MossKaliningrad: 1 t/day estimated with MossAmsterdam: 1 t/day estimated with MossSoyo Angola LNG Terminal: 1 t/day estimated with MossSödertälje: 1 t/day estimated with MossLimassol: 1 t/day estimated with MossSouthampton: 1 t/day estimated with MossStora Jatterson: 1 t/day estimated with MossVästerås: 1 t/day estimated with MossWilhelmshaven: 1 t/day estimated with MossFrederiksvaerk: 1 t/day estimated with MossTrelleborg: 1 t/day estimated with MossPärnu: 1 t/day estimated with MossMonfalcone: 1 t/day estimated with MossAveiro: 1 t/day estimated with MossInkoo: 1 t/day estimated with MossSagunto: 1 t/day estimated with MossLondon: 1 t/day estimated with MossSan Giorgio: 1 t/day estimated with MossDrogheda: 1 t/day estimated with MossTynemouth: 1 t/day estimated with MossTeesport: 1 t/day estimated with MossSan Pedro: 1 t/day estimated with MossTallinn: 1 t/day estimated with MossOdda: 1 t/day estimated with MossOxelösund: 1 t/day estimated with MossFlekkefjord: 1 t/day estimated with MossSauda: 1 t/day estimated with MossSillamae: 0 t/day estimated with MossKalmar: 0 t/day estimated with MossRonne: 0 t/day estimated with MossPort Jerome: 0 t/day estimated with MossRosyth: 0 t/day estimated with MossGlasgow: 0 t/day estimated with MossLandskrona: 0 t/day estimated with MossMuuga-Port of Tallinn: 0 t/day estimated with MossTerneuzen: 0 t/day estimated with MossNorrköping: 0 t/day estimated with MossBremen: 0 t/day estimated with MossAlvika: 0 t/day estimated with MossGibraltar: 0 t/day estimated with MossThamshamm: 0 t/day estimated with MossIzhevskoye: 0 t/day estimated with MossCochin (Kochi): 0 t/day estimated with MossMoss
click to enable scroll zoom · drag to pan

Full footprint: all 152 connections of Moss aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.OsloNorway0.2 days between calls
  2. 2.RotterdamThe Netherlands2.4 days between calls
  3. 3.BremerhavenGermany1.2 days between calls
  4. 4.FredrikstadNorway1.3 days between calls
  5. 5.DrammenNorway0.1 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.LarvikNorway0.3 days between calls
  2. 2.KristiansandNorway0.4 days between calls
  3. 3.OsloNorway0.4 days between calls
  4. 4.StavangerNorway1.5 days between calls
  5. 5.BrevikNorway0.2 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)