Port profile · Maritime Radar

Port of Komatsushima daily activity

Komatsushima handled an estimated average of 3.4 kt a day in the week ending 25 September 2026 (+9.6% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPKOM · Main cargo sectors: Mineral Products, Wood & Wood Products, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

3.4 kt

28-day average

3.1 kt

Vs 28-day average

+10.4%

Year on year (same week)

+9.6%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container42.3 kt0 t
Dry bulk1130 kt2.2 kt
General cargo2641 kt2.6 kt
Ro-Ro00 t0 t
Tanker186.9 kt747 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Siam Seaport: 1,281 t/day estimated with KomatsushimaSiam SeaportNagoya: 923 t/day estimated with KomatsushimaNagoyaBusan: 554 t/day estimated with KomatsushimaBusanSakai: 532 t/day estimated with KomatsushimaSakaiKure: 530 t/day estimated with KomatsushimaKureWakayama-Shimotsu: 496 t/day estimated with KomatsushimaWakayama-ShimotsuDa Nang: 338 t/day estimated with KomatsushimaDa NangMizushima: 332 t/day estimated with KomatsushimaMizushimaAko: 313 t/day estimated with KomatsushimaAkoDung Quat: 296 t/day estimated with KomatsushimaDung QuatFushiki-Toyama: 274 t/day estimated with KomatsushimaFushiki-ToyamaHachinohe: 266 t/day estimated with KomatsushimaHachinoheShanghai: 249 t/day estimated with KomatsushimaShanghaiKanda: 217 t/day estimated with KomatsushimaKandaPortland: 215 t/day estimated with KomatsushimaPortlandSakai-Semboku: 200 t/day estimated with KomatsushimaSakai-SembokuVan Phong: 172 t/day estimated with KomatsushimaVan PhongKochi: 172 t/day estimated with KomatsushimaKochiTokuyama: 164 t/day estimated with KomatsushimaTokuyamaFukuyama: 162 t/day estimated with KomatsushimaFukuyamaIwakuni: 160 t/day estimated with KomatsushimaIwakuniKobe: 158 t/day estimated with KomatsushimaKobeQuy Nhon: 149 t/day estimated with KomatsushimaQuy NhonMatsuyama: 146 t/day estimated with KomatsushimaMatsuyamaOsaka: 134 t/day estimated with KomatsushimaOsakaIshikariwan-Shinko: 130 t/day estimated with KomatsushimaIshikariwan-ShinkoShimizu: 116 t/day estimated with KomatsushimaShimizuIshinomaki: 81 t/day estimated with KomatsushimaIshinomakiHon Gai: 80 t/day estimated with KomatsushimaHon GaiKawasaki: 78 t/day estimated with KomatsushimaKawasakiChiba: 71 t/day estimated with KomatsushimaChibaMishima: 69 t/day estimated with KomatsushimaMishimaTakamatsu: 68 t/day estimated with KomatsushimaTakamatsuHamada: 64 t/day estimated with KomatsushimaHamadaTomakomai: 64 t/day estimated with KomatsushimaTomakomaiGeelong: 63 t/day estimated with KomatsushimaGeelongCoronel: 61 t/day estimated with KomatsushimaCoronelImabari: 60 t/day estimated with KomatsushimaImabariOita: 59 t/day estimated with KomatsushimaOitaKitakyushu (Wakamatsu): 58 t/day estimated with KomatsushimaKitakyushu (Wakamatsu)Albany: 55 t/day estimated with KomatsushimaAlbanySusaki: 53 t/day estimated with KomatsushimaSusakiHimeji: 51 t/day estimated with KomatsushimaHimejiBluff Harbor: 48 t/day estimated with KomatsushimaBluff HarborTachibana: 48 t/day estimated with KomatsushimaTachibanaSakaide: 48 t/day estimated with KomatsushimaSakaideDumai: 46 t/day estimated with KomatsushimaDumaiYokkaichi: 46 t/day estimated with KomatsushimaYokkaichiHannan: 45 t/day estimated with KomatsushimaHannanSendai-Shiogama: 44 t/day estimated with KomatsushimaSendai-ShiogamaYokohama: 40 t/day estimated with KomatsushimaYokohamaLos Angeles-Long Beach: 40 t/day estimated with KomatsushimaLos Angeles-Long BeachEmpire: 39 t/day estimated with KomatsushimaEmpireKashima-Ibaraki: 38 t/day estimated with KomatsushimaKashima-IbarakiKisarazu: 37 t/day estimated with KomatsushimaKisarazuRichards Bay: 36 t/day estimated with KomatsushimaRichards BaySaiki: 36 t/day estimated with KomatsushimaSaikiNiihama: 35 t/day estimated with KomatsushimaNiihamaMikawa: 35 t/day estimated with KomatsushimaMikawaFunabashi: 34 t/day estimated with KomatsushimaFunabashiXiagong: 34 t/day estimated with KomatsushimaMuroran: 30 t/day estimated with KomatsushimaHigashiharima: 30 t/day estimated with KomatsushimaBrisbane: 29 t/day estimated with KomatsushimaPort Klang: 29 t/day estimated with KomatsushimaKaohsiung: 28 t/day estimated with KomatsushimaMaizuru: 28 t/day estimated with KomatsushimaLautoka: 26 t/day estimated with KomatsushimaHong Kong: 25 t/day estimated with KomatsushimaMap Ta Phut: 25 t/day estimated with KomatsushimaSuzhou (Taicang): 25 t/day estimated with KomatsushimaShibushi: 24 t/day estimated with KomatsushimaNew Westminster: 24 t/day estimated with KomatsushimaBunbury: 22 t/day estimated with KomatsushimaUlsan: 22 t/day estimated with KomatsushimaBell Bay: 21 t/day estimated with KomatsushimaQushan Island: 20 t/day estimated with KomatsushimaUbe: 20 t/day estimated with KomatsushimaMarugame: 19 t/day estimated with KomatsushimaJohor: 18 t/day estimated with KomatsushimaHiroshima: 18 t/day estimated with KomatsushimaHakata: 18 t/day estimated with KomatsushimaKagoshima: 17 t/day estimated with KomatsushimaManila: 16 t/day estimated with KomatsushimaKuantan: 16 t/day estimated with KomatsushimaLongview: 15 t/day estimated with KomatsushimaHososhima: 15 t/day estimated with KomatsushimaPrince Rupert: 14 t/day estimated with KomatsushimaAkita: 14 t/day estimated with KomatsushimaCai Mep: 14 t/day estimated with KomatsushimaTanjung Priok: 14 t/day estimated with KomatsushimaKeelung: 14 t/day estimated with KomatsushimaTokyo: 13 t/day estimated with KomatsushimaPohang: 13 t/day estimated with KomatsushimaNabouwalu: 12 t/day estimated with KomatsushimaOnahama: 12 t/day estimated with KomatsushimaSaigon: 12 t/day estimated with KomatsushimaSingapore: 10 t/day estimated with KomatsushimaKinuura: 9 t/day estimated with KomatsushimaHibikinada: 8 t/day estimated with KomatsushimaBintulu: 8 t/day estimated with KomatsushimaTeluk Bayur: 8 t/day estimated with KomatsushimaTagonoura: 7 t/day estimated with KomatsushimaTsukumi: 7 t/day estimated with KomatsushimaAmagasaki: 7 t/day estimated with KomatsushimaNghe Tinh: 6 t/day estimated with KomatsushimaHitachi: 6 t/day estimated with KomatsushimaYatsushiro: 6 t/day estimated with KomatsushimaKikuma: 6 t/day estimated with KomatsushimaUno: 5 t/day estimated with KomatsushimaOnomichi-Itozaki: 5 t/day estimated with KomatsushimaKudamatsu: 5 t/day estimated with KomatsushimaBelawan: 4 t/day estimated with KomatsushimaKushiro: 4 t/day estimated with KomatsushimaNiigata: 4 t/day estimated with KomatsushimaUwajima: 4 t/day estimated with KomatsushimaTakuma: 4 t/day estimated with KomatsushimaMatsusaka: 4 t/day estimated with KomatsushimaSurabaya: 3 t/day estimated with KomatsushimaYokosuka: 3 t/day estimated with KomatsushimaDandong: 3 t/day estimated with KomatsushimaCebu: 3 t/day estimated with KomatsushimaHakodate: 3 t/day estimated with KomatsushimaNagasaki: 2 t/day estimated with KomatsushimaSaganoseki: 2 t/day estimated with KomatsushimaNamikata: 2 t/day estimated with KomatsushimaQiwei: 2 t/day estimated with KomatsushimaOnoda: 2 t/day estimated with KomatsushimaTianjin Xin Gang: 2 t/day estimated with KomatsushimaHofu: 2 t/day estimated with KomatsushimaTangshan (Jingtang): 2 t/day estimated with KomatsushimaRumoi: 2 t/day estimated with KomatsushimaMoji: 2 t/day estimated with KomatsushimaMutsure: 2 t/day estimated with KomatsushimaKaratsu: 2 t/day estimated with KomatsushimaIncheon: 1 t/day estimated with KomatsushimaDafeng: 1 t/day estimated with KomatsushimaBayuquan: 1 t/day estimated with KomatsushimaKanokawa: 1 t/day estimated with KomatsushimaLongkou Gang: 1 t/day estimated with KomatsushimaQingdao Port: 1 t/day estimated with KomatsushimaNaha: 1 t/day estimated with KomatsushimaChofu: 1 t/day estimated with KomatsushimaHai Phong: 1 t/day estimated with KomatsushimaZhoushan: 1 t/day estimated with KomatsushimaOfunato: 1 t/day estimated with KomatsushimaLaem Chabang: 1 t/day estimated with KomatsushimaDarwin: 1 t/day estimated with KomatsushimaOmaezaki: 1 t/day estimated with KomatsushimaSasebo: 1 t/day estimated with KomatsushimaHimekawa: 1 t/day estimated with KomatsushimaNaoetsu: 1 t/day estimated with KomatsushimaLianyungang: 0 t/day estimated with KomatsushimaKamaishi: 0 t/day estimated with KomatsushimaVladivostok: 0 t/day estimated with KomatsushimaAomori: 0 t/day estimated with KomatsushimaDalian: 0 t/day estimated with KomatsushimaTsuruga: 0 t/day estimated with KomatsushimaGwangyang (Kwangyang): 0 t/day estimated with KomatsushimaKomatsushima
click to enable scroll zoom · drag to pan

Full footprint: all 159 connections of Komatsushima aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Siam SeaportThailand11.7 days between calls
  2. 2.NagoyaJapan4.5 days between calls
  3. 3.BusanKorea1.6 days between calls
  4. 4.Wakayama-ShimotsuJapan0.5 days between calls
  5. 5.Da NangVietnam11.0 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.KureJapan1.1 days between calls
  2. 2.NagoyaJapan2.8 days between calls
  3. 3.SakaiJapan13.6 days between calls
  4. 4.HachinoheJapan19.0 days between calls
  5. 5.Siam SeaportThailand11.7 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)