Port profile · Maritime Radar

Port of Da Nang daily activity

Da Nang handled an estimated average of 9.2 kt a day in the week ending 25 September 2026 (+57.8% year on year), with an average of 4 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Vietnam · LOCODE VNDAD · Main cargo sectors: Mineral Products, Wood & Wood Products, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

9.2 kt

28-day average

9.2 kt

Vs 28-day average

-0.4%

Year on year (same week)

+57.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container75102 kt55 kt
Dry bulk843 t68 kt
General cargo278.6 kt18 kt
Ro-Ro00 t0 t
Tanker35.7 kt0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Saigon: 10,533 t/day estimated with Da NangSaigonHai Phong: 9,732 t/day estimated with Da NangHai PhongHong Kong: 5,516 t/day estimated with Da NangHong KongCat Lai (Saigon New Port): 3,718 t/day estimated with Da NangCat Lai (Saigon New Port)Kaohsiung: 3,055 t/day estimated with Da NangKaohsiungSingapore: 2,552 t/day estimated with Da NangSingaporeRizhao: 1,850 t/day estimated with Da NangRizhaoQuy Nhon: 1,738 t/day estimated with Da NangQuy NhonShekou (Shenzhen): 1,601 t/day estimated with Da NangShekou (Shenzhen)Cai Mep: 1,476 t/day estimated with Da NangCai MepShanghai: 806 t/day estimated with Da NangShanghaiGuangzhou (Nansha): 768 t/day estimated with Da NangGuangzhou (Nansha)Port Klang: 587 t/day estimated with Da NangPort KlangDongguan: 518 t/day estimated with Da NangDongguanXiamen: 481 t/day estimated with Da NangXiamenTanjung Pelepas: 455 t/day estimated with Da NangTanjung PelepasKinuura: 431 t/day estimated with Da NangKinuuraYantian: 406 t/day estimated with Da NangYantianNagoya: 357 t/day estimated with Da NangNagoyaQingdao Port: 351 t/day estimated with Da NangQingdao PortKomatsushima: 338 t/day estimated with Da NangKomatsushimaDung Quat: 326 t/day estimated with Da NangDung QuatFushiki-Toyama: 297 t/day estimated with Da NangFushiki-ToyamaChu Lai: 277 t/day estimated with Da NangChu LaiLianyungang: 271 t/day estimated with Da NangLianyungangMawan: 269 t/day estimated with Da NangMawanNingbo: 267 t/day estimated with Da NangNingboKuantan: 244 t/day estimated with Da NangKuantanYangpu: 233 t/day estimated with Da NangYangpuNghe Tinh: 222 t/day estimated with Da NangNghe TinhMishima: 200 t/day estimated with Da NangMishimaSakai: 189 t/day estimated with Da NangSakaiKure: 167 t/day estimated with Da NangKureShougang Jingtang: 144 t/day estimated with Da NangShougang JingtangHachinohe: 130 t/day estimated with Da NangHachinoheHuizhou: 116 t/day estimated with Da NangHuizhouTaipei: 100 t/day estimated with Da NangTaipeiDalian: 95 t/day estimated with Da NangDalianQinzhou: 95 t/day estimated with Da NangQinzhouLaem Chabang: 94 t/day estimated with Da NangLaem ChabangTaichung: 93 t/day estimated with Da NangTaichungHon Gai: 92 t/day estimated with Da NangHon GaiKuching: 83 t/day estimated with Da NangKuchingZhanjiang: 73 t/day estimated with Da NangZhanjiangTomakomai: 62 t/day estimated with Da NangTomakomaiKâmpóng Saôm: 60 t/day estimated with Da NangKâmpóng SaômGuangao: 58 t/day estimated with Da NangGuangaoSiam Seaport: 55 t/day estimated with Da NangSiam SeaportPyeongtaek: 55 t/day estimated with Da NangPyeongtaekManila: 55 t/day estimated with Da NangManilaIncheon: 53 t/day estimated with Da NangIncheonCan Tho: 52 t/day estimated with Da NangCan ThoWeifang Port: 50 t/day estimated with Da NangWeifang PortGuangxi Beibu Gulf Port: 45 t/day estimated with Da NangGuangxi Beibu Gulf PortUlsan: 42 t/day estimated with Da NangUlsanBarbor's Point: 39 t/day estimated with Da NangBarbor's PointVung Tau: 38 t/day estimated with Da NangVung TauSuzhou (Taicang): 36 t/day estimated with Da NangSuzhou (Taicang)Huanghua: 33 t/day estimated with Da NangHuanghuaSuzhou (Changshu): 33 t/day estimated with Da NangSuzhou (Changshu)Hazira: 33 t/day estimated with Da NangBangkok: 30 t/day estimated with Da NangOita: 29 t/day estimated with Da NangZhuhai: 29 t/day estimated with Da NangTangshan (Jingtang): 29 t/day estimated with Da NangKashima-Ibaraki: 28 t/day estimated with Da NangTanjung Priok: 27 t/day estimated with Da NangVan Phong: 26 t/day estimated with Da NangEmpire: 25 t/day estimated with Da NangIwakuni: 25 t/day estimated with Da NangParanaguá: 24 t/day estimated with Da NangPortland: 24 t/day estimated with Da NangShidao Newport: 23 t/day estimated with Da NangShibushi: 23 t/day estimated with Da NangKeelung: 23 t/day estimated with Da NangDavao: 22 t/day estimated with Da NangChiwan: 21 t/day estimated with Da NangLongkou Gang: 21 t/day estimated with Da NangQiwei: 20 t/day estimated with Da NangIshinomaki: 19 t/day estimated with Da NangYangon: 19 t/day estimated with Da NangBluff Harbor: 18 t/day estimated with Da NangRichards Bay: 17 t/day estimated with Da NangBayuquan: 17 t/day estimated with Da NangBusan: 17 t/day estimated with Da NangJohor: 16 t/day estimated with Da NangDongjiakou: 15 t/day estimated with Da NangPengerang: 15 t/day estimated with Da NangGaogang: 14 t/day estimated with Da NangBatangas City: 14 t/day estimated with Da NangFuzhou: 14 t/day estimated with Da NangFangcheng: 14 t/day estimated with Da NangCam Pha: 14 t/day estimated with Da NangWakayama-Shimotsu: 13 t/day estimated with Da NangKrishnapatnam Port: 13 t/day estimated with Da NangPohang: 12 t/day estimated with Da NangLanqiao Port: 12 t/day estimated with Da NangAkita: 12 t/day estimated with Da NangLas Palmas (de Gran Canaria): 12 t/day estimated with Da NangAlbany: 12 t/day estimated with Da NangMailiao: 11 t/day estimated with Da NangBalikpapan: 11 t/day estimated with Da NangFunabashi: 10 t/day estimated with Da NangShui Dong: 10 t/day estimated with Da NangMasan: 10 t/day estimated with Da NangBurnie: 10 t/day estimated with Da NangTokyo: 10 t/day estimated with Da NangMap Ta Phut: 10 t/day estimated with Da NangKawasaki: 9 t/day estimated with Da NangPenang: 8 t/day estimated with Da NangMokpo: 8 t/day estimated with Da NangDumai: 8 t/day estimated with Da NangHakata: 7 t/day estimated with Da NangDachan Bay: 7 t/day estimated with Da NangHimeji: 7 t/day estimated with Da NangMizushima: 6 t/day estimated with Da NangNakhodka: 6 t/day estimated with Da NangSerangoon Harbor: 6 t/day estimated with Da NangMuroran: 6 t/day estimated with Da NangKlaipeda: 6 t/day estimated with Da NangPanjang: 6 t/day estimated with Da NangGresik: 6 t/day estimated with Da NangTanjung Sekong: 5 t/day estimated with Da NangCebu: 5 t/day estimated with Da NangRayong: 5 t/day estimated with Da NangPalembang: 5 t/day estimated with Da NangChennai (Madras): 5 t/day estimated with Da NangShanghai (Yangshan): 5 t/day estimated with Da NangBeihai: 5 t/day estimated with Da NangTianjin Xin Gang: 5 t/day estimated with Da NangChittagong: 4 t/day estimated with Da NangKobe: 4 t/day estimated with Da NangGuangdong Yangjiang Port: 4 t/day estimated with Da NangKushiro: 3 t/day estimated with Da NangCagayan de Oro: 3 t/day estimated with Da NangJiangyin: 3 t/day estimated with Da NangVladivostok: 3 t/day estimated with Da NangIligan: 3 t/day estimated with Da NangLahad Datu: 3 t/day estimated with Da NangSekupang: 3 t/day estimated with Da NangVisakhapatnam: 3 t/day estimated with Da NangSongkhla: 2 t/day estimated with Da NangCalaca: 2 t/day estimated with Da NangPuerto Princesa: 2 t/day estimated with Da NangIloilo: 2 t/day estimated with Da NangTagonoura: 2 t/day estimated with Da NangYantai: 2 t/day estimated with Da NangMaizuru: 2 t/day estimated with Da NangVillanueva: 2 t/day estimated with Da NangKota Kinabalu: 2 t/day estimated with Da NangOsaka: 2 t/day estimated with Da NangMakassar: 2 t/day estimated with Da NangOmaezaki: 2 t/day estimated with Da NangPelabuhan Sungai Udang: 2 t/day estimated with Da NangShimizu: 2 t/day estimated with Da NangKemaman Harbor: 2 t/day estimated with Da NangBanten: 2 t/day estimated with Da NangFukui: 1 t/day estimated with Da NangPontianak: 1 t/day estimated with Da NangChiba: 1 t/day estimated with Da NangLuoyuan: 1 t/day estimated with Da NangSemarang: 1 t/day estimated with Da NangThathong: 1 t/day estimated with Da NangMacau: 1 t/day estimated with Da NangMongla: 1 t/day estimated with Da NangSubic Bay: 1 t/day estimated with Da NangGeneral Santos: 1 t/day estimated with Da NangDaesan: 1 t/day estimated with Da NangZhoushan: 1 t/day estimated with Da NangSampit: 1 t/day estimated with Da NangJinhae: 1 t/day estimated with Da NangBontang LNG Terminal: 1 t/day estimated with Da NangPort Blair: 1 t/day estimated with Da NangKochi: 1 t/day estimated with Da NangHibikinada: 1 t/day estimated with Da NangBitung: 1 t/day estimated with Da NangIsabel: 1 t/day estimated with Da NangMuara: 1 t/day estimated with Da NangQuanzhou: 1 t/day estimated with Da NangUst-Luga: 1 t/day estimated with Da NangAnping: 1 t/day estimated with Da NangChangzhou: 1 t/day estimated with Da NangUbe: 1 t/day estimated with Da NangHitachi: 1 t/day estimated with Da NangLumut: 1 t/day estimated with Da NangSuzhou (Zhangjiagang): 0 t/day estimated with Da NangVictoria: 0 t/day estimated with Da NangDa Nang
click to enable scroll zoom · drag to pan

Full footprint: all 187 connections of Da Nang aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Hai PhongVietnam4.4 days between calls
  2. 2.Cat Lai (Saigon New Port)Vietnam2.2 days between calls
  3. 3.KaohsiungTaiwan Province of China2.7 days between calls
  4. 4.SaigonVietnam4.8 days between calls
  5. 5.SingaporeSingapore4.1 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.SaigonVietnam3.9 days between calls
  2. 2.Hong KongHong Kong SAR2.0 days between calls
  3. 3.Hai PhongVietnam5.6 days between calls
  4. 4.RizhaoChina9.3 days between calls
  5. 5.SingaporeSingapore4.3 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)