Port profile · Maritime Radar

Port of Kinuura daily activity

Kinuura handled an estimated average of 33 kt a day in the week ending 25 September 2026 (-13.1% year on year), with an average of 4 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPKNU · Main cargo sectors: Mineral Products, Vegetable Products, Wood & Wood Products

Data up to · 25 September 2026

7-day average · Estimated total volume

33 kt

28-day average

31 kt

Vs 28-day average

+7.1%

Year on year (same week)

-13.1%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container00 t0 t
Dry bulk38691 kt55 kt
General cargo7857 kt28 kt
Ro-Ro145.4 kt0 t
Tanker1234 kt1.5 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Newcastle: 6,430 t/day estimated with KinuuraNewcastleGladstone: 2,598 t/day estimated with KinuuraGladstoneRichmond, CA: 1,758 t/day estimated with KinuuraRichmond, CAYokkaichi: 1,530 t/day estimated with KinuuraYokkaichiMishima: 1,469 t/day estimated with KinuuraMishimaVancouver: 1,448 t/day estimated with KinuuraVancouverRichards Bay: 1,280 t/day estimated with KinuuraRichards BayNagoya: 1,271 t/day estimated with KinuuraNagoyaTaboguilla: 1,177 t/day estimated with KinuuraTaboguillaKashima-Ibaraki: 1,119 t/day estimated with KinuuraKashima-IbarakiMizushima: 1,054 t/day estimated with KinuuraMizushimaChiba: 1,042 t/day estimated with KinuuraChibaLos Angeles-Long Beach: 971 t/day estimated with KinuuraLos Angeles-Long BeachHay Point: 928 t/day estimated with KinuuraHay PointPanjang: 872 t/day estimated with KinuuraPanjangEmpire: 851 t/day estimated with KinuuraEmpireVostochnyy: 824 t/day estimated with KinuuraVostochnyyCai Mep: 810 t/day estimated with KinuuraCai MepNew Orleans: 799 t/day estimated with KinuuraNew OrleansHitachi: 787 t/day estimated with KinuuraHitachiOnahama: 743 t/day estimated with KinuuraOnahamaPuerto Nuevo: 711 t/day estimated with KinuuraPuerto NuevoKawasaki: 706 t/day estimated with KinuuraKawasakiYokohama: 666 t/day estimated with KinuuraYokohamaBontang LNG Terminal: 664 t/day estimated with KinuuraBontang LNG TerminalHon Gai: 615 t/day estimated with KinuuraHon GaiSakai-Semboku: 509 t/day estimated with KinuuraSakai-SembokuTokuyama: 471 t/day estimated with KinuuraTokuyamaDa Nang: 431 t/day estimated with KinuuraDa NangGeelong: 420 t/day estimated with KinuuraGeelongAbbot Point: 401 t/day estimated with KinuuraAbbot PointStockton: 365 t/day estimated with KinuuraStocktonSouth Louisiana: 362 t/day estimated with KinuuraSouth LouisianaKobe: 359 t/day estimated with KinuuraKobePyeongtaek: 316 t/day estimated with KinuuraPyeongtaekKaohsiung: 307 t/day estimated with KinuuraKaohsiungTaichung: 262 t/day estimated with KinuuraTaichungKagoshima: 257 t/day estimated with KinuuraKagoshimaPrince Rupert: 251 t/day estimated with KinuuraPrince RupertFangcheng: 243 t/day estimated with KinuuraFangchengSurabaya: 235 t/day estimated with KinuuraSurabayaOsaka: 234 t/day estimated with KinuuraOsakaShanghai: 228 t/day estimated with KinuuraShanghaiFukuyama: 225 t/day estimated with KinuuraFukuyamaManila: 220 t/day estimated with KinuuraManilaKanda: 217 t/day estimated with KinuuraKandaHouston (US-TX): 207 t/day estimated with KinuuraHouston (US-TX)Susaki: 200 t/day estimated with KinuuraSusakiVan Phong: 200 t/day estimated with KinuuraVan PhongBusan: 197 t/day estimated with KinuuraBusanMikawa: 191 t/day estimated with KinuuraMikawaShimizu: 188 t/day estimated with KinuuraShimizuKochi: 186 t/day estimated with KinuuraKochiTanjung Sangata: 185 t/day estimated with KinuuraTanjung SangataChittagong: 183 t/day estimated with KinuuraChittagongBunbury: 178 t/day estimated with KinuuraBunburyPort Klang: 169 t/day estimated with KinuuraPort KlangKalama: 169 t/day estimated with KinuuraKalamaKuantan: 166 t/day estimated with KinuuraKuantanUbe: 164 t/day estimated with KinuuraUbePortland: 161 t/day estimated with KinuuraKitakyushu (Wakamatsu): 157 t/day estimated with KinuuraWakayama-Shimotsu: 157 t/day estimated with KinuuraHachinohe: 144 t/day estimated with KinuuraSingapore: 143 t/day estimated with KinuuraGeraldton: 137 t/day estimated with KinuuraSakaide: 136 t/day estimated with KinuuraLianyungang: 132 t/day estimated with KinuuraSantos: 131 t/day estimated with KinuuraZhoushan: 130 t/day estimated with KinuuraIndonesia Morowali Industrial Park: 130 t/day estimated with KinuuraHiroshima: 129 t/day estimated with KinuuraJohor: 129 t/day estimated with KinuuraPuerto Montt: 129 t/day estimated with KinuuraTomakomai: 127 t/day estimated with KinuuraRizhao: 126 t/day estimated with KinuuraTsukumi: 123 t/day estimated with KinuuraTokyo: 119 t/day estimated with KinuuraJayapura: 119 t/day estimated with KinuuraGuangzhou (Nansha): 116 t/day estimated with KinuuraDung Quat: 115 t/day estimated with KinuuraUlsan: 114 t/day estimated with KinuuraKushiro: 113 t/day estimated with KinuuraNiihama: 112 t/day estimated with KinuuraGwangyang (Kwangyang): 105 t/day estimated with KinuuraQuy Nhon: 101 t/day estimated with KinuuraVanino: 101 t/day estimated with KinuuraPohang: 101 t/day estimated with KinuuraTacoma: 100 t/day estimated with KinuuraHakata: 99 t/day estimated with KinuuraHimeji: 99 t/day estimated with KinuuraTianjin Xin Gang: 92 t/day estimated with KinuuraOita: 92 t/day estimated with KinuuraTownsville: 91 t/day estimated with KinuuraFreeport (US-FL): 87 t/day estimated with KinuuraBangkok: 86 t/day estimated with KinuuraXiagong: 86 t/day estimated with KinuuraTagonoura: 85 t/day estimated with KinuuraHigashiharima: 84 t/day estimated with KinuuraNewport News: 83 t/day estimated with KinuuraShibushi: 78 t/day estimated with KinuuraBayuquan: 77 t/day estimated with KinuuraAko: 77 t/day estimated with KinuuraTokachi: 73 t/day estimated with KinuuraIshinomaki: 71 t/day estimated with KinuuraTachibana: 71 t/day estimated with KinuuraKisarazu: 70 t/day estimated with KinuuraParanaguá: 70 t/day estimated with KinuuraHibikinada: 65 t/day estimated with KinuuraDumai: 65 t/day estimated with KinuuraZhuhai: 64 t/day estimated with KinuuraAlbany: 64 t/day estimated with KinuuraPort Elizabeth: 63 t/day estimated with KinuuraIwakuni: 63 t/day estimated with KinuuraBalikpapan: 63 t/day estimated with KinuuraSendai-Shiogama: 62 t/day estimated with KinuuraChaozhou: 62 t/day estimated with KinuuraFunabashi: 61 t/day estimated with KinuuraBanten: 61 t/day estimated with KinuuraDurban: 59 t/day estimated with KinuuraMarugame: 58 t/day estimated with KinuuraDhamra Port: 57 t/day estimated with KinuuraSuzhou (Taicang): 57 t/day estimated with KinuuraYatsushiro: 57 t/day estimated with KinuuraKamaishi: 56 t/day estimated with KinuuraBeaumont: 56 t/day estimated with KinuuraMuhammad Bin Qasim: 56 t/day estimated with KinuuraHososhima: 55 t/day estimated with KinuuraGuaymas: 55 t/day estimated with KinuuraPort Latta: 54 t/day estimated with KinuuraTanjung Priok: 51 t/day estimated with KinuuraCairns: 51 t/day estimated with KinuuraKamarajar Port: 49 t/day estimated with KinuuraFremantle: 48 t/day estimated with KinuuraSiam Seaport: 47 t/day estimated with KinuuraLongview: 46 t/day estimated with KinuuraMatsusaka: 45 t/day estimated with KinuuraXiuyu: 45 t/day estimated with KinuuraXiamen: 44 t/day estimated with KinuuraBrisbane: 41 t/day estimated with KinuuraLazaro Cardenas: 40 t/day estimated with KinuuraPort Angeles: 40 t/day estimated with KinuuraAuckland: 40 t/day estimated with KinuuraVillanueva: 38 t/day estimated with KinuuraPort Dickson: 38 t/day estimated with KinuuraZhanjiang: 38 t/day estimated with KinuuraHaifeng power: 37 t/day estimated with KinuuraFuzhou: 37 t/day estimated with KinuuraNamikata: 37 t/day estimated with KinuuraMailiao: 36 t/day estimated with KinuuraDavao: 35 t/day estimated with KinuuraZhouliwang: 34 t/day estimated with KinuuraHai Phong: 34 t/day estimated with KinuuraHuanghua: 32 t/day estimated with KinuuraBintulu: 31 t/day estimated with KinuuraShidao Newport: 31 t/day estimated with KinuuraIncheon: 31 t/day estimated with KinuuraAomori: 30 t/day estimated with KinuuraPortland, OR: 30 t/day estimated with KinuuraPanama City: 30 t/day estimated with KinuuraBuenaventura: 29 t/day estimated with KinuuraTangshan (Jingtang): 28 t/day estimated with KinuuraRio De Janeiro: 28 t/day estimated with KinuuraMackay: 28 t/day estimated with KinuuraNew York-New Jersey: 28 t/day estimated with KinuuraGuangdong Yangjiang Port: 28 t/day estimated with KinuuraPivdennyi: 28 t/day estimated with KinuuraCape Town: 28 t/day estimated with KinuuraParadip: 28 t/day estimated with KinuuraMawan: 27 t/day estimated with KinuuraLuleå: 27 t/day estimated with KinuuraQushan Island: 27 t/day estimated with KinuuraTanjung Pelepas: 26 t/day estimated with KinuuraQinzhou: 26 t/day estimated with KinuuraBatangas City: 26 t/day estimated with KinuuraVancouver: 26 t/day estimated with KinuuraGuangxi Beibu Gulf Port: 26 t/day estimated with KinuuraOtaru: 26 t/day estimated with KinuuraDalian: 25 t/day estimated with KinuuraWilmington, NC: 25 t/day estimated with KinuuraImabari: 25 t/day estimated with KinuuraNiigata: 24 t/day estimated with KinuuraBell Bay: 24 t/day estimated with KinuuraBaton Rouge: 24 t/day estimated with KinuuraEnsenada: 23 t/day estimated with KinuuraSeattle: 23 t/day estimated with KinuuraSaiki: 23 t/day estimated with KinuuraKeelung: 22 t/day estimated with KinuuraMoji: 22 t/day estimated with KinuuraPhiladelphia: 22 t/day estimated with KinuuraKure: 21 t/day estimated with KinuuraPascagoula: 21 t/day estimated with KinuuraYingkou: 21 t/day estimated with KinuuraSasebo: 21 t/day estimated with KinuuraMarcus Hook: 21 t/day estimated with KinuuraQiwei: 20 t/day estimated with KinuuraPort of Yeosu: 20 t/day estimated with KinuuraBeihai: 19 t/day estimated with KinuuraKaratsu: 19 t/day estimated with KinuuraNakhodka: 18 t/day estimated with KinuuraKinuura
click to enable scroll zoom · drag to pan

Full footprint: all 317 connections of Kinuura aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.NewcastleAustralia28.9 days between calls
  2. 2.GladstoneAustralia29.8 days between calls
  3. 3.Richmond, CAUnited States28.0 days between calls
  4. 4.Richards BaySouth Africa50.3 days between calls
  5. 5.TaboguillaPanama36.7 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.NagoyaJapan1.2 days between calls
  2. 2.MizushimaJapan2.2 days between calls
  3. 3.MishimaJapan24.7 days between calls
  4. 4.YokkaichiJapan2.7 days between calls
  5. 5.ChibaJapan1.6 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)