Port profile · Maritime Radar

Port of Kashima-Ibaraki daily activity

Kashima-Ibaraki handled an estimated average of 82 kt a day in the week ending 25 September 2026 (-30.8% year on year), with an average of 13 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

82 kt

28-day average

94 kt

Vs 28-day average

-13.2%

Year on year (same week)

-30.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container31.9 kt438 t
Dry bulk531.3 Mt125 kt
General cargo13092 kt91 kt
Ro-Ro12.0 kt2.7 kt
Tanker184779 kt290 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Kiire: 17,572 t/day estimated with Kashima-IbarakiKiirePort Walcott: 16,912 t/day estimated with Kashima-IbarakiPort WalcottYokohama: 12,487 t/day estimated with Kashima-IbarakiYokohamaNewcastle: 12,423 t/day estimated with Kashima-IbarakiNewcastleNagoya: 10,405 t/day estimated with Kashima-IbarakiNagoyaKisarazu: 10,298 t/day estimated with Kashima-IbarakiKisarazuOita: 10,031 t/day estimated with Kashima-IbarakiOitaSendai-Shiogama: 8,083 t/day estimated with Kashima-IbarakiSendai-ShiogamaChiba: 7,818 t/day estimated with Kashima-IbarakiChibaMuroran: 7,445 t/day estimated with Kashima-IbarakiMuroranWakayama-Shimotsu: 7,307 t/day estimated with Kashima-IbarakiWakayama-ShimotsuHachinohe: 6,646 t/day estimated with Kashima-IbarakiHachinoheHay Point: 5,285 t/day estimated with Kashima-IbarakiHay PointKitakyushu (Wakamatsu): 4,729 t/day estimated with Kashima-IbarakiKitakyushu (Wakamatsu)Kawasaki: 4,317 t/day estimated with Kashima-IbarakiKawasakiMizushima: 4,085 t/day estimated with Kashima-IbarakiMizushimaItaqui: 3,648 t/day estimated with Kashima-IbarakiItaquiPort Hedland: 3,613 t/day estimated with Kashima-IbarakiPort HedlandTaboguilla: 2,820 t/day estimated with Kashima-IbarakiTaboguillaZhouliwang: 2,773 t/day estimated with Kashima-IbarakiZhouliwangJuaymah: 2,712 t/day estimated with Kashima-IbarakiJuaymahVancouver: 2,709 t/day estimated with Kashima-IbarakiVancouverGladstone: 2,209 t/day estimated with Kashima-IbarakiGladstoneTomakomai: 2,185 t/day estimated with Kashima-IbarakiTomakomaiSakai-Semboku: 2,051 t/day estimated with Kashima-IbarakiSakai-SembokuRas Laffan: 2,043 t/day estimated with Kashima-IbarakiRas LaffanDampier: 1,702 t/day estimated with Kashima-IbarakiDampierKamaishi: 1,676 t/day estimated with Kashima-IbarakiKamaishiKobe: 1,671 t/day estimated with Kashima-IbarakiKobeSingapore: 1,670 t/day estimated with Kashima-IbarakiSingaporeLongview: 1,661 t/day estimated with Kashima-IbarakiLongviewSaldanha Bay: 1,643 t/day estimated with Kashima-IbarakiSaldanha BayUlsan: 1,625 t/day estimated with Kashima-IbarakiUlsanKure: 1,588 t/day estimated with Kashima-IbarakiKureYokkaichi: 1,585 t/day estimated with Kashima-IbarakiYokkaichiHimeji: 1,579 t/day estimated with Kashima-IbarakiHimejiKaohsiung: 1,484 t/day estimated with Kashima-IbarakiKaohsiungKushiro: 1,432 t/day estimated with Kashima-IbarakiKushiroDongjiakou: 1,427 t/day estimated with Kashima-IbarakiDongjiakouJabal Az Zannah-Ruways: 1,397 t/day estimated with Kashima-IbarakiJabal Az Zannah-RuwaysRas Tanura: 1,357 t/day estimated with Kashima-IbarakiRas TanuraBaltimore: 1,321 t/day estimated with Kashima-IbarakiBaltimoreIwakuni: 1,320 t/day estimated with Kashima-IbarakiIwakuniPrince Rupert: 1,259 t/day estimated with Kashima-IbarakiPrince RupertOnahama: 1,243 t/day estimated with Kashima-IbarakiOnahamaSusaki: 1,225 t/day estimated with Kashima-IbarakiSusakiTubarao: 1,207 t/day estimated with Kashima-IbarakiTubaraoGwangyang (Kwangyang): 1,201 t/day estimated with Kashima-IbarakiGwangyang (Kwangyang)Ishinomaki: 1,197 t/day estimated with Kashima-IbarakiIshinomakiKalama: 1,178 t/day estimated with Kashima-IbarakiKalamaOtaru: 1,166 t/day estimated with Kashima-IbarakiOtaruMina Al Ahmadi: 1,159 t/day estimated with Kashima-IbarakiMina Al AhmadiHouston (US-TX): 1,136 t/day estimated with Kashima-IbarakiHouston (US-TX)Kinuura: 1,119 t/day estimated with Kashima-IbarakiKinuuraNew Orleans: 1,118 t/day estimated with Kashima-IbarakiNew OrleansMobile: 1,083 t/day estimated with Kashima-IbarakiMobileLos Angeles-Long Beach: 1,058 t/day estimated with Kashima-IbarakiLos Angeles-Long BeachDalian: 1,031 t/day estimated with Kashima-IbarakiDalianQuebec: 1,022 t/day estimated with Kashima-IbarakiQuebecSantos: 995 t/day estimated with Kashima-IbarakiSantosSouth Louisiana: 973 t/day estimated with Kashima-IbarakiShimizu: 914 t/day estimated with Kashima-IbarakiSept Iles: 913 t/day estimated with Kashima-IbarakiTokyo: 858 t/day estimated with Kashima-IbarakiShibushi: 853 t/day estimated with Kashima-IbarakiCai Mep: 813 t/day estimated with Kashima-IbarakiCape Flattery: 805 t/day estimated with Kashima-IbarakiNiigata: 794 t/day estimated with Kashima-IbarakiPivdennyi: 759 t/day estimated with Kashima-IbarakiKagoshima: 736 t/day estimated with Kashima-IbarakiHibikinada: 649 t/day estimated with Kashima-IbarakiUbe: 635 t/day estimated with Kashima-IbarakiShanghai: 622 t/day estimated with Kashima-IbarakiVancouver: 620 t/day estimated with Kashima-IbarakiFunabashi: 612 t/day estimated with Kashima-IbarakiCanaveral Harbor: 611 t/day estimated with Kashima-IbarakiTokachi: 599 t/day estimated with Kashima-IbarakiPyeongtaek: 579 t/day estimated with Kashima-IbarakiParanaguá: 564 t/day estimated with Kashima-IbarakiPort Cartier: 564 t/day estimated with Kashima-IbarakiHakodate: 542 t/day estimated with Kashima-IbarakiMumbai-Jawaharlal Nehru (Nhava Sheva): 534 t/day estimated with Kashima-IbarakiHitachi: 500 t/day estimated with Kashima-IbarakiMap Ta Phut: 499 t/day estimated with Kashima-IbarakiBusan: 475 t/day estimated with Kashima-IbarakiTokuyama: 475 t/day estimated with Kashima-IbarakiAkita: 469 t/day estimated with Kashima-IbarakiTianjin Xin Gang: 468 t/day estimated with Kashima-IbarakiVostochnyy: 468 t/day estimated with Kashima-IbarakiSeattle: 450 t/day estimated with Kashima-IbarakiLanqiao Port: 441 t/day estimated with Kashima-IbarakiAcajutla: 416 t/day estimated with Kashima-IbarakiDaesan: 415 t/day estimated with Kashima-IbarakiMikawa: 415 t/day estimated with Kashima-IbarakiHigashiharima: 404 t/day estimated with Kashima-IbarakiPuerto Quetzal: 390 t/day estimated with Kashima-IbarakiDas Island: 386 t/day estimated with Kashima-IbarakiAomori: 383 t/day estimated with Kashima-IbarakiBayuquan: 380 t/day estimated with Kashima-IbarakiNewport News: 376 t/day estimated with Kashima-IbarakiChittagong: 368 t/day estimated with Kashima-IbarakiBunbury: 349 t/day estimated with Kashima-IbarakiEmpire: 349 t/day estimated with Kashima-IbarakiMuhammad Bin Qasim: 334 t/day estimated with Kashima-IbarakiAbu Dhabi: 331 t/day estimated with Kashima-IbarakiSakaide: 317 t/day estimated with Kashima-IbarakiKanda: 317 t/day estimated with Kashima-IbarakiBanten: 314 t/day estimated with Kashima-IbarakiFreeport (US-FL): 313 t/day estimated with Kashima-IbarakiMelbourne: 305 t/day estimated with Kashima-IbarakiFremantle: 303 t/day estimated with Kashima-IbarakiIncheon: 287 t/day estimated with Kashima-IbarakiDarwin: 287 t/day estimated with Kashima-IbarakiHakata: 286 t/day estimated with Kashima-IbarakiYakacik: 283 t/day estimated with Kashima-IbarakiHong Kong: 273 t/day estimated with Kashima-IbarakiQingdao Port: 272 t/day estimated with Kashima-IbarakiXiuyu: 269 t/day estimated with Kashima-IbarakiFukuyama: 267 t/day estimated with Kashima-IbarakiNakhodka: 262 t/day estimated with Kashima-IbarakiTacoma: 261 t/day estimated with Kashima-IbarakiPhiladelphia: 261 t/day estimated with Kashima-IbarakiMundra: 251 t/day estimated with Kashima-IbarakiTaichung: 248 t/day estimated with Kashima-IbarakiManila: 233 t/day estimated with Kashima-IbarakiDurban: 232 t/day estimated with Kashima-IbarakiCartagena: 226 t/day estimated with Kashima-IbarakiBangkok: 223 t/day estimated with Kashima-IbarakiPohang: 221 t/day estimated with Kashima-IbarakiLianyungang: 221 t/day estimated with Kashima-IbarakiTaipei: 212 t/day estimated with Kashima-IbarakiPort Klang: 207 t/day estimated with Kashima-IbarakiRavenna: 205 t/day estimated with Kashima-IbarakiBrisbane: 203 t/day estimated with Kashima-IbarakiHarmac: 201 t/day estimated with Kashima-IbarakiOsaka: 199 t/day estimated with Kashima-IbarakiBeaumont: 198 t/day estimated with Kashima-IbarakiFangcheng: 197 t/day estimated with Kashima-IbarakiMatsuyama: 196 t/day estimated with Kashima-IbarakiZhoushan: 195 t/day estimated with Kashima-IbarakiJohor: 190 t/day estimated with Kashima-IbarakiDoha-Umm Said: 181 t/day estimated with Kashima-IbarakiNingbo: 180 t/day estimated with Kashima-IbarakiJiangyin: 178 t/day estimated with Kashima-IbarakiPort Elizabeth: 175 t/day estimated with Kashima-IbarakiMatsusaka: 175 t/day estimated with Kashima-IbarakiKandla: 168 t/day estimated with Kashima-IbarakiJiaxing: 165 t/day estimated with Kashima-IbarakiSiam Seaport: 165 t/day estimated with Kashima-IbarakiLongkou Gang: 163 t/day estimated with Kashima-IbarakiQuy Nhon: 163 t/day estimated with Kashima-IbarakiBatangas City: 157 t/day estimated with Kashima-IbarakiPortland, OR: 157 t/day estimated with Kashima-IbarakiMilazzo: 155 t/day estimated with Kashima-IbarakiTangshan (Jingtang): 155 t/day estimated with Kashima-IbarakiSuzhou (Taicang): 155 t/day estimated with Kashima-IbarakiPort Adelaide: 154 t/day estimated with Kashima-IbarakiShuaiba: 152 t/day estimated with Kashima-IbarakiStockton: 143 t/day estimated with Kashima-IbarakiSaigon: 142 t/day estimated with Kashima-IbarakiJinzhou: 140 t/day estimated with Kashima-IbarakiPort Botany: 139 t/day estimated with Kashima-IbarakiNantong: 139 t/day estimated with Kashima-IbarakiKochi: 138 t/day estimated with Kashima-IbarakiOfunato: 134 t/day estimated with Kashima-IbarakiBuenaventura: 134 t/day estimated with Kashima-IbarakiTownsville: 134 t/day estimated with Kashima-IbarakiNiihama: 134 t/day estimated with Kashima-IbarakiFushiki-Toyama: 133 t/day estimated with Kashima-IbarakiVila Do Conde: 131 t/day estimated with Kashima-IbarakiShougang Jingtang: 128 t/day estimated with Kashima-IbarakiAlgeciras: 124 t/day estimated with Kashima-IbarakiAbbot Point: 123 t/day estimated with Kashima-IbarakiPengerang: 121 t/day estimated with Kashima-IbarakiRotterdam: 120 t/day estimated with Kashima-IbarakiTagonoura: 118 t/day estimated with Kashima-IbarakiGuangzhou (Nansha): 118 t/day estimated with Kashima-IbarakiRumoi: 116 t/day estimated with Kashima-IbarakiRichmond, CA: 113 t/day estimated with Kashima-IbarakiAlbany: 113 t/day estimated with Kashima-IbarakiIshikariwan-Shinko: 111 t/day estimated with Kashima-IbarakiHai Phong: 110 t/day estimated with Kashima-IbarakiMarcus Hook: 109 t/day estimated with Kashima-IbarakiBahia Blanca: 107 t/day estimated with Kashima-IbarakiSakata: 105 t/day estimated with Kashima-IbarakiGeelong: 105 t/day estimated with Kashima-IbarakiNew Westminster: 102 t/day estimated with Kashima-IbarakiSao Francisco: 102 t/day estimated with Kashima-IbarakiPort Kembla: 101 t/day estimated with Kashima-IbarakiTauranga: 100 t/day estimated with Kashima-IbarakiZhuhai: 99 t/day estimated with Kashima-IbarakiWhyalla: 98 t/day estimated with Kashima-IbarakiRizhao: 96 t/day estimated with Kashima-IbarakiZhapu: 95 t/day estimated with Kashima-IbarakiChennai (Madras): 94 t/day estimated with Kashima-IbarakiIstanbul: 92 t/day estimated with Kashima-IbarakiTanjung Pelepas: 90 t/day estimated with Kashima-IbarakiJebel Ali: 89 t/day estimated with Kashima-IbarakiLumut: 88 t/day estimated with Kashima-IbarakiMarugame: 88 t/day estimated with Kashima-IbarakiKashima-Ibaraki
click to enable scroll zoom · drag to pan

Full footprint: all 468 connections of Kashima-Ibaraki aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Port WalcottAustralia17.4 days between calls
  2. 2.KiireJapan4.8 days between calls
  3. 3.NewcastleAustralia19.6 days between calls
  4. 4.OitaJapan5.0 days between calls
  5. 5.KisarazuJapan2.5 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.NagoyaJapan1.8 days between calls
  2. 2.YokohamaJapan2.5 days between calls
  3. 3.Sendai-ShiogamaJapan1.3 days between calls
  4. 4.MuroranJapan2.1 days between calls
  5. 5.Wakayama-ShimotsuJapan2.1 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)