Port profile · Maritime Radar

Port of Yokosuka daily activity

Yokosuka handled an estimated average of 594 t a day in the week ending 25 September 2026 (-50.2% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPYOS · Main cargo sectors: Mineral Products, Vehicles & Equipment, Machinery & Electrical Equipment

Data up to · 25 September 2026

7-day average · Estimated total volume

594 t

28-day average

1.4 kt

Vs 28-day average

-58.9%

Year on year (same week)

-50.2%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container00 t0 t
Dry bulk1334 t0 t
General cargo7612 t2.5 kt
Ro-Ro170 t0 t
Tanker1222 kt15 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Kanda: 1,588 t/day estimated with YokosukaKandaUlsan: 573 t/day estimated with YokosukaUlsanApra Harbor: 453 t/day estimated with YokosukaApra HarborMizushima: 450 t/day estimated with YokosukaMizushimaSasebo: 389 t/day estimated with YokosukaSaseboYokohama: 368 t/day estimated with YokosukaYokohamaKawasaki: 232 t/day estimated with YokosukaKawasakiHachinohe: 221 t/day estimated with YokosukaHachinoheNagoya: 193 t/day estimated with YokosukaNagoyaMikawa: 128 t/day estimated with YokosukaMikawaChiba: 117 t/day estimated with YokosukaChibaIwakuni: 88 t/day estimated with YokosukaIwakuniSubic Bay: 86 t/day estimated with YokosukaSubic BayYokkaichi: 69 t/day estimated with YokosukaYokkaichiKashima-Ibaraki: 61 t/day estimated with YokosukaKashima-IbarakiTangier-Mediterranean: 48 t/day estimated with YokosukaTangier-MediterraneanLimboh: 47 t/day estimated with YokosukaLimbohGwangyang (Kwangyang): 47 t/day estimated with YokosukaGwangyang (Kwangyang)Kikuma: 44 t/day estimated with YokosukaKikumaMohammedia: 40 t/day estimated with YokosukaMohammediaHiroshima: 39 t/day estimated with YokosukaHiroshimaFujairah: 38 t/day estimated with YokosukaFujairahEbeye: 36 t/day estimated with YokosukaEbeyeKobe: 35 t/day estimated with YokosukaKobeBusan: 33 t/day estimated with YokosukaBusanHonolulu: 31 t/day estimated with YokosukaHonoluluTokyo: 31 t/day estimated with YokosukaTokyoNgqura: 31 t/day estimated with YokosukaNgquraTaboguilla: 29 t/day estimated with YokosukaTaboguillaNew Westminster: 25 t/day estimated with YokosukaNew WestminsterKisarazu: 25 t/day estimated with YokosukaKisarazuFunabashi: 20 t/day estimated with YokosukaFunabashiWakayama-Shimotsu: 20 t/day estimated with YokosukaWakayama-ShimotsuSingapore: 20 t/day estimated with YokosukaSingaporeSendai-Shiogama: 20 t/day estimated with YokosukaSendai-ShiogamaShimizu: 18 t/day estimated with YokosukaShimizuSakai-Semboku: 17 t/day estimated with YokosukaSakai-SembokuHitachi: 16 t/day estimated with YokosukaHitachiTomakomai: 15 t/day estimated with YokosukaTomakomaiManchester: 14 t/day estimated with YokosukaManchesterDaesan: 14 t/day estimated with YokosukaDaesanOnahama: 14 t/day estimated with YokosukaOnahamaMuroran: 9 t/day estimated with YokosukaMuroranFukuyama: 8 t/day estimated with YokosukaFukuyamaPort Hueneme: 8 t/day estimated with YokosukaPort HuenemeMarugame: 7 t/day estimated with YokosukaMarugameSavannah: 7 t/day estimated with YokosukaSavannahTagonoura: 6 t/day estimated with YokosukaTagonouraOsaka: 6 t/day estimated with YokosukaOsakaTsukumi: 6 t/day estimated with YokosukaTsukumiKitakyushu (Wakamatsu): 6 t/day estimated with YokosukaKitakyushu (Wakamatsu)Sakaide: 6 t/day estimated with YokosukaSakaideLaem Chabang: 6 t/day estimated with YokosukaLaem ChabangIshinomaki: 5 t/day estimated with YokosukaIshinomakiHakodate: 5 t/day estimated with YokosukaHakodateOmaezaki: 5 t/day estimated with YokosukaOmaezakiOita: 4 t/day estimated with YokosukaOitaMoji: 4 t/day estimated with YokosukaMojiSusaki: 4 t/day estimated with YokosukaSusakiTokuyama: 4 t/day estimated with YokosukaTokuyamaMatsusaka: 4 t/day estimated with YokosukaHimeji: 4 t/day estimated with YokosukaEverett (US-WA): 3 t/day estimated with YokosukaKomatsushima: 3 t/day estimated with YokosukaAmagasaki: 3 t/day estimated with YokosukaMatsuyama: 3 t/day estimated with YokosukaBeirut: 3 t/day estimated with YokosukaHakata: 3 t/day estimated with YokosukaNiigata: 3 t/day estimated with YokosukaKure: 2 t/day estimated with YokosukaNagasaki: 2 t/day estimated with YokosukaOwase: 2 t/day estimated with YokosukaKeelung: 2 t/day estimated with YokosukaKushiro: 2 t/day estimated with YokosukaKinuura: 2 t/day estimated with YokosukaUbe: 2 t/day estimated with YokosukaOfunato: 2 t/day estimated with YokosukaLianyungang: 2 t/day estimated with YokosukaKamaishi: 2 t/day estimated with YokosukaHofu: 2 t/day estimated with YokosukaAkita: 2 t/day estimated with YokosukaBatangas City: 2 t/day estimated with YokosukaCoquimbo: 2 t/day estimated with YokosukaTacoma: 2 t/day estimated with YokosukaIshikariwan-Shinko: 1 t/day estimated with YokosukaNiihama: 1 t/day estimated with YokosukaTokachi: 1 t/day estimated with YokosukaTaipei: 1 t/day estimated with YokosukaManzanillo: 1 t/day estimated with YokosukaPiraeus: 1 t/day estimated with YokosukaAomori: 1 t/day estimated with YokosukaVancouver: 1 t/day estimated with YokosukaNamikata: 1 t/day estimated with YokosukaOnoda: 1 t/day estimated with YokosukaHibikinada: 1 t/day estimated with YokosukaKanokawa: 1 t/day estimated with YokosukaNoshiro: 1 t/day estimated with YokosukaMutsure: 1 t/day estimated with YokosukaMaizuru: 1 t/day estimated with YokosukaOnomichi-Itozaki: 1 t/day estimated with YokosukaHososhima: 0 t/day estimated with YokosukaHannan: 0 t/day estimated with YokosukaSakai: 0 t/day estimated with YokosukaOtaru: 0 t/day estimated with YokosukaYatsushiro: 0 t/day estimated with YokosukaKochi: 0 t/day estimated with YokosukaMishima: 0 t/day estimated with YokosukaAko: 0 t/day estimated with YokosukaSaganoseki: 0 t/day estimated with YokosukaTakuma: 0 t/day estimated with YokosukaKudamatsu: 0 t/day estimated with YokosukaTakamatsu: 0 t/day estimated with YokosukaYokosuka
click to enable scroll zoom · drag to pan

Full footprint: all 112 connections of Yokosuka aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.KandaJapan1.5 days between calls
  2. 2.UlsanKorea5.5 days between calls
  3. 3.MizushimaJapan1.4 days between calls
  4. 4.YokohamaJapan2.1 days between calls
  5. 5.Apra HarborGuam12.8 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.KandaJapan1.7 days between calls
  2. 2.Apra HarborGuam17.6 days between calls
  3. 3.SaseboJapan6.9 days between calls
  4. 4.KawasakiJapan0.6 days between calls
  5. 5.YokohamaJapan1.0 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)