Port profile · Maritime Radar

Port of Kawasaki daily activity

Kawasaki handled an estimated average of 31 kt a day in the week ending 25 September 2026 (+4.4% year on year), with an average of 15 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPKWS · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Plastics, Rubber, Leather

Data up to · 25 September 2026

7-day average · Estimated total volume

31 kt

28-day average

44 kt

Vs 28-day average

-29.4%

Year on year (same week)

+4.4%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container1921 kt1.1 kt
Dry bulk44287 kt78 kt
General cargo11141 kt59 kt
Ro-Ro29441 t23 kt
Tanker307399 kt322 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Chiba: 18,714 t/day estimated with KawasakiChibaYokohama: 14,016 t/day estimated with KawasakiYokohamaPort Hedland: 7,401 t/day estimated with KawasakiPort HedlandMizushima: 7,151 t/day estimated with KawasakiMizushimaFukuyama: 7,115 t/day estimated with KawasakiFukuyamaTokyo: 5,747 t/day estimated with KawasakiTokyoNagoya: 5,163 t/day estimated with KawasakiNagoyaGladstone: 5,037 t/day estimated with KawasakiGladstoneKashima-Ibaraki: 4,317 t/day estimated with KawasakiKashima-IbarakiYokkaichi: 3,046 t/day estimated with KawasakiYokkaichiItaqui: 2,468 t/day estimated with KawasakiItaquiSendai-Shiogama: 2,230 t/day estimated with KawasakiSendai-ShiogamaShimizu: 2,041 t/day estimated with KawasakiShimizuVillanueva: 1,897 t/day estimated with KawasakiVillanuevaUlsan: 1,605 t/day estimated with KawasakiUlsanTomakomai: 1,561 t/day estimated with KawasakiTomakomaiShanghai: 1,546 t/day estimated with KawasakiShanghaiKobe: 1,538 t/day estimated with KawasakiKobeSakai-Semboku: 1,461 t/day estimated with KawasakiSakai-SembokuPort Walcott: 1,199 t/day estimated with KawasakiPort WalcottFunabashi: 1,170 t/day estimated with KawasakiFunabashiNewcastle: 1,129 t/day estimated with KawasakiNewcastleLos Angeles-Long Beach: 1,124 t/day estimated with KawasakiLos Angeles-Long BeachWakayama-Shimotsu: 1,121 t/day estimated with KawasakiWakayama-ShimotsuTokuyama: 1,079 t/day estimated with KawasakiTokuyamaHakodate: 1,025 t/day estimated with KawasakiHakodateSaldanha Bay: 954 t/day estimated with KawasakiSaldanha BayTachibana: 935 t/day estimated with KawasakiTachibanaDongjiakou: 929 t/day estimated with KawasakiDongjiakouPorto de Itaguai: 903 t/day estimated with KawasakiPorto de ItaguaiTaichung: 898 t/day estimated with KawasakiTaichungSingapore: 858 t/day estimated with KawasakiSingaporeOita: 854 t/day estimated with KawasakiOitaHay Point: 812 t/day estimated with KawasakiHay PointKaohsiung: 803 t/day estimated with KawasakiKaohsiungOnahama: 798 t/day estimated with KawasakiOnahamaDampier: 759 t/day estimated with KawasakiDampierVancouver: 719 t/day estimated with KawasakiVancouverKinuura: 706 t/day estimated with KawasakiKinuuraKisarazu: 670 t/day estimated with KawasakiKisarazuTubarao: 669 t/day estimated with KawasakiTubaraoKochi: 652 t/day estimated with KawasakiKochiNiigata: 625 t/day estimated with KawasakiNiigataAbbot Point: 552 t/day estimated with KawasakiAbbot PointMuroran: 549 t/day estimated with KawasakiMuroranGwangyang (Kwangyang): 543 t/day estimated with KawasakiGwangyang (Kwangyang)Prince Rupert: 540 t/day estimated with KawasakiPrince RupertIncheon: 532 t/day estimated with KawasakiIncheonTsukumi: 511 t/day estimated with KawasakiTsukumiSept Iles: 487 t/day estimated with KawasakiSept IlesIwakuni: 484 t/day estimated with KawasakiIwakuniTagonoura: 481 t/day estimated with KawasakiTagonouraOsaka: 473 t/day estimated with KawasakiOsakaCai Mep: 470 t/day estimated with KawasakiCai MepSusaki: 453 t/day estimated with KawasakiSusakiNingbo: 451 t/day estimated with KawasakiNingboHong Kong: 435 t/day estimated with KawasakiHong KongHitachi: 430 t/day estimated with KawasakiHitachiHachinohe: 419 t/day estimated with KawasakiHachinoheBusan: 416 t/day estimated with KawasakiBusanTianjin Xin Gang: 411 t/day estimated with KawasakiHibikinada: 410 t/day estimated with KawasakiMikawa: 404 t/day estimated with KawasakiJiaxing: 387 t/day estimated with KawasakiMishima: 381 t/day estimated with KawasakiNakhodka: 379 t/day estimated with KawasakiAomori: 363 t/day estimated with KawasakiUbe: 357 t/day estimated with KawasakiHigashiharima: 354 t/day estimated with KawasakiKushiro: 354 t/day estimated with KawasakiPortland, OR: 348 t/day estimated with KawasakiLirquen: 331 t/day estimated with KawasakiHouston (US-TX): 309 t/day estimated with KawasakiOfunato: 288 t/day estimated with KawasakiQingdao Port: 275 t/day estimated with KawasakiTaboguilla: 259 t/day estimated with KawasakiTaipei: 258 t/day estimated with KawasakiSakaide: 252 t/day estimated with KawasakiDalian: 251 t/day estimated with KawasakiBrisbane: 249 t/day estimated with KawasakiHimeji: 246 t/day estimated with KawasakiFushiki-Toyama: 240 t/day estimated with KawasakiManila: 239 t/day estimated with KawasakiPyeongtaek: 236 t/day estimated with KawasakiYokosuka: 232 t/day estimated with KawasakiXiamen: 226 t/day estimated with KawasakiKingston: 221 t/day estimated with KawasakiBeaumont: 218 t/day estimated with KawasakiVostochnyy: 209 t/day estimated with KawasakiKanda: 204 t/day estimated with KawasakiKalama: 202 t/day estimated with KawasakiOtaru: 202 t/day estimated with KawasakiShekou (Shenzhen): 192 t/day estimated with KawasakiTeluk Bayur: 191 t/day estimated with KawasakiSuzhou (Taicang): 188 t/day estimated with KawasakiNacala: 187 t/day estimated with KawasakiZhouliwang: 184 t/day estimated with KawasakiJiangyin: 180 t/day estimated with KawasakiLianyungang: 172 t/day estimated with KawasakiAkita: 164 t/day estimated with KawasakiRichards Bay: 161 t/day estimated with KawasakiMundra: 157 t/day estimated with KawasakiKinwan: 155 t/day estimated with KawasakiTanjung Sangata: 152 t/day estimated with KawasakiBayuquan: 147 t/day estimated with KawasakiFreeport (US-FL): 147 t/day estimated with KawasakiVanino: 145 t/day estimated with KawasakiDaesan: 133 t/day estimated with KawasakiZhapu: 131 t/day estimated with KawasakiKeelung: 131 t/day estimated with KawasakiVancouver: 130 t/day estimated with KawasakiNiihama: 128 t/day estimated with KawasakiIshinomaki: 124 t/day estimated with KawasakiRizhao: 120 t/day estimated with KawasakiGuangzhou (Nansha): 117 t/day estimated with KawasakiBaltimore: 117 t/day estimated with KawasakiMoji: 114 t/day estimated with KawasakiBatangas City: 110 t/day estimated with KawasakiKaratsu: 109 t/day estimated with KawasakiHakata: 107 t/day estimated with KawasakiSeattle: 106 t/day estimated with KawasakiNaoetsu: 105 t/day estimated with KawasakiKitakyushu (Wakamatsu): 104 t/day estimated with KawasakiPohang: 104 t/day estimated with KawasakiLazaro Cardenas: 102 t/day estimated with KawasakiMap Ta Phut: 100 t/day estimated with KawasakiRichmond, CA: 99 t/day estimated with KawasakiSuzhou (Zhangjiagang): 98 t/day estimated with KawasakiChittagong: 97 t/day estimated with KawasakiHiroshima: 91 t/day estimated with KawasakiLyttelton: 89 t/day estimated with KawasakiZhoushan: 86 t/day estimated with KawasakiIshikariwan-Shinko: 86 t/day estimated with KawasakiDakar: 86 t/day estimated with KawasakiPuerto Nuevo: 84 t/day estimated with KawasakiNew Orleans: 82 t/day estimated with KawasakiMawan: 82 t/day estimated with KawasakiPisco (General San Martin): 81 t/day estimated with KawasakiAmagasaki: 80 t/day estimated with KawasakiMatsuyama: 80 t/day estimated with KawasakiZhuhai: 80 t/day estimated with KawasakiLuoyuan: 79 t/day estimated with KawasakiMaizuru: 78 t/day estimated with KawasakiKomatsushima: 78 t/day estimated with KawasakiMuhammad Bin Qasim: 77 t/day estimated with KawasakiWenzhou: 76 t/day estimated with KawasakiLas Palmas (de Gran Canaria): 75 t/day estimated with KawasakiTanjung Priok: 72 t/day estimated with KawasakiPanjang: 70 t/day estimated with KawasakiGeraldton: 69 t/day estimated with KawasakiTanjung Pelepas: 68 t/day estimated with KawasakiNew York-New Jersey: 66 t/day estimated with KawasakiDarwin: 65 t/day estimated with KawasakiShibushi: 64 t/day estimated with KawasakiMatsusaka: 64 t/day estimated with KawasakiIligan: 63 t/day estimated with KawasakiCharleston: 63 t/day estimated with KawasakiFangcheng: 62 t/day estimated with KawasakiHai Phong: 62 t/day estimated with KawasakiVisakhapatnam: 62 t/day estimated with KawasakiMarugame: 61 t/day estimated with KawasakiJebel Ali: 60 t/day estimated with KawasakiGijon: 60 t/day estimated with KawasakiHon Gai: 58 t/day estimated with KawasakiFuzhou: 58 t/day estimated with KawasakiTokachi: 57 t/day estimated with KawasakiLongkou Gang: 56 t/day estimated with KawasakiSalaverry: 56 t/day estimated with KawasakiLanqiao Port: 56 t/day estimated with KawasakiNantong: 56 t/day estimated with KawasakiSaigon: 56 t/day estimated with KawasakiKamaishi: 54 t/day estimated with KawasakiJohor: 54 t/day estimated with KawasakiTauranga: 52 t/day estimated with KawasakiPengerang: 52 t/day estimated with KawasakiSiam Seaport: 52 t/day estimated with KawasakiTsuruga: 51 t/day estimated with KawasakiBuenaventura: 51 t/day estimated with KawasakiKuantan: 51 t/day estimated with KawasakiNew Westminster: 51 t/day estimated with KawasakiSurabaya: 49 t/day estimated with KawasakiRas Laffan: 48 t/day estimated with KawasakiQiwei: 48 t/day estimated with KawasakiGuayacan: 46 t/day estimated with KawasakiSan Nicolas: 46 t/day estimated with KawasakiCape Town: 46 t/day estimated with KawasakiShanghai (Yangshan): 46 t/day estimated with KawasakiDumai: 45 t/day estimated with KawasakiDurban: 44 t/day estimated with KawasakiPort Botany: 43 t/day estimated with KawasakiFremantle: 43 t/day estimated with KawasakiPort Hueneme: 42 t/day estimated with KawasakiAmsterdam: 42 t/day estimated with KawasakiTownsville: 42 t/day estimated with KawasakiBalboa: 41 t/day estimated with KawasakiMumbai-Jawaharlal Nehru (Nhava Sheva): 41 t/day estimated with KawasakiKimanis: 41 t/day estimated with KawasakiYangpu: 41 t/day estimated with KawasakiJuaymah: 40 t/day estimated with KawasakiNoshiro: 40 t/day estimated with KawasakiKawasaki
click to enable scroll zoom · drag to pan

Full footprint: all 399 connections of Kawasaki aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.ChibaJapan1.3 days between calls
  2. 2.YokohamaJapan1.0 days between calls
  3. 3.Port HedlandAustralia15.6 days between calls
  4. 4.GladstoneAustralia18.1 days between calls
  5. 5.TokyoJapan0.6 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.ChibaJapan1.3 days between calls
  2. 2.FukuyamaJapan4.0 days between calls
  3. 3.MizushimaJapan3.0 days between calls
  4. 4.YokohamaJapan1.4 days between calls
  5. 5.NagoyaJapan1.4 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)