Port profile · Maritime Radar

Port of Tsuruga daily activity

Tsuruga handled an estimated average of 8.1 kt a day in the week ending 25 September 2026 (+336.3% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPTRG · Main cargo sectors: Mineral Products, Wood & Wood Products, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

8.1 kt

28-day average

6.6 kt

Vs 28-day average

+22.2%

Year on year (same week)

+336.3%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container44.7 kt278 t
Dry bulk5170 kt3.2 kt
General cargo23.1 kt323 t
Ro-Ro1160 t543 t
Tanker43.1 kt165 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Newcastle: 4,029 t/day estimated with TsurugaNewcastleVostochnyy: 623 t/day estimated with TsurugaVostochnyyTomakomai: 502 t/day estimated with TsurugaTomakomaiHimekawa: 483 t/day estimated with TsurugaHimekawaTokuyama: 464 t/day estimated with TsurugaTokuyamaBusan: 430 t/day estimated with TsurugaBusanNanao: 399 t/day estimated with TsurugaNanaoBunbury: 390 t/day estimated with TsurugaBunburySakai: 383 t/day estimated with TsurugaSakaiCai Mep: 314 t/day estimated with TsurugaCai MepFushiki-Toyama: 313 t/day estimated with TsurugaFushiki-ToyamaTsukumi: 306 t/day estimated with TsurugaTsukumiGladstone: 240 t/day estimated with TsurugaGladstoneTanjung Sangata: 234 t/day estimated with TsurugaTanjung SangataKanazawa: 208 t/day estimated with TsurugaKanazawaMaizuru: 192 t/day estimated with TsurugaMaizuruVanino: 179 t/day estimated with TsurugaVaninoEmpire: 149 t/day estimated with TsurugaEmpireKaohsiung: 142 t/day estimated with TsurugaKaohsiungVancouver: 137 t/day estimated with TsurugaVancouverFukui: 133 t/day estimated with TsurugaFukuiTachibana: 122 t/day estimated with TsurugaTachibanaAko: 95 t/day estimated with TsurugaAkoDonghae: 84 t/day estimated with TsurugaDonghaeZhouliwang: 81 t/day estimated with TsurugaZhouliwangKanda: 79 t/day estimated with TsurugaKandaNiigata: 64 t/day estimated with TsurugaNiigataManila: 59 t/day estimated with TsurugaManilaDongjiakou: 59 t/day estimated with TsurugaDongjiakouSakaide: 57 t/day estimated with TsurugaSakaideHimeji: 56 t/day estimated with TsurugaHimejiHamada: 55 t/day estimated with TsurugaHamadaHong Kong: 54 t/day estimated with TsurugaHong KongKawasaki: 51 t/day estimated with TsurugaKawasakiQingdao Port: 50 t/day estimated with TsurugaQingdao PortHakodate: 47 t/day estimated with TsurugaHakodateXiuyu: 47 t/day estimated with TsurugaXiuyuMizushima: 44 t/day estimated with TsurugaMizushimaGwangyang (Kwangyang): 42 t/day estimated with TsurugaGwangyang (Kwangyang)Kitakyushu (Wakamatsu): 41 t/day estimated with TsurugaKitakyushu (Wakamatsu)Hitachi: 41 t/day estimated with TsurugaHitachiFukuyama: 41 t/day estimated with TsurugaFukuyamaSingapore: 39 t/day estimated with TsurugaSingaporeBontang LNG Terminal: 36 t/day estimated with TsurugaBontang LNG TerminalShanghai: 35 t/day estimated with TsurugaShanghaiIwakuni: 35 t/day estimated with TsurugaIwakuniBandar-E Pars Terminal: 35 t/day estimated with TsurugaBandar-E Pars TerminalSusaki: 34 t/day estimated with TsurugaSusakiQuy Nhon: 33 t/day estimated with TsurugaQuy NhonLongkou Gang: 33 t/day estimated with TsurugaLongkou GangSiam Seaport: 33 t/day estimated with TsurugaSiam SeaportIstanbul: 33 t/day estimated with TsurugaIstanbulXiamen: 33 t/day estimated with TsurugaXiamenPort Elizabeth: 31 t/day estimated with TsurugaPort ElizabethFangcheng: 31 t/day estimated with TsurugaFangchengXiagong: 31 t/day estimated with TsurugaXiagongZhuhai: 30 t/day estimated with TsurugaZhuhaiPanjang: 30 t/day estimated with TsurugaPanjangChiwan: 30 t/day estimated with TsurugaChiwanAbbot Point: 30 t/day estimated with TsurugaAbbot PointUlsan: 30 t/day estimated with TsurugaZhanjiang: 29 t/day estimated with TsurugaNantong: 28 t/day estimated with TsurugaBalikpapan: 28 t/day estimated with TsurugaTeluk Bayur: 27 t/day estimated with TsurugaKobe: 26 t/day estimated with TsurugaBuenaventura: 26 t/day estimated with TsurugaOnahama: 25 t/day estimated with TsurugaYantai: 24 t/day estimated with TsurugaNakhodka: 24 t/day estimated with TsurugaMishima: 24 t/day estimated with TsurugaYatsushiro: 22 t/day estimated with TsurugaHibikinada: 22 t/day estimated with TsurugaBrisbane: 22 t/day estimated with TsurugaRichards Bay: 22 t/day estimated with TsurugaAkita: 21 t/day estimated with TsurugaKashima-Ibaraki: 21 t/day estimated with TsurugaMap Ta Phut: 20 t/day estimated with TsurugaVisakhapatnam: 20 t/day estimated with TsurugaRizhao: 20 t/day estimated with TsurugaSaigon: 19 t/day estimated with TsurugaNagoya: 19 t/day estimated with TsurugaAlbany: 19 t/day estimated with TsurugaHon Gai: 18 t/day estimated with TsurugaBell Bay: 18 t/day estimated with TsurugaNghe Tinh: 18 t/day estimated with TsurugaVillanueva: 17 t/day estimated with TsurugaBangkok: 17 t/day estimated with TsurugaHachinohe: 17 t/day estimated with TsurugaSavannah: 16 t/day estimated with TsurugaDumai: 16 t/day estimated with TsurugaSakai-Semboku: 15 t/day estimated with TsurugaMoji: 14 t/day estimated with TsurugaWeifang Port: 14 t/day estimated with TsurugaPyeongtaek: 14 t/day estimated with TsurugaUbe: 13 t/day estimated with TsurugaTaipei: 12 t/day estimated with TsurugaTanjung Priok: 12 t/day estimated with TsurugaKinuura: 12 t/day estimated with TsurugaKochi: 11 t/day estimated with TsurugaPort Klang: 11 t/day estimated with TsurugaMuara: 11 t/day estimated with TsurugaPort of Sabah: 10 t/day estimated with TsurugaOita: 10 t/day estimated with TsurugaIndonesia Morowali Industrial Park: 10 t/day estimated with TsurugaSakata: 9 t/day estimated with TsurugaKagoshima: 9 t/day estimated with TsurugaMuroran: 8 t/day estimated with TsurugaTangshan (Jingtang): 8 t/day estimated with TsurugaJohor: 8 t/day estimated with TsurugaUno: 8 t/day estimated with TsurugaSaganoseki: 7 t/day estimated with TsurugaSuao: 7 t/day estimated with TsurugaPascagoula: 7 t/day estimated with TsurugaYokohama: 7 t/day estimated with TsurugaHakata: 7 t/day estimated with TsurugaIncheon: 7 t/day estimated with TsurugaMatsuyama: 6 t/day estimated with TsurugaStockton: 6 t/day estimated with TsurugaNaha: 6 t/day estimated with TsurugaSaiki: 6 t/day estimated with TsurugaMasan: 6 t/day estimated with TsurugaChiba: 6 t/day estimated with TsurugaRayong: 5 t/day estimated with TsurugaNagasaki: 4 t/day estimated with TsurugaNaoetsu: 4 t/day estimated with TsurugaBanten: 4 t/day estimated with TsurugaOsaka: 4 t/day estimated with TsurugaSurabaya: 4 t/day estimated with TsurugaSasebo: 4 t/day estimated with TsurugaHigashiharima: 4 t/day estimated with TsurugaCalaca: 4 t/day estimated with TsurugaAomori: 4 t/day estimated with TsurugaBelawan: 4 t/day estimated with TsurugaBintulu: 4 t/day estimated with TsurugaIshikariwan-Shinko: 3 t/day estimated with TsurugaHiroshima: 3 t/day estimated with TsurugaSanshandaocun: 3 t/day estimated with TsurugaKaratsu: 3 t/day estimated with TsurugaTaichung: 3 t/day estimated with TsurugaBayuquan: 2 t/day estimated with TsurugaPohang: 2 t/day estimated with TsurugaSuzhou (Taicang): 2 t/day estimated with TsurugaOfunato: 2 t/day estimated with TsurugaSuzhou (Zhangjiagang): 2 t/day estimated with TsurugaMatsusaka: 2 t/day estimated with TsurugaZhoushan: 2 t/day estimated with TsurugaJiangyin: 2 t/day estimated with TsurugaWakayama-Shimotsu: 2 t/day estimated with TsurugaKikuma: 2 t/day estimated with TsurugaYokkaichi: 1 t/day estimated with TsurugaMarugame: 1 t/day estimated with TsurugaHannan: 1 t/day estimated with TsurugaGunsan: 1 t/day estimated with TsurugaNiihama: 1 t/day estimated with TsurugaMikawa: 1 t/day estimated with TsurugaMasao: 1 t/day estimated with TsurugaSekupang: 1 t/day estimated with TsurugaFunabashi: 1 t/day estimated with TsurugaTokyo: 1 t/day estimated with TsurugaKanokawa: 1 t/day estimated with TsurugaImabari: 1 t/day estimated with TsurugaOmaezaki: 1 t/day estimated with TsurugaOnomichi-Itozaki: 1 t/day estimated with TsurugaKudamatsu: 1 t/day estimated with TsurugaShimizu: 1 t/day estimated with TsurugaHososhima: 0 t/day estimated with TsurugaOnoda: 0 t/day estimated with TsurugaVladivostok: 0 t/day estimated with TsurugaKomatsushima: 0 t/day estimated with TsurugaShibushi: 0 t/day estimated with TsurugaKisarazu: 0 t/day estimated with TsurugaTsuruga
click to enable scroll zoom · drag to pan

Full footprint: all 172 connections of Tsuruga aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.NewcastleAustralia29.5 days between calls
  2. 2.VostochnyyRussian Federation8.5 days between calls
  3. 3.TokuyamaJapan2.3 days between calls
  4. 4.HimekawaJapan2.0 days between calls
  5. 5.BusanKorea2.1 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.SakaiJapan1.2 days between calls
  2. 2.NewcastleAustralia24.3 days between calls
  3. 3.TomakomaiJapan1.2 days between calls
  4. 4.NanaoJapan12.2 days between calls
  5. 5.Fushiki-ToyamaJapan1.6 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)