Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects · “Algeciras”

11 projects · funding €48.1m

  • Design and deployment of On-shore powersupply in Algeciras Port

    €6.4m

    OngoingAP BAHIA DE ALGECIRAS · Maritime · Atlantic and Mediterranean · call CEF-T-2022-COREGEN · Mar 2023 → Jan 2027 · investment €20.3m

  • Study of gauges for the development of Rail Motorway Algeciras - Zaragoza

    €2.4m

    OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.9m

  • Desarrollo del Corredor de Carga Ferroviaria Atlántico "Sines-Lisboa / Leixoes - Madrid- Medina del Campo / Bilbao / San Sebastián-Irún-Burdeos-París / Le Havre / Metz - Estrasburgo / Mannheim / Sines-Elvas / Algeciras"

    €765,000

    OngoingGEIE Corridor Ferroviaire de Marchandises 4 (GEIE CFM4) · Rail · Atlantic Corridor · call 2014 · Nov 2015 → Mar 2021 · investment €1.5m

  • First ammonia bunkering infrastructure in Algeciras as part of the Andalusian Green Hydrogen Valley

    €13.6m

    In preparationCEPSA · Maritime · Outside the corridors · call CEF-T-2024-AFIFGEN-1er corte · investment €45.4m

  • LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay

    €11.3m

    CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m

  • Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO

    €5.2m

    CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m

  • ATL_Freight_South_access_to_Bilbao_Port

    €3.5m

    CompletedDirección de Infraestructuras del Transporte. Gobierno Vasco · Rail · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €7m

  • Impulso de la energía combustibles sostenibles para el transporte de mercancías en las autopistas europeas (Bestway)

    €2.5m

    CompletedGas Natural Servicios SDG, SA · Road · Atlantic Corridor · call 2014 · Sept 2014 → Aug 2020 · investment €4.9m

  • Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.

    €1.2m

    CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m

  • Improvement of the railway connection with the port facilities located in Algeciras Bay

    €806,945

    CompletedAutoridad Portuaria de la Bahía de Algeciras · Multimodal · Outside the corridors · call 2020 · Aug 2021 → Dec 2024 · investment €1.6m

  • Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal

    €492,500

    CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)