Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

47 projects · funding €1.1bn

  • ATLANTIC CORRIDOR: SECTION BERGARA-SAN SEBASTIAN-BAYONNE. BERGARA JUNCTION TRACK BED WORKS AND SERVICES FOR FOLLOW-UP WORKS. PHASE 2

    €145.4m

    OngoingADIF Alta Velocidad · Rail · Atlantic Corridor · call CEF-T-2021-COREGEN · Jan 2021 → Dec 2025 · investment €290.8m

  • Mediterranean corridor. Bilbao-Pamplona-Zaragoza-Sagunto line. Section Zaragoza-Teruel-Sagunto. Electrification works

    €77.8m

    OngoingADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS · Rail · Mediterranean Corridor · call CEF-T-2023 · Oct 2024 → Dec 2028 · investment €259.2m

  • Sagunto Multimodal Logistic Platform

    €27.6m

    OngoingGeneralitat Valenciana · Rail · Mediterranean Corridor · call CEF-T-2023 · Feb 2024 → Sept 2026 · investment €92.1m

  • ATLANTIC CORRIDOR. TRACK BED WORKS AND SERVICES FOR FOLLOW-UP WORKS. SECTION ATXONDO - ABADIÑO. PHASE 2

    €22m

    OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-COREGEN · Feb 2023 → Jan 2027 · investment €73.4m

  • PCZ 2022: Bridging the cross border missing link between FR & SP: Pau-Canfranc-Zaragoza

    €3m

    OngoingRegión Nouvelle-Aquitaine · Rail · Outside the corridors · call CEF-T-2022-SIMOBGEN · Feb 2023 → Apr 2026 · investment €6.1m

  • Study of gauges for the development of Rail Motorway Algeciras - Zaragoza

    €2.4m

    OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.9m

  • Works for gauge adaptation in railway line Medina del Campo – Salamanca- Fuentes de Oñoro and services to follow-up works

    €2.2m

    OngoingADIF · Rail · Atlantic Corridor · call CEF-T-2022-MILMOB · Oct 2022 → Dec 2025 · investment €4.5m

  • Digital Capacity Management Implementation 2024-2026

    €2.1m

    OngoingRAILNETEUROPE-VEREINIGUNG ZUR FORDERUNG DES INTERNATIONALEN VERKEHRS AUF DER EISENBAHNINFRASTRUKTUR · Rail · Outside the corridors · call CEF-T-2023 · Apr 2024 → Dec 2027 · investment €4.1m

  • Desarrollo del Corredor de Carga Ferroviaria Atlántico "Sines-Lisboa / Leixoes - Madrid- Medina del Campo / Bilbao / San Sebastián-Irún-Burdeos-París / Le Havre / Metz - Estrasburgo / Mannheim / Sines-Elvas / Algeciras"

    €765,000

    OngoingGEIE Corridor Ferroviaire de Marchandises 4 (GEIE CFM4) · Rail · Atlantic Corridor · call 2014 · Nov 2015 → Mar 2021 · investment €1.5m

  • Corredor atlántico: tramo Bergara-San Sebastián- Bayona. Estudios y obras y servicios de seguimiento de obras. Fase 1.

    €448.1m

    CompletedMinisterio de Fomento · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €1.1bn

  • Implementación del ancho UIC (fase 1) en el tramo Valencia-Tarragona-Barcelona del corredor Mediterráneo.

    €124.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €311.2m

  • Implantacion del ancho UIC en el tramo Castellbisbal-Vilaseca. Corredor Mediterráneo.

    €57m

    CompletedADIF · Rail · Mediterranean Corridor · call 2017 · Jul 2017 → Dec 2024 · investment €285m

  • Mediterranean Corridor. Section Valencia-Sagunto-Castellón. Implementation of UIC gauge. Phase 2."

    €41.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2019 · Feb 2020 → Dec 2024 · investment €103.8m

  • Actualización y retroadaptación del ERTMS embarcado en los vehículos de renfe

    €28m

    CompletedRENFE F y M · Rail · Outside the corridors · call 2015 · Feb 2016 → Dec 2024 · investment €56m

  • Conexión ferroviaria Aveiro-Salamanca-Medina del Campo: obras en instalaciones y servicios de energía para trabajos de seguimiento.

    €19.6m

    CompletedADIF · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €49m

  • Línea ferroviaria de alta velocidad Bilbao-Vitoria - Obras de plataforma en las subsecciones Elorroio-Atxondo y Atxondo-Abadino y trabajos de seguimiento.

    €18.1m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · Dec 2015 → Dec 2020 · investment €90.4m

  • Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.

    €11.4m

    CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m

  • Retroadaptación del ERTMS embarcado en los vehículos de renfe

    €11.3m

    CompletedRENFE-FABRICACIÓN Y MANTENIMIENTO SOCIEDAD MERCANTIL ESTATAL,S.A. · Rail · Outside the corridors · call 2016 · Feb 2017 → Dec 2024 · investment €22.5m

  • Despliegue de ERTMS en el tramo Valladolid-Burgos

    €7.8m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · May 2014 → Dec 2022 · investment €15.6m

  • Electrification and Signalling works in Crossborder Section Guillarei Tui

    €6.5m

    CompletedADIF · Rail · Outside the corridors · call 2019 · Sept 2019 → Dec 2023 · investment €16.3m

  • Atlantic Corridor. High Speed line Sines/Lisboa-Madrid. Madrid urban node. Study of the Railway Complex of Atocha Station (Phase 3)

    €6m

    CompletedADIF · Rail · Atlantic Corridor · call 2019 · Feb 2020 → Dec 2023 · investment €12m

  • Despliegue de ERTMS en las líneas de cercanías de Barcelona

    €5.2m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Nov 2015 → Dec 2022 · investment €10.4m

  • Actualización de todas las líneas de alta velocidad españolas a la versión 2.3.0.d. De ERTMS (ETCS+GSMR) 2ª fase

    €4.2m

    CompletedADIF · Rail · Outside the corridors · call 2014 · Apr 2014 → Jun 2022 · investment €8.4m

  • ATL_Freight_South_access_to_Bilbao_Port

    €3.5m

    CompletedDirección de Infraestructuras del Transporte. Gobierno Vasco · Rail · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €7m

  • Interoperability of the rail system with TAF TSI in TEN-T Corridors (I RAIL)

    €2.7m

    CompletedFundación Valenciaport · Rail · Atlantic and Mediterranean · call 2018 · Jan 2019 → Dec 2023 · investment €6.9m

  • Bridging Missing Links between FR&SP:Crossborder Railway Section Pau-Zaragoza. Somport Railway Tunnel Reopening

    €2.5m

    CompletedMinisterio de Fomento · Rail · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €8.1m

  • Estudio de demostración de la infraestructura asociada a una solución innovadora de tracción de gnl en la explotación ferroviaria

    €2.3m

    CompletedRENFE OPERADORA · Rail · Outside the corridors · call 2016 · Dec 2017 → Mar 2023 · investment €4.7m

  • Enlace de enlaces faltantes entre FR&ES: estudios para la rehabilitación del tramo ferroviario transfronterizo Pau-Zaragoza

    €2m

    CompletedRégion Nouvelle-Aquitaine · Rail · Outside the corridors · call 2016 · Jul 2017 → Dec 2023 · investment €4m

  • Remodelación del complejo ferroviario de Chamartín en Madrid para adaptar los servicios de Alta Velocidad.

    €1.6m

    CompletedMinisterio de Fomento - Secretaria de Estado de Infraestructuras Transporte y Vivienda · Rail · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2020 · investment €3.2m

  • Accesibilidad universal en estaciones de pasajeros

    €1.6m

    CompletedADIF · Rail · Outside the corridors · call 2014 · Sept 2014 → Sept 2018 · investment €5.1m

  • Frigorail - Transporte ferroviario refrigerado entre España, Francia y Bélgica, utilizando corredores TEN-T

    €1.3m

    CompletedCOMSA RAIL TRANSPORT, SA · Rail · Mediterranean Corridor · call 2014 · Sept 2015 → Aug 2019 · investment €6.5m

  • Despliegue avanzado de soluciones innovadoras para mejorar la gestión y operación del tráfico ferroviario en la red núcleo.

    €1.2m

    CompletedAutoridad Portuaria de Sevilla · Rail · Mediterranean Corridor · call 2016 · Sept 2017 → Dec 2021 · investment €2.4m

  • Variable Gauge for Freight Transport (Eje de Ancho Variable para Mercancías - EAVM)

    €1.1m

    CompletedADIF · Rail · Mediterranean Corridor · call 2018 · Nov 2018 → Jun 2021 · investment €2.3m

  • 750-Meter Railway Sidings in Section Zaragoza- Barcelona of the Mediterranean Corridor. ZB750

    €955,370

    CompletedAutoridad Portuaria de Barcelona – Port de Barcelona · Rail · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €1.9m

  • Nueva línea ferroviaria de alta capacidad: travesía central del Transpirineo. Estudios (Fase 2)

    €750,000

    CompletedAEIE TGC PIRINEOS · Rail · Outside the corridors · call 2014 · Mar 2016 → Jun 2020 · investment €1.5m

  • Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"

    €750,000

    CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m

  • Vinculación Zaragoza: conectividad urbana con la red central.

    €589,838

    CompletedConsorcio de Transporte del Área de Zaragoza · Rail · Mediterranean Corridor · call 2016 · Feb 2017 → Aug 2019 · investment €1.2m

  • Apoyo a la implantación del ERTMS

    €577,872

    CompletedEEIG ERTMS Users Group · Rail · Outside the corridors · call 2014 · Jan 2015 → Dec 2017 · investment €1.2m

  • Corredor Atlántico / Mediterráneo. Nodo urbano de madrid. Estudios de adaptación mejorada e intermodal de la estación de Chamartín y acceso HSL al aeropuerto de Madrid.

    €500,000

    CompletedMinisterio de Fomento · Rail · Atlantic and Mediterranean · call 2015 · May 2016 → Jun 2019 · investment €1m

  • Upgrading an old rail yard with a siding for trains with a length of 740 m in Ponferrada (Spain)

    €415,000

    CompletedAyuntamiento de Ponferrada, León, España. · Rail · Outside the corridors · call 2020 · Mar 2021 → Jul 2024 · investment €830,000

  • Mejora y fortalecimiento del Corredor de Carga Ferroviaria 6 - Corredor Mediterráneo, incluida la extensión a Croacia.

    €400,000

    CompletedGEIE per il Corridoio Merci 6 EEIG for Rail Freight Corridor 6 · Rail · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2018 · investment €800,000

  • Implementing Telematics Applications for European Interoperability

    €278,340

    CompletedRailNetEurope (Austria) · Rail · Outside the corridors · call 2018 · Jan 2019 → Dec 2023 · investment €560,000

  • Línea ferroviaria de alta velocidad Bilbao-Vitoria (excluido acceso a la ciudad )

    €21.1m

    TerminatedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · May 2016 → Dec 2019 · investment €105.7m

  • Despliegue de ERTMS (ETCS+GSMR) en el corredor atlántico. Tramo vitoria - bilbao - san sebastián

    €11.7m

    TerminatedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2015 · Aug 2017 → Dec 2020 · investment €23.3m

  • Plataforma Logística Intermodal Constanti

    €1.4m

    TerminatedREPSOL QUíMICA S.A. · Rail · Mediterranean Corridor · call 2014 · Jun 2015 → Dec 2018 · investment €7m

  • Corredor Atlántico / MED. Tren de alta velocidad Sines / Lisboa - Madrid. Nodo urbano de madrid. Estudio del Complejo Ferroviario de la Estación de Atocha (Fase 2).

    €1.1m

    TerminatedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2015 · Dec 2016 → Dec 2019 · investment €2.2m

  • MEDITERRANEAN CORRIDOR. SECTION CASTELLÓN-VANDELLÓS. IMPLEMENTATION OF UIC GAUGE. TRACK ASSEMBLAGE AND ELECTRIFICATION WORKS

    —

    TerminatedNo beneficiary · Rail · Outside the corridors · call CEF-T-2022-COREGEN

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)