7-day average · Estimated total volume
0 t
28-day average
0 t
Vs 28-day average
—
Year on year (same week)
—
Estimated total volume — daily series
AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.
By vessel type
| Type | Port calls | Est. imports | Est. exports |
|---|---|---|---|
| Container | 0 | 0 t | 0 t |
| Dry bulk | 0 | 0 t | 0 t |
| General cargo | 0 | 0 t | 0 t |
| Ro-Ro | 6 | 0 t | 0 t |
| Tanker | 0 | 0 t | 0 t |
Main connections
Full footprint: all 23 connections of Kharg Island aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).
Where vessels arrive from
Ports of origin (upstream)
- 1.Bandar Shahid RajaeeIran14.7 days between calls
- 2.Bandar-E Pars TerminalIran7.2 days between calls
- 3.Bandar KhomeiniIran3.3 days between calls
- 4.Bandar AbbasIran17.2 days between calls
- 5.LavanIran2.3 days between calls
Where they sail on to
Destination ports (downstream)
- 1.Bandar Shahid RajaeeIran14.2 days between calls
- 2.Bandar-E Pars TerminalIran7.8 days between calls
- 3.Bandar AbbasIran20.7 days between calls
- 4.JuaymahSaudi Arabia3.0 days between calls
- 5.NingboChina28.4 days between calls
IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.
Indicators · EED Data