Puerto Nuevo: 5,198 t/day estimated with Hadera Puerto Nuevo Murmansk: 2,264 t/day estimated with Hadera Murmansk Ashkelon: 1,862 t/day estimated with Hadera Ashkelon Richards Bay: 1,302 t/day estimated with Hadera Richards Bay Puerto Bolivar: 1,039 t/day estimated with Hadera Puerto Bolivar Ust-Luga: 756 t/day estimated with Hadera Ust-Luga Taman: 579 t/day estimated with Hadera Taman Pivdennyi: 437 t/day estimated with Hadera Pivdennyi Baltimore: 263 t/day estimated with Hadera Baltimore Yakacik: 176 t/day estimated with Hadera Yakacik Algeciras: 163 t/day estimated with Hadera Algeciras Nouadhibou: 152 t/day estimated with Hadera Nouadhibou Ashdod: 144 t/day estimated with Hadera Ashdod Las Palmas (de Gran Canaria): 125 t/day estimated with Hadera Las Palmas (de Gran Canaria) Port Cartier: 99 t/day estimated with Hadera Port Cartier Sept Iles: 82 t/day estimated with Hadera Sept Iles Fangcheng: 80 t/day estimated with Hadera Fangcheng Zhanjiang: 80 t/day estimated with Hadera Zhanjiang Vanino: 73 t/day estimated with Hadera Vanino Mundra: 73 t/day estimated with Hadera Mundra Karabiga: 66 t/day estimated with Hadera Karabiga Haldia: 65 t/day estimated with Hadera Haldia Newcastle: 62 t/day estimated with Hadera Newcastle Gijon: 55 t/day estimated with Hadera Gijon Itaqui: 43 t/day estimated with Hadera Itaqui Antwerp: 40 t/day estimated with Hadera Antwerp Zonguldak: 36 t/day estimated with Hadera Zonguldak Porto Di Lido-Venezia: 36 t/day estimated with Hadera Porto Di Lido-Venezia Foynes: 34 t/day estimated with Hadera Foynes Constantza: 34 t/day estimated with Hadera Constantza Vostochnyy: 33 t/day estimated with Hadera Vostochnyy Alexandria: 29 t/day estimated with Hadera Alexandria Quebec: 26 t/day estimated with Hadera Quebec Rotterdam: 22 t/day estimated with Hadera Rotterdam Novorossiysk: 20 t/day estimated with Hadera Novorossiysk New Haven: 17 t/day estimated with Hadera New Haven Haifa: 8 t/day estimated with Hadera Haifa Salerno: 2 t/day estimated with Hadera Salerno Hadera + − ⌂
click to enable scroll zoom · drag to pan Full footprint: all 38 connections of Hadera aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).
Where vessels arrive from
Ports of origin (upstream)
1. Puerto Nuevo Colombia 29.8 days between calls
2. Murmansk Russian Federation 22.3 days between calls
3. Richards Bay South Africa 33.6 days between calls
4. Puerto Bolivar Colombia 30.5 days between calls
IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.