Port profile · Maritime Radar

Port of Nakhodka daily activity

Nakhodka handled an estimated average of 21 kt a day in the week ending 25 September 2026 (-55.0% year on year), with an average of 4 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Russian Federation · LOCODE RUNJK · Main cargo sectors: Mineral Products, Vegetable Products, Chemical & Allied Industries

Data up to · 25 September 2026

7-day average · Estimated total volume

21 kt

28-day average

32 kt

Vs 28-day average

-33.3%

Year on year (same week)

-55.0%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container37.2 kt3.6 kt
Dry bulk2564 kt471 kt
General cargo4141 kt48 kt
Ro-Ro00 t0 t
Tanker369.6 kt253 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Shougang Jingtang: 5,224 t/day estimated with NakhodkaShougang JingtangVladivostok: 3,343 t/day estimated with NakhodkaVladivostokVostochnyy: 3,158 t/day estimated with NakhodkaVostochnyyPohang: 2,367 t/day estimated with NakhodkaPohangKaohsiung: 2,208 t/day estimated with NakhodkaKaohsiungGwangyang (Kwangyang): 2,006 t/day estimated with NakhodkaGwangyang (Kwangyang)Singapore: 1,774 t/day estimated with NakhodkaSingaporeLanqiao Port: 1,726 t/day estimated with NakhodkaLanqiao PortShanghai: 1,716 t/day estimated with NakhodkaShanghaiSuzhou (Taicang): 1,616 t/day estimated with NakhodkaSuzhou (Taicang)Bayuquan: 1,343 t/day estimated with NakhodkaBayuquanBusan: 1,264 t/day estimated with NakhodkaBusanBanten: 1,221 t/day estimated with NakhodkaBantenKorsakov: 1,144 t/day estimated with NakhodkaKorsakovRizhao: 1,060 t/day estimated with NakhodkaRizhaoTangshan (Jingtang): 1,027 t/day estimated with NakhodkaTangshan (Jingtang)Fangcheng: 860 t/day estimated with NakhodkaFangchengPyeongtaek: 823 t/day estimated with NakhodkaPyeongtaekUlsan: 801 t/day estimated with NakhodkaUlsanFukuyama: 800 t/day estimated with NakhodkaFukuyamaManila: 727 t/day estimated with NakhodkaManilaTaichung: 696 t/day estimated with NakhodkaTaichungQingdao Port: 678 t/day estimated with NakhodkaQingdao PortDandong: 677 t/day estimated with NakhodkaDandongVanino: 660 t/day estimated with NakhodkaVaninoIndonesia Morowali Industrial Park: 600 t/day estimated with NakhodkaIndonesia Morowali Industrial ParkTianjin Xin Gang: 578 t/day estimated with NakhodkaTianjin Xin GangHimekawa: 519 t/day estimated with NakhodkaHimekawaHuanghua: 506 t/day estimated with NakhodkaHuanghuaZhuhai: 502 t/day estimated with NakhodkaZhuhaiQiwei: 500 t/day estimated with NakhodkaQiweiSlavyanka: 449 t/day estimated with NakhodkaSlavyankaNantong: 440 t/day estimated with NakhodkaNantongFuzhou: 435 t/day estimated with NakhodkaFuzhouDongjiakou: 427 t/day estimated with NakhodkaDongjiakouFujairah: 425 t/day estimated with NakhodkaFujairahKawasaki: 379 t/day estimated with NakhodkaKawasakiNingbo: 365 t/day estimated with NakhodkaNingboDalian: 360 t/day estimated with NakhodkaDalianGuangdong Yangjiang Port: 355 t/day estimated with NakhodkaGuangdong Yangjiang PortParadip: 339 t/day estimated with NakhodkaParadipPetropavlovsk-Kamchatskiy: 320 t/day estimated with NakhodkaPetropavlovsk-KamchatskiyLianyungang: 304 t/day estimated with NakhodkaLianyungangDung Quat: 301 t/day estimated with NakhodkaDung QuatTanjung Pelepas: 298 t/day estimated with NakhodkaTanjung PelepasZhoushan: 294 t/day estimated with NakhodkaZhoushanIncheon: 284 t/day estimated with NakhodkaIncheonGladstone: 275 t/day estimated with NakhodkaGladstoneXiamen: 274 t/day estimated with NakhodkaXiamenDonghae: 270 t/day estimated with NakhodkaDonghaeMizushima: 262 t/day estimated with NakhodkaMizushimaKashima-Ibaraki: 262 t/day estimated with NakhodkaKashima-IbarakiShanghai (Yangshan): 251 t/day estimated with NakhodkaShanghai (Yangshan)Kochi: 241 t/day estimated with NakhodkaKochiNagoya: 235 t/day estimated with NakhodkaNagoyaHibikinada: 226 t/day estimated with NakhodkaHibikinadaJiangyin: 220 t/day estimated with NakhodkaJiangyinZhapu: 218 t/day estimated with NakhodkaZhapuZhanjiang: 214 t/day estimated with NakhodkaZhanjiangCherry Point: 212 t/day estimated with NakhodkaCherry PointBunbury: 203 t/day estimated with NakhodkaDaesan: 193 t/day estimated with NakhodkaKrishnapatnam Port: 192 t/day estimated with NakhodkaQinzhou: 191 t/day estimated with NakhodkaXiagong: 186 t/day estimated with NakhodkaBalboa: 181 t/day estimated with NakhodkaShantou: 171 t/day estimated with NakhodkaGaogang: 167 t/day estimated with NakhodkaGuangzhou (Nansha): 166 t/day estimated with NakhodkaNanjing: 164 t/day estimated with NakhodkaKitakyushu (Wakamatsu): 163 t/day estimated with NakhodkaYantai: 160 t/day estimated with NakhodkaVancouver: 154 t/day estimated with NakhodkaPengerang: 152 t/day estimated with NakhodkaDongguan: 151 t/day estimated with NakhodkaGunsan: 151 t/day estimated with NakhodkaMormugao: 143 t/day estimated with NakhodkaLongkou Gang: 141 t/day estimated with NakhodkaJohor: 139 t/day estimated with NakhodkaVisakhapatnam: 131 t/day estimated with NakhodkaHigashiharima: 125 t/day estimated with NakhodkaWakayama-Shimotsu: 124 t/day estimated with NakhodkaJaigad Port: 116 t/day estimated with NakhodkaSurabaya: 112 t/day estimated with NakhodkaMuroran: 110 t/day estimated with NakhodkaTomakomai: 108 t/day estimated with NakhodkaSusaki: 108 t/day estimated with NakhodkaHaldia: 107 t/day estimated with NakhodkaOita: 105 t/day estimated with NakhodkaLuoyuan: 105 t/day estimated with NakhodkaNew Mangalore: 103 t/day estimated with NakhodkaXiuyu: 102 t/day estimated with NakhodkaMap Ta Phut: 100 t/day estimated with NakhodkaKuantan: 97 t/day estimated with NakhodkaYingkou: 96 t/day estimated with NakhodkaSuzhou (Zhangjiagang): 95 t/day estimated with NakhodkaKarimun: 95 t/day estimated with NakhodkaJinzhou: 93 t/day estimated with NakhodkaYangpu: 91 t/day estimated with NakhodkaKamarajar Port: 89 t/day estimated with NakhodkaSuao: 87 t/day estimated with NakhodkaChangzhou: 84 t/day estimated with NakhodkaMombasa: 80 t/day estimated with NakhodkaHong Kong: 77 t/day estimated with NakhodkaChiba: 76 t/day estimated with NakhodkaZhouliwang: 76 t/day estimated with NakhodkaQinhuangdao: 74 t/day estimated with NakhodkaFushiki-Toyama: 72 t/day estimated with NakhodkaCagayan de Oro: 69 t/day estimated with NakhodkaGuangxi Beibu Gulf Port: 68 t/day estimated with NakhodkaFremantle: 67 t/day estimated with NakhodkaSakaide: 67 t/day estimated with NakhodkaRumoi: 66 t/day estimated with NakhodkaChofu: 64 t/day estimated with NakhodkaWenzhou: 62 t/day estimated with NakhodkaKisarazu: 60 t/day estimated with NakhodkaWeihai: 60 t/day estimated with NakhodkaDafeng: 57 t/day estimated with NakhodkaHimeji: 54 t/day estimated with NakhodkaTanjung Priok: 54 t/day estimated with NakhodkaGourd Shanzui: 54 t/day estimated with NakhodkaShidao Newport: 54 t/day estimated with NakhodkaCai Mep: 53 t/day estimated with NakhodkaChaozhou: 50 t/day estimated with NakhodkaHachinohe: 49 t/day estimated with NakhodkaMumbai-Jawaharlal Nehru (Nhava Sheva): 49 t/day estimated with NakhodkaLimboh: 47 t/day estimated with NakhodkaPort Angeles: 47 t/day estimated with NakhodkaSaganoseki: 46 t/day estimated with NakhodkaSuzhou (Changshu): 46 t/day estimated with NakhodkaYokohama: 45 t/day estimated with NakhodkaDhamra Port: 45 t/day estimated with NakhodkaTaipei: 45 t/day estimated with NakhodkaPuerto Quetzal: 45 t/day estimated with NakhodkaHazira: 43 t/day estimated with NakhodkaPort Dickson: 42 t/day estimated with NakhodkaRas Laffan: 42 t/day estimated with NakhodkaKobe: 41 t/day estimated with NakhodkaHitachi: 40 t/day estimated with NakhodkaPenglai: 39 t/day estimated with NakhodkaOfunato: 37 t/day estimated with NakhodkaWeifang Port: 36 t/day estimated with NakhodkaSaigon: 36 t/day estimated with NakhodkaNiigata: 35 t/day estimated with NakhodkaVancouver: 33 t/day estimated with NakhodkaUmm Qasr: 33 t/day estimated with NakhodkaTsukumi: 33 t/day estimated with NakhodkaVillanueva: 33 t/day estimated with NakhodkaOsaka: 33 t/day estimated with NakhodkaOnahama: 33 t/day estimated with NakhodkaKushiro: 32 t/day estimated with NakhodkaSakata: 32 t/day estimated with NakhodkaHarbor Yeweiju: 31 t/day estimated with NakhodkaBremen: 31 t/day estimated with NakhodkaKakinada: 30 t/day estimated with NakhodkaFukui: 29 t/day estimated with NakhodkaPort Botany: 29 t/day estimated with NakhodkaMaizuru: 28 t/day estimated with NakhodkaKanda: 28 t/day estimated with NakhodkaLos Angeles-Long Beach: 27 t/day estimated with NakhodkaPulau Sambu: 26 t/day estimated with NakhodkaGresik: 25 t/day estimated with NakhodkaSanshandaocun: 25 t/day estimated with NakhodkaTsuruga: 24 t/day estimated with NakhodkaPort Est: 24 t/day estimated with NakhodkaBasuo: 23 t/day estimated with NakhodkaCebu: 23 t/day estimated with NakhodkaHakodate: 23 t/day estimated with NakhodkaJebel Ali: 22 t/day estimated with NakhodkaJinhae: 22 t/day estimated with NakhodkaLa Habana: 22 t/day estimated with NakhodkaDavao: 21 t/day estimated with NakhodkaGulei: 21 t/day estimated with NakhodkaAl Hamriyah LPG Terminal: 20 t/day estimated with NakhodkaOtaru: 20 t/day estimated with NakhodkaApra Harbor: 20 t/day estimated with NakhodkaStagen: 20 t/day estimated with NakhodkaMatanzas: 19 t/day estimated with NakhodkaSasebo: 19 t/day estimated with NakhodkaKeelung: 19 t/day estimated with NakhodkaKandla: 19 t/day estimated with NakhodkaCartagena: 19 t/day estimated with NakhodkaRayong: 18 t/day estimated with NakhodkaMonfalcone: 18 t/day estimated with NakhodkaKinuura: 18 t/day estimated with NakhodkaKemaman Harbor: 18 t/day estimated with NakhodkaHai Phong: 17 t/day estimated with NakhodkaKanokawa: 17 t/day estimated with NakhodkaSoyo Angola LNG Terminal: 16 t/day estimated with NakhodkaMale: 16 t/day estimated with NakhodkaSubic Bay: 16 t/day estimated with NakhodkaBelawan: 16 t/day estimated with NakhodkaArkhangelsk: 16 t/day estimated with NakhodkaPort Kembla: 15 t/day estimated with NakhodkaBalikpapan: 14 t/day estimated with NakhodkaTacoma: 14 t/day estimated with NakhodkaChittagong: 14 t/day estimated with NakhodkaLongyan Port: 13 t/day estimated with NakhodkaTokyo: 13 t/day estimated with NakhodkaIshinomaki: 13 t/day estimated with NakhodkaNakhodka
click to enable scroll zoom · drag to pan

Full footprint: all 277 connections of Nakhodka aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.VladivostokRussian Federation5.7 days between calls
  2. 2.Shougang JingtangChina8.4 days between calls
  3. 3.VostochnyyRussian Federation7.5 days between calls
  4. 4.BusanKorea6.3 days between calls
  5. 5.Qingdao PortChina8.9 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Shougang JingtangChina8.5 days between calls
  2. 2.VostochnyyRussian Federation4.4 days between calls
  3. 3.PohangKorea4.9 days between calls
  4. 4.KaohsiungTaiwan Province of China9.0 days between calls
  5. 5.Gwangyang (Kwangyang)Korea6.4 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)