Port profile · Maritime Radar

Port of Muara daily activity

Muara handled an estimated average of 24 kt a day in the week ending 25 September 2026 (+29.5% year on year), with an average of 3 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Brunei Darussalam · LOCODE BNMUA · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Prepared Foodstuffs & Beverages

Data up to · 25 September 2026

7-day average · Estimated total volume

24 kt

28-day average

30 kt

Vs 28-day average

-20.5%

Year on year (same week)

+29.5%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container2222 kt6.8 kt
Dry bulk6111 kt68 kt
General cargo714 kt2.2 kt
Ro-Ro3184 t709 t
Tanker445.9 kt612 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Singapore: 3,471 t/day estimated with MuaraSingaporePort of Sabah: 1,098 t/day estimated with MuaraPort of SabahNingbo: 953 t/day estimated with MuaraNingboPort Hedland: 940 t/day estimated with MuaraPort HedlandPort Klang: 803 t/day estimated with MuaraPort KlangTanjung Pelepas: 701 t/day estimated with MuaraTanjung PelepasBintulu: 525 t/day estimated with MuaraBintuluHong Kong: 441 t/day estimated with MuaraHong KongShanghai: 405 t/day estimated with MuaraShanghaiHuizhou: 369 t/day estimated with MuaraHuizhouYangpu: 351 t/day estimated with MuaraYangpuSaigon: 324 t/day estimated with MuaraSaigonKaohsiung: 324 t/day estimated with MuaraKaohsiungTanjung Priok: 304 t/day estimated with MuaraTanjung PriokPengerang: 282 t/day estimated with MuaraPengerangBatangas City: 279 t/day estimated with MuaraBatangas CityFremantle: 272 t/day estimated with MuaraFremantleDavao: 260 t/day estimated with MuaraDavaoCai Mep: 251 t/day estimated with MuaraCai MepManila: 245 t/day estimated with MuaraManilaGladstone: 239 t/day estimated with MuaraGladstoneDampier: 238 t/day estimated with MuaraDampierTawau: 238 t/day estimated with MuaraTawauKota Kinabalu: 226 t/day estimated with MuaraKota KinabaluEsperance: 225 t/day estimated with MuaraEsperanceMelbourne: 218 t/day estimated with MuaraMelbourneXiagong: 196 t/day estimated with MuaraXiagongNewcastle: 167 t/day estimated with MuaraNewcastleJiangyin: 134 t/day estimated with MuaraJiangyinSuzhou (Taicang): 132 t/day estimated with MuaraSuzhou (Taicang)Map Ta Phut: 132 t/day estimated with MuaraMap Ta PhutSubic Bay: 131 t/day estimated with MuaraSubic BayHai Phong: 128 t/day estimated with MuaraHai PhongGeelong: 125 t/day estimated with MuaraGeelongStagen: 116 t/day estimated with MuaraStagenCebu: 116 t/day estimated with MuaraCebuTownsville: 114 t/day estimated with MuaraTownsvilleGulei: 113 t/day estimated with MuaraGuleiSan Martin: 113 t/day estimated with MuaraSan MartinQinzhou: 110 t/day estimated with MuaraQinzhouJohor: 109 t/day estimated with MuaraJohorJiaxing: 107 t/day estimated with MuaraJiaxingIloilo: 105 t/day estimated with MuaraIloiloGourd Shanzui: 104 t/day estimated with MuaraGourd ShanzuiTuban: 102 t/day estimated with MuaraTubanXiamen: 101 t/day estimated with MuaraXiamenGuangdong Yangjiang Port: 96 t/day estimated with MuaraGuangdong Yangjiang PortTaichung: 95 t/day estimated with MuaraTaichungZhanjiang: 92 t/day estimated with MuaraZhanjiangTianjin Xin Gang: 91 t/day estimated with MuaraTianjin Xin GangFangcheng: 90 t/day estimated with MuaraFangchengIligan: 90 t/day estimated with MuaraIliganRosario: 89 t/day estimated with MuaraRosarioGwangyang (Kwangyang): 83 t/day estimated with MuaraGwangyang (Kwangyang)Kuantan: 83 t/day estimated with MuaraKuantanKuching: 83 t/day estimated with MuaraKuchingUlsan: 79 t/day estimated with MuaraUlsanTanjung Sekong: 74 t/day estimated with MuaraTanjung SekongGuangxi Beibu Gulf Port: 72 t/day estimated with MuaraGuangxi Beibu Gulf PortBrisbane: 72 t/day estimated with MuaraBrisbaneZhuhai: 72 t/day estimated with MuaraVisakhapatnam: 70 t/day estimated with MuaraBanten: 68 t/day estimated with MuaraVan Phong: 67 t/day estimated with MuaraPort Adelaide: 66 t/day estimated with MuaraTanjung Sangata: 62 t/day estimated with MuaraCagayan de Oro: 59 t/day estimated with MuaraSiam Seaport: 59 t/day estimated with MuaraLianyungang: 55 t/day estimated with MuaraChangzhou: 55 t/day estimated with MuaraFujairah: 53 t/day estimated with MuaraMailiao: 52 t/day estimated with MuaraVillanueva: 52 t/day estimated with MuaraPort Elizabeth: 52 t/day estimated with MuaraPorto De Suape: 51 t/day estimated with MuaraTokuyama: 50 t/day estimated with MuaraXiuyu: 50 t/day estimated with MuaraBayuquan: 48 t/day estimated with MuaraNew Mangalore: 48 t/day estimated with MuaraMarsden Point: 48 t/day estimated with MuaraJinzhou: 46 t/day estimated with MuaraKanda: 46 t/day estimated with MuaraZhapu: 44 t/day estimated with MuaraKamarajar Port: 44 t/day estimated with MuaraDaesan: 44 t/day estimated with MuaraUbe: 43 t/day estimated with MuaraGuangzhou (Nansha): 43 t/day estimated with MuaraQiwei: 41 t/day estimated with MuaraLanqiao Port: 40 t/day estimated with MuaraPort Botany: 40 t/day estimated with MuaraTanjunguban: 40 t/day estimated with MuaraKâmpóng Saôm: 39 t/day estimated with MuaraMumbai-Jawaharlal Nehru (Nhava Sheva): 39 t/day estimated with MuaraTauranga: 37 t/day estimated with MuaraMackay: 36 t/day estimated with MuaraYangon: 36 t/day estimated with MuaraCape Town: 36 t/day estimated with MuaraVictoria: 36 t/day estimated with MuaraSerangoon Harbor: 36 t/day estimated with MuaraKemaman Harbor: 35 t/day estimated with MuaraBalikpapan: 35 t/day estimated with MuaraLazaro Cardenas: 35 t/day estimated with MuaraDalian: 34 t/day estimated with MuaraJebel Ali: 34 t/day estimated with MuaraBroome: 34 t/day estimated with MuaraCalaca: 34 t/day estimated with MuaraDarwin: 33 t/day estimated with MuaraFuzhou: 33 t/day estimated with MuaraWyndham: 32 t/day estimated with MuaraPuerto Montt: 32 t/day estimated with MuaraHarbor Yeweiju: 30 t/day estimated with MuaraManzanillo: 30 t/day estimated with MuaraTopolobampo: 30 t/day estimated with MuaraChiba: 30 t/day estimated with MuaraPenang: 30 t/day estimated with MuaraMerak Mas Terminal: 29 t/day estimated with MuaraBangkok: 29 t/day estimated with MuaraLos Angeles-Long Beach: 28 t/day estimated with MuaraVladivostok: 28 t/day estimated with MuaraLirquen: 27 t/day estimated with MuaraBuco: 27 t/day estimated with MuaraSandakan: 27 t/day estimated with MuaraDongguan: 27 t/day estimated with MuaraChaozhou: 26 t/day estimated with MuaraGresik: 26 t/day estimated with MuaraKrishnapatnam Port: 26 t/day estimated with MuaraHazira: 24 t/day estimated with MuaraSungai Pakning: 24 t/day estimated with MuaraNagoya: 24 t/day estimated with MuaraMizushima: 24 t/day estimated with MuaraLuoyuan: 24 t/day estimated with MuaraBahia Blanca: 24 t/day estimated with MuaraSuzhou (Zhangjiagang): 24 t/day estimated with MuaraMina Saqr: 24 t/day estimated with MuaraKandla: 24 t/day estimated with MuaraChittagong: 24 t/day estimated with MuaraWeihai: 23 t/day estimated with MuaraWeipa: 23 t/day estimated with MuaraHambantota: 23 t/day estimated with MuaraPLTU Semen Tonasa: 23 t/day estimated with MuaraTuticorin: 23 t/day estimated with MuaraGeneral Santos: 22 t/day estimated with MuaraMuhammad Bin Qasim: 22 t/day estimated with MuaraDurban: 22 t/day estimated with MuaraPort de Longoni: 21 t/day estimated with MuaraDel Guazu: 20 t/day estimated with MuaraTangshan (Jingtang): 19 t/day estimated with MuaraDung Quat: 19 t/day estimated with MuaraPort Kembla: 18 t/day estimated with MuaraSydney: 18 t/day estimated with MuaraHaldia: 18 t/day estimated with MuaraGove: 18 t/day estimated with MuaraKarachi: 17 t/day estimated with MuaraLaem Chabang: 17 t/day estimated with MuaraSanshandaocun: 17 t/day estimated with MuaraTexas City: 16 t/day estimated with MuaraWakayama-Shimotsu: 16 t/day estimated with MuaraYokkaichi: 15 t/day estimated with MuaraBuenaventura: 15 t/day estimated with MuaraAlbany: 15 t/day estimated with MuaraCairns: 15 t/day estimated with MuaraPhiladelphia: 15 t/day estimated with MuaraVanino: 14 t/day estimated with MuaraGeraldton: 13 t/day estimated with MuaraHon Gai: 13 t/day estimated with MuaraShougang Jingtang: 13 t/day estimated with MuaraDafeng: 12 t/day estimated with MuaraNew Plymouth: 12 t/day estimated with MuaraOsaka: 12 t/day estimated with MuaraTanjung Geren: 12 t/day estimated with MuaraBeira: 11 t/day estimated with MuaraStockton: 11 t/day estimated with MuaraTsuruga: 11 t/day estimated with MuaraPort Dickson: 11 t/day estimated with MuaraBluff Harbor: 10 t/day estimated with MuaraTg Mani: 10 t/day estimated with MuaraChiwan: 10 t/day estimated with MuaraKirteh Oil Terminal: 10 t/day estimated with MuaraTomakomai: 10 t/day estimated with MuaraBasuo: 10 t/day estimated with MuaraRumoi: 9 t/day estimated with MuaraKota Baru: 9 t/day estimated with MuaraKawasaki: 9 t/day estimated with MuaraZhoushan: 9 t/day estimated with MuaraShekou (Shenzhen): 8 t/day estimated with MuaraHamada: 8 t/day estimated with MuaraIncheon: 8 t/day estimated with MuaraSuzhou (Changshu): 8 t/day estimated with MuaraOfunato: 8 t/day estimated with MuaraKarimun: 7 t/day estimated with MuaraHibikinada: 7 t/day estimated with MuaraSurabaya: 6 t/day estimated with MuaraQingdao Port: 6 t/day estimated with MuaraZhouliwang: 6 t/day estimated with MuaraRizhao: 6 t/day estimated with MuaraMatsuyama: 5 t/day estimated with MuaraKashima-Ibaraki: 5 t/day estimated with MuaraKeelung: 5 t/day estimated with MuaraIndonesia Morowali Industrial Park: 5 t/day estimated with MuaraJubail: 5 t/day estimated with MuaraMuara
click to enable scroll zoom · drag to pan

Full footprint: all 242 connections of Muara aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.SingaporeSingapore4.8 days between calls
  2. 2.Port KlangMalaysia4.6 days between calls
  3. 3.Tanjung PelepasMalaysia2.9 days between calls
  4. 4.Port of SabahMalaysia1.2 days between calls
  5. 5.Hong KongHong Kong SAR4.9 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.SingaporeSingapore5.0 days between calls
  2. 2.Port HedlandAustralia11.9 days between calls
  3. 3.NingboChina8.9 days between calls
  4. 4.Port of SabahMalaysia2.4 days between calls
  5. 5.BintuluMalaysia7.4 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)