Port profile · Maritime Radar

Port of Milner Bay daily activity

Milner Bay handled an estimated average of 15 kt a day in the week ending 25 September 2026 (-34.9% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Australia · LOCODE AUMIB · Main cargo sectors: Mineral Products, Vegetable Products, Chemical & Allied Industries

Data up to · 25 September 2026

7-day average · Estimated total volume

15 kt

28-day average

15 kt

Vs 28-day average

+2.7%

Year on year (same week)

-34.9%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container10 t29 kt
Dry bulk80 t390 kt
General cargo10 t0 t
Ro-Ro2286 t38 t
Tanker10 t0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Qinzhou: 4,843 t/day estimated with Milner BayQinzhouTianjin Xin Gang: 4,058 t/day estimated with Milner BayTianjin Xin GangVisakhapatnam: 982 t/day estimated with Milner BayVisakhapatnamBell Bay: 652 t/day estimated with Milner BayBell BayDarwin: 371 t/day estimated with Milner BayDarwinHigashiharima: 331 t/day estimated with Milner BayHigashiharimaPyeongtaek: 301 t/day estimated with Milner BayPyeongtaekDonghae: 276 t/day estimated with Milner BayDonghaeGwangyang (Kwangyang): 233 t/day estimated with Milner BayGwangyang (Kwangyang)Jinzhou: 194 t/day estimated with Milner BayJinzhouIndonesia Morowali Industrial Park: 181 t/day estimated with Milner BayIndonesia Morowali Industrial ParkManila: 145 t/day estimated with Milner BayManilaTachibana: 111 t/day estimated with Milner BayTachibanaLanqiao Port: 99 t/day estimated with Milner BayLanqiao PortSingapore: 90 t/day estimated with Milner BaySingaporeMumbai-Jawaharlal Nehru (Nhava Sheva): 58 t/day estimated with Milner BayMumbai-Jawaharlal Nehru (Nhava Sheva)Gladstone: 57 t/day estimated with Milner BayGladstonePohang: 51 t/day estimated with Milner BayPohangKisarazu: 45 t/day estimated with Milner BayKisarazuZhoushan: 42 t/day estimated with Milner BayZhoushanFangcheng: 39 t/day estimated with Milner BayFangchengSuzhou (Taicang): 38 t/day estimated with Milner BaySuzhou (Taicang)Haldia: 37 t/day estimated with Milner BayHaldiaUlsan: 33 t/day estimated with Milner BayUlsanPort Hedland: 32 t/day estimated with Milner BayPort HedlandTaichung: 27 t/day estimated with Milner BayTaichungTangshan (Jingtang): 27 t/day estimated with Milner BayTangshan (Jingtang)Khalifa Port: 25 t/day estimated with Milner BayKhalifa PortKemaman Harbor: 24 t/day estimated with Milner BayKemaman HarborPort Kembla: 24 t/day estimated with Milner BayPort KemblaBintulu: 24 t/day estimated with Milner BayBintuluBrisbane: 23 t/day estimated with Milner BayBrisbaneHong Kong: 23 t/day estimated with Milner BayHong KongParadip: 23 t/day estimated with Milner BayParadipLianyungang: 22 t/day estimated with Milner BayLianyungangPort Elizabeth: 21 t/day estimated with Milner BayPort ElizabethHososhima: 21 t/day estimated with Milner BayHososhimaSendai-Shiogama: 20 t/day estimated with Milner BaySendai-ShiogamaMelbourne: 19 t/day estimated with Milner BayMelbourneTownsville: 19 t/day estimated with Milner BayTownsvillePengerang: 18 t/day estimated with Milner BayPengerangYokkaichi: 18 t/day estimated with Milner BayYokkaichiDaesan: 17 t/day estimated with Milner BayDaesanTanjung Pelepas: 17 t/day estimated with Milner BayTanjung PelepasPort Moresby: 16 t/day estimated with Milner BayPort MoresbyKobe: 16 t/day estimated with Milner BayKobeKaohsiung: 15 t/day estimated with Milner BayKaohsiungShougang Jingtang: 14 t/day estimated with Milner BayShougang JingtangNew Mangalore: 14 t/day estimated with Milner BayNew MangaloreCebu: 13 t/day estimated with Milner BayCebuFremantle: 13 t/day estimated with Milner BayFremantleIligan: 13 t/day estimated with Milner BayIliganBayuquan: 13 t/day estimated with Milner BayBayuquanSubic Bay: 13 t/day estimated with Milner BaySubic BayKanda: 13 t/day estimated with Milner BayKandaSurabaya: 13 t/day estimated with Milner BaySurabayaXiamen: 13 t/day estimated with Milner BayXiamenKashima-Ibaraki: 13 t/day estimated with Milner BayKashima-IbarakiEsperance: 13 t/day estimated with Milner BayEsperanceNantong: 12 t/day estimated with Milner BayNantongOdessa: 12 t/day estimated with Milner BayBusan: 12 t/day estimated with Milner BayIshinomaki: 12 t/day estimated with Milner BayHuanghua: 12 t/day estimated with Milner BayShanghai: 12 t/day estimated with Milner BayKarachi: 12 t/day estimated with Milner BayZhouliwang: 12 t/day estimated with Milner BayNiihama: 5 t/day estimated with Milner BayGove: 2 t/day estimated with Milner BayCairns: 1 t/day estimated with Milner BayWeipa: 1 t/day estimated with Milner BayMilner Bay
click to enable scroll zoom · drag to pan

Full footprint: all 71 connections of Milner Bay aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.DarwinAustralia2.9 days between calls
  2. 2.QinzhouChina16.4 days between calls
  3. 3.Tianjin Xin GangChina17.0 days between calls
  4. 4.VisakhapatnamIndia28.1 days between calls
  5. 5.ZhoushanChina14.6 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.QinzhouChina15.5 days between calls
  2. 2.Tianjin Xin GangChina15.4 days between calls
  3. 3.VisakhapatnamIndia17.9 days between calls
  4. 4.Bell BayAustralia10.4 days between calls
  5. 5.HigashiharimaJapan17.1 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)