Port profile · Maritime Radar

Port of Cochin (Kochi) daily activity

Cochin (Kochi) handled an estimated average of 29 kt a day in the week ending 25 September 2026 (+35.7% year on year), with an average of 3 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
India · Main cargo sectors: Mineral Products, Vegetable Products, Chemical & Allied Industries

Data up to · 25 September 2026

7-day average · Estimated total volume

29 kt

28-day average

32 kt

Vs 28-day average

-10.4%

Year on year (same week)

+35.7%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container42258 kt99 kt
Dry bulk568 kt28 kt
General cargo50 t1.4 kt
Ro-Ro00 t0 t
Tanker28150 kt306 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Colombo: 12,313 t/day estimated with Cochin (Kochi)ColomboNew Mangalore: 8,410 t/day estimated with Cochin (Kochi)New MangaloreJebel Ali: 5,028 t/day estimated with Cochin (Kochi)Jebel AliMumbai-Jawaharlal Nehru (Nhava Sheva): 4,598 t/day estimated with Cochin (Kochi)Mumbai-Jawaharlal Nehru (Nhava Sheva)Kandla: 4,564 t/day estimated with Cochin (Kochi)KandlaTuticorin: 3,890 t/day estimated with Cochin (Kochi)TuticorinKamarajar Port: 2,939 t/day estimated with Cochin (Kochi)Kamarajar PortPipavav Port: 2,624 t/day estimated with Cochin (Kochi)Pipavav PortDamietta: 2,386 t/day estimated with Cochin (Kochi)DamiettaPort Klang: 1,999 t/day estimated with Cochin (Kochi)Port KlangMundra: 1,923 t/day estimated with Cochin (Kochi)MundraKrishnapatnam Port: 1,545 t/day estimated with Cochin (Kochi)Krishnapatnam PortHazira: 1,069 t/day estimated with Cochin (Kochi)HaziraChennai (Madras): 1,007 t/day estimated with Cochin (Kochi)Chennai (Madras)Singapore: 906 t/day estimated with Cochin (Kochi)SingaporeMormugao: 747 t/day estimated with Cochin (Kochi)MormugaoParadip: 743 t/day estimated with Cochin (Kochi)ParadipVisakhapatnam: 591 t/day estimated with Cochin (Kochi)VisakhapatnamPiraeus: 514 t/day estimated with Cochin (Kochi)PiraeusRotterdam: 426 t/day estimated with Cochin (Kochi)RotterdamValencia: 370 t/day estimated with Cochin (Kochi)ValenciaKakinada: 355 t/day estimated with Cochin (Kochi)KakinadaNew Orleans: 259 t/day estimated with Cochin (Kochi)New OrleansSalalah: 215 t/day estimated with Cochin (Kochi)SalalahHaldia: 200 t/day estimated with Cochin (Kochi)HaldiaJubail: 196 t/day estimated with Cochin (Kochi)JubailJorf Lasfar: 192 t/day estimated with Cochin (Kochi)Jorf LasfarSoyo Angola LNG Terminal: 182 t/day estimated with Cochin (Kochi)Soyo Angola LNG TerminalDurban: 162 t/day estimated with Cochin (Kochi)DurbanSikka: 154 t/day estimated with Cochin (Kochi)SikkaGorgon LNG: 149 t/day estimated with Cochin (Kochi)Gorgon LNGQalhat LNG Terminal: 149 t/day estimated with Cochin (Kochi)Qalhat LNG TerminalLondon Gateway: 142 t/day estimated with Cochin (Kochi)London GatewayBonny: 142 t/day estimated with Cochin (Kochi)BonnyFujairah: 138 t/day estimated with Cochin (Kochi)FujairahDahej: 135 t/day estimated with Cochin (Kochi)DahejBeira: 133 t/day estimated with Cochin (Kochi)BeiraTanjung Pelepas: 130 t/day estimated with Cochin (Kochi)Tanjung PelepasKattupalli: 125 t/day estimated with Cochin (Kochi)KattupalliCotonou: 123 t/day estimated with Cochin (Kochi)CotonouRas Laffan: 122 t/day estimated with Cochin (Kochi)Ras LaffanChittagong: 118 t/day estimated with Cochin (Kochi)ChittagongCorpus Christi: 98 t/day estimated with Cochin (Kochi)Corpus ChristiHouston (US-TX): 97 t/day estimated with Cochin (Kochi)Houston (US-TX)Safi: 90 t/day estimated with Cochin (Kochi)SafiJabal Az Zannah-Ruways: 87 t/day estimated with Cochin (Kochi)Jabal Az Zannah-RuwaysCasablanca: 80 t/day estimated with Cochin (Kochi)CasablancaLos Angeles-Long Beach: 79 t/day estimated with Cochin (Kochi)Los Angeles-Long BeachShekou (Shenzhen): 77 t/day estimated with Cochin (Kochi)Shekou (Shenzhen)Al Hamriyah LPG Terminal: 75 t/day estimated with Cochin (Kochi)Al Hamriyah LPG TerminalDjibouti: 72 t/day estimated with Cochin (Kochi)DjiboutiTrincomalee: 71 t/day estimated with Cochin (Kochi)TrincomaleePort Elizabeth: 68 t/day estimated with Cochin (Kochi)Port ElizabethMuhammad Bin Qasim: 67 t/day estimated with Cochin (Kochi)Muhammad Bin QasimJeddah: 63 t/day estimated with Cochin (Kochi)JeddahLas Palmas (de Gran Canaria): 63 t/day estimated with Cochin (Kochi)Las Palmas (de Gran Canaria)Lome: 59 t/day estimated with Cochin (Kochi)LomeNingbo: 58 t/day estimated with Cochin (Kochi)NingboGwangyang (Kwangyang): 57 t/day estimated with Cochin (Kochi)Gwangyang (Kwangyang)Cai Mep: 57 t/day estimated with Cochin (Kochi)Cai MepSitrah: 57 t/day estimated with Cochin (Kochi)Hong Kong: 56 t/day estimated with Cochin (Kochi)Khalifa Port: 55 t/day estimated with Cochin (Kochi)Richards Bay: 54 t/day estimated with Cochin (Kochi)Doha-Umm Said: 52 t/day estimated with Cochin (Kochi)Mina Saqr: 50 t/day estimated with Cochin (Kochi)Juaymah: 49 t/day estimated with Cochin (Kochi)Pengerang: 48 t/day estimated with Cochin (Kochi)Montoir: 48 t/day estimated with Cochin (Kochi)Primorsk: 47 t/day estimated with Cochin (Kochi)Vizhinjam: 46 t/day estimated with Cochin (Kochi)Mailiao: 44 t/day estimated with Cochin (Kochi)Fos: 44 t/day estimated with Cochin (Kochi)Port of Sohar: 43 t/day estimated with Cochin (Kochi)Tema: 43 t/day estimated with Cochin (Kochi)Ngqura: 42 t/day estimated with Cochin (Kochi)Karachi: 42 t/day estimated with Cochin (Kochi)Saigon: 40 t/day estimated with Cochin (Kochi)Algeciras: 40 t/day estimated with Cochin (Kochi)Port Said: 40 t/day estimated with Cochin (Kochi)Port Louis: 38 t/day estimated with Cochin (Kochi)Dakar: 37 t/day estimated with Cochin (Kochi)Nagoya: 36 t/day estimated with Cochin (Kochi)Shanghai: 36 t/day estimated with Cochin (Kochi)Malabo: 35 t/day estimated with Cochin (Kochi)Batangas City: 35 t/day estimated with Cochin (Kochi)Thamesport: 35 t/day estimated with Cochin (Kochi)Tianjin Xin Gang: 34 t/day estimated with Cochin (Kochi)Mina Al Ahmadi: 34 t/day estimated with Cochin (Kochi)Sakai-Semboku: 33 t/day estimated with Cochin (Kochi)Punta Loyola: 32 t/day estimated with Cochin (Kochi)Ulsan: 32 t/day estimated with Cochin (Kochi)Bahia Quintero (Ventanas): 32 t/day estimated with Cochin (Kochi)Taboguilla: 31 t/day estimated with Cochin (Kochi)Hambantota: 30 t/day estimated with Cochin (Kochi)Barbor's Point: 30 t/day estimated with Cochin (Kochi)Anacortes: 29 t/day estimated with Cochin (Kochi)Xiuyu: 29 t/day estimated with Cochin (Kochi)Fremantle: 28 t/day estimated with Cochin (Kochi)Abidjan: 28 t/day estimated with Cochin (Kochi)Port Est: 28 t/day estimated with Cochin (Kochi)Zhapu: 26 t/day estimated with Cochin (Kochi)Genova: 25 t/day estimated with Cochin (Kochi)Yakacik: 25 t/day estimated with Cochin (Kochi)Zhanjiang: 25 t/day estimated with Cochin (Kochi)Mombasa: 25 t/day estimated with Cochin (Kochi)Yingkou: 25 t/day estimated with Cochin (Kochi)Monfalcone: 25 t/day estimated with Cochin (Kochi)Beihai: 25 t/day estimated with Cochin (Kochi)Antwerp: 24 t/day estimated with Cochin (Kochi)Port Blair: 24 t/day estimated with Cochin (Kochi)Shougang Jingtang: 24 t/day estimated with Cochin (Kochi)Taichung: 22 t/day estimated with Cochin (Kochi)Paranaguá: 22 t/day estimated with Cochin (Kochi)Dar Es Salaam: 22 t/day estimated with Cochin (Kochi)Yantian: 22 t/day estimated with Cochin (Kochi)Jaigad Port: 21 t/day estimated with Cochin (Kochi)Bandar Shahid Rajaee: 21 t/day estimated with Cochin (Kochi)Luoyuan: 20 t/day estimated with Cochin (Kochi)King Abdullah Port: 20 t/day estimated with Cochin (Kochi)Lagos: 20 t/day estimated with Cochin (Kochi)Navlakhi: 19 t/day estimated with Cochin (Kochi)Bandar Khomeini: 19 t/day estimated with Cochin (Kochi)Maputo: 19 t/day estimated with Cochin (Kochi)Qingdao Port: 19 t/day estimated with Cochin (Kochi)Matadi: 19 t/day estimated with Cochin (Kochi)Monrovia: 19 t/day estimated with Cochin (Kochi)Bissau: 18 t/day estimated with Cochin (Kochi)Oita: 18 t/day estimated with Cochin (Kochi)South Louisiana: 18 t/day estimated with Cochin (Kochi)Constantza: 18 t/day estimated with Cochin (Kochi)Diliskelesi: 17 t/day estimated with Cochin (Kochi)Santa Cruz De Tenerife: 17 t/day estimated with Cochin (Kochi)Karimun: 17 t/day estimated with Cochin (Kochi)Rayong: 17 t/day estimated with Cochin (Kochi)Douala: 17 t/day estimated with Cochin (Kochi)Daesan: 17 t/day estimated with Cochin (Kochi)Sines: 16 t/day estimated with Cochin (Kochi)Phuket: 16 t/day estimated with Cochin (Kochi)Kawasaki: 15 t/day estimated with Cochin (Kochi)General Santos: 15 t/day estimated with Cochin (Kochi)Buenos Aires: 15 t/day estimated with Cochin (Kochi)Rio Grande: 15 t/day estimated with Cochin (Kochi)Safaga: 15 t/day estimated with Cochin (Kochi)Eilat: 14 t/day estimated with Cochin (Kochi)Banten: 14 t/day estimated with Cochin (Kochi)Saint Petersburg: 14 t/day estimated with Cochin (Kochi)Zhuhai: 14 t/day estimated with Cochin (Kochi)Port-De-Bouc: 13 t/day estimated with Cochin (Kochi)Yangon: 13 t/day estimated with Cochin (Kochi)Walvis Bay: 13 t/day estimated with Cochin (Kochi)Novorossiysk: 13 t/day estimated with Cochin (Kochi)Penang: 13 t/day estimated with Cochin (Kochi)Felixstowe: 12 t/day estimated with Cochin (Kochi)Suzhou (Zhangjiagang): 12 t/day estimated with Cochin (Kochi)Annaba: 12 t/day estimated with Cochin (Kochi)Rabigh: 12 t/day estimated with Cochin (Kochi)Benghazi: 12 t/day estimated with Cochin (Kochi)Savannah: 11 t/day estimated with Cochin (Kochi)Kaohsiung: 10 t/day estimated with Cochin (Kochi)Ghent: 10 t/day estimated with Cochin (Kochi)Ventspils: 10 t/day estimated with Cochin (Kochi)Merak Mas Terminal: 10 t/day estimated with Cochin (Kochi)Sfax: 10 t/day estimated with Cochin (Kochi)San Martin: 10 t/day estimated with Cochin (Kochi)Panjang: 10 t/day estimated with Cochin (Kochi)Barcelona: 9 t/day estimated with Cochin (Kochi)Hamad Port: 9 t/day estimated with Cochin (Kochi)Guangzhou (Nansha): 9 t/day estimated with Cochin (Kochi)Mersin: 9 t/day estimated with Cochin (Kochi)Hudaydah (Hodeidah): 9 t/day estimated with Cochin (Kochi)Port Everglades: 9 t/day estimated with Cochin (Kochi)Ras Al-Khair: 9 t/day estimated with Cochin (Kochi)Qiwei: 9 t/day estimated with Cochin (Kochi)Al Adabiyah: 9 t/day estimated with Cochin (Kochi)Map Ta Phut: 8 t/day estimated with Cochin (Kochi)Changzhou: 8 t/day estimated with Cochin (Kochi)Male: 8 t/day estimated with Cochin (Kochi)Tarragona: 8 t/day estimated with Cochin (Kochi)Burgas: 8 t/day estimated with Cochin (Kochi)Tanjung Geren: 8 t/day estimated with Cochin (Kochi)Dalian: 7 t/day estimated with Cochin (Kochi)Tanjunguban: 7 t/day estimated with Cochin (Kochi)San Vicente: 7 t/day estimated with Cochin (Kochi)Karaikal: 7 t/day estimated with Cochin (Kochi)Duba (Port of Neom): 7 t/day estimated with Cochin (Kochi)Sharjah: 7 t/day estimated with Cochin (Kochi)Nemrut Bay: 7 t/day estimated with Cochin (Kochi)Kuantan: 7 t/day estimated with Cochin (Kochi)Arzew: 6 t/day estimated with Cochin (Kochi)Karwar: 6 t/day estimated with Cochin (Kochi)Yanbu (King Fahd Port): 6 t/day estimated with Cochin (Kochi)Dumai: 6 t/day estimated with Cochin (Kochi)Hai Phong: 6 t/day estimated with Cochin (Kochi)Fangcheng: 6 t/day estimated with Cochin (Kochi)Chornomorsk: 6 t/day estimated with Cochin (Kochi)Kulevi Oil Terminal: 6 t/day estimated with Cochin (Kochi)Cape Town: 5 t/day estimated with Cochin (Kochi)Longkou Gang: 5 t/day estimated with Cochin (Kochi)Gresik: 5 t/day estimated with Cochin (Kochi)Cochin (Kochi)
click to enable scroll zoom · drag to pan

Full footprint: all 254 connections of Cochin (Kochi) aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.ColomboSri Lanka1.7 days between calls
  2. 2.New MangaloreIndia2.7 days between calls
  3. 3.KandlaIndia4.4 days between calls
  4. 4.Pipavav PortIndia3.8 days between calls
  5. 5.Jebel AliUnited Arab Emirates5.7 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.ColomboSri Lanka1.9 days between calls
  2. 2.New MangaloreIndia4.7 days between calls
  3. 3.Kamarajar PortIndia7.4 days between calls
  4. 4.Mumbai-Jawaharlal Nehru (Nhava Sheva)India7.3 days between calls
  5. 5.Jebel AliUnited Arab Emirates5.8 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)