Port profile · Maritime Radar

Port of Göteborg daily activity

Göteborg handled an estimated average of 50 kt a day in the week ending 25 September 2026 (-7.2% year on year), with an average of 10 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Sweden · LOCODE SEGOT · Main cargo sectors: Mineral Products, Wood & Wood Products, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

50 kt

28-day average

63 kt

Vs 28-day average

-20.8%

Year on year (same week)

-7.2%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container3327 kt127 kt
Dry bulk20 t43 kt
General cargo1722 kt10 kt
Ro-Ro6955 kt71 kt
Tanker153863 kt557 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Rotterdam: 11,775 t/day estimated with GöteborgRotterdamAarhus: 11,642 t/day estimated with GöteborgAarhusBremerhaven: 9,301 t/day estimated with GöteborgBremerhavenMongstad: 6,455 t/day estimated with GöteborgMongstadBrofjorden: 6,391 t/day estimated with GöteborgBrofjordenZeebrugge: 4,289 t/day estimated with GöteborgZeebruggeAntwerp: 4,056 t/day estimated with GöteborgAntwerpImmingham: 3,600 t/day estimated with GöteborgImminghamStura: 3,118 t/day estimated with GöteborgSturaHamburg: 2,461 t/day estimated with GöteborgHamburgWilhelmshaven: 2,295 t/day estimated with GöteborgWilhelmshavenTeesport: 2,286 t/day estimated with GöteborgTeesportTerneuzen: 2,266 t/day estimated with GöteborgTerneuzenHelsingborg: 2,255 t/day estimated with GöteborgHelsingborgGhent: 2,191 t/day estimated with GöteborgGhentFredericia: 1,989 t/day estimated with GöteborgFredericiaMalmö: 1,733 t/day estimated with GöteborgMalmöHouston (US-TX): 1,528 t/day estimated with GöteborgHouston (US-TX)Fredrikshamn: 1,459 t/day estimated with GöteborgFredrikshamnKøbenhavn: 1,439 t/day estimated with GöteborgKøbenhavnAmsterdam: 1,145 t/day estimated with GöteborgAmsterdamMäntyluoto: 1,132 t/day estimated with GöteborgMäntyluotoOslo: 1,004 t/day estimated with GöteborgOsloInkoo: 895 t/day estimated with GöteborgInkooBrunsbuettel: 892 t/day estimated with GöteborgBrunsbuettelHalmstad: 873 t/day estimated with GöteborgHalmstadOulu: 865 t/day estimated with GöteborgOuluKalundborg: 845 t/day estimated with GöteborgKalundborgNorrköping: 786 t/day estimated with GöteborgNorrköpingSkagen: 754 t/day estimated with GöteborgSkagenSkoldvik: 747 t/day estimated with GöteborgSkoldvikSödertälje: 746 t/day estimated with GöteborgSödertäljeIJmuiden: 738 t/day estimated with GöteborgIJmuidenCorpus Christi: 736 t/day estimated with GöteborgCorpus ChristiGdynia: 674 t/day estimated with GöteborgGdyniaGdansk: 653 t/day estimated with GöteborgGdanskLas Palmas (de Gran Canaria): 647 t/day estimated with GöteborgLas Palmas (de Gran Canaria)Gävle: 628 t/day estimated with GöteborgGävleFinnart Oil Terminal: 562 t/day estimated with GöteborgFinnart Oil TerminalKarlshamn: 560 t/day estimated with GöteborgKarlshamnLiverpool: 552 t/day estimated with GöteborgLiverpoolMilford Haven: 547 t/day estimated with GöteborgMilford HavenPort Arthur: 520 t/day estimated with GöteborgPort ArthurAz Zawiyah: 516 t/day estimated with GöteborgAz ZawiyahDrammen: 512 t/day estimated with GöteborgDrammenSlagentangen: 512 t/day estimated with GöteborgSlagentangenVaasa: 478 t/day estimated with GöteborgVaasaTrondheim: 465 t/day estimated with GöteborgTrondheimFawley: 455 t/day estimated with GöteborgFawleyTananger: 455 t/day estimated with GöteborgTanangerLe Havre: 442 t/day estimated with GöteborgLe HavrePiteå: 429 t/day estimated with GöteborgPiteåKlaipeda: 419 t/day estimated with GöteborgKlaipedaKristiansand: 414 t/day estimated with GöteborgKristiansandLuleå: 382 t/day estimated with GöteborgLuleåAalborg: 376 t/day estimated with GöteborgAalborgMuuga-Port of Tallinn: 375 t/day estimated with GöteborgMuuga-Port of TallinnTrieste: 373 t/day estimated with GöteborgTriesteBrevik: 357 t/day estimated with GöteborgBrevikNynäshamn: 351 t/day estimated with GöteborgNynäshamnStenungsund: 329 t/day estimated with GöteborgSines: 329 t/day estimated with GöteborgNew York-New Jersey: 314 t/day estimated with GöteborgThyboron: 267 t/day estimated with GöteborgSandnessjøen: 266 t/day estimated with GöteborgStavanger: 255 t/day estimated with GöteborgLondon: 252 t/day estimated with GöteborgStockholm: 252 t/day estimated with GöteborgAlgeciras: 252 t/day estimated with GöteborgRas Laffan: 247 t/day estimated with GöteborgHammerfest: 243 t/day estimated with GöteborgFredrikstad: 225 t/day estimated with GöteborgBeaumont: 222 t/day estimated with GöteborgFrederikshavn: 219 t/day estimated with GöteborgPort Aransas: 212 t/day estimated with GöteborgUst-Luga: 206 t/day estimated with GöteborgBilbao: 192 t/day estimated with GöteborgOdense: 181 t/day estimated with GöteborgRostock: 181 t/day estimated with GöteborgVästerås: 174 t/day estimated with GöteborgMontoir: 168 t/day estimated with GöteborgGarston: 167 t/day estimated with GöteborgSingapore: 163 t/day estimated with GöteborgKalmar: 158 t/day estimated with GöteborgGrangemouth: 157 t/day estimated with GöteborgMoerdijk: 145 t/day estimated with GöteborgPort Jerome: 141 t/day estimated with GöteborgNaantali: 139 t/day estimated with GöteborgEsbjerg: 134 t/day estimated with GöteborgCartagena: 133 t/day estimated with GöteborgStade: 129 t/day estimated with GöteborgRiga: 128 t/day estimated with GöteborgSouthampton: 128 t/day estimated with GöteborgZhanjiang: 124 t/day estimated with GöteborgPascagoula: 122 t/day estimated with GöteborgNingbo: 120 t/day estimated with GöteborgSullom Voe: 120 t/day estimated with GöteborgFelixstowe: 116 t/day estimated with GöteborgLarvik: 114 t/day estimated with GöteborgVentspils: 113 t/day estimated with GöteborgHuelva: 112 t/day estimated with GöteborgVado Ligure: 109 t/day estimated with GöteborgGwangyang (Kwangyang): 108 t/day estimated with GöteborgAntifer: 108 t/day estimated with GöteborgÅlesund: 108 t/day estimated with GöteborgChiriquí Grande: 106 t/day estimated with GöteborgSundsvall: 104 t/day estimated with GöteborgHirtshals: 104 t/day estimated with GöteborgZhoushan: 103 t/day estimated with GöteborgSzczecin: 102 t/day estimated with GöteborgStigsnaes: 102 t/day estimated with GöteborgSaint Petersburg: 98 t/day estimated with GöteborgDublin: 97 t/day estimated with GöteborgSanta Panagia: 97 t/day estimated with GöteborgDunkirk: 93 t/day estimated with GöteborgPuerto Miranda: 92 t/day estimated with GöteborgTaboguilla: 90 t/day estimated with GöteborgOmisalj: 89 t/day estimated with GöteborgTexas City: 88 t/day estimated with GöteborgKøge: 86 t/day estimated with GöteborgCuxhaven: 85 t/day estimated with GöteborgEl Sokhna: 83 t/day estimated with GöteborgOxelösund: 82 t/day estimated with GöteborgKotka: 82 t/day estimated with GöteborgUmea Hamn: 80 t/day estimated with GöteborgLiepaja: 78 t/day estimated with GöteborgRouen: 77 t/day estimated with GöteborgGuayanilla: 76 t/day estimated with GöteborgRayong: 76 t/day estimated with GöteborgSillamae: 70 t/day estimated with GöteborgFos: 68 t/day estimated with GöteborgAliaga: 67 t/day estimated with GöteborgRas Tanura: 66 t/day estimated with GöteborgVlissingen: 65 t/day estimated with GöteborgDalian: 65 t/day estimated with GöteborgSkelleftehamn: 64 t/day estimated with GöteborgWhiffen Head: 63 t/day estimated with GöteborgÅbenrå: 62 t/day estimated with GöteborgWismar: 62 t/day estimated with GöteborgCanaport (St. John): 60 t/day estimated with GöteborgCeuta: 59 t/day estimated with GöteborgTianjin Xin Gang: 59 t/day estimated with GöteborgPoint Tupper: 58 t/day estimated with GöteborgVysotsk: 58 t/day estimated with GöteborgSaldanha Bay: 58 t/day estimated with GöteborgArrecife: 58 t/day estimated with GöteborgMarkenes: 57 t/day estimated with GöteborgBremen: 56 t/day estimated with GöteborgHusum: 54 t/day estimated with GöteborgEemshaven: 54 t/day estimated with GöteborgHull: 53 t/day estimated with GöteborgSkhira: 52 t/day estimated with GöteborgTynemouth: 50 t/day estimated with GöteborgFreeport (US-FL): 50 t/day estimated with GöteborgMarsaxlokk: 49 t/day estimated with GöteborgSarroch Oil Terminal: 49 t/day estimated with GöteborgBrest: 49 t/day estimated with GöteborgSetubal: 49 t/day estimated with GöteborgPrimorsk: 48 t/day estimated with GöteborgCartagena: 48 t/day estimated with GöteborgRanders: 47 t/day estimated with GöteborgLubeck-Travemunde: 47 t/day estimated with GöteborgLandskrona: 47 t/day estimated with GöteborgReykjavík: 45 t/day estimated with GöteborgPorsgrunn: 44 t/day estimated with GöteborgTallinn: 43 t/day estimated with GöteborgPort Elizabeth: 43 t/day estimated with GöteborgLivorno: 41 t/day estimated with GöteborgMilazzo: 40 t/day estimated with GöteborgTarragona: 40 t/day estimated with GöteborgGulei: 40 t/day estimated with GöteborgDundee: 40 t/day estimated with GöteborgLimetree Bay: 40 t/day estimated with GöteborgBordeaux: 39 t/day estimated with GöteborgNordenham: 39 t/day estimated with GöteborgYanbu (King Fahd Port): 38 t/day estimated with GöteborgButinge Oil Terminal: 37 t/day estimated with GöteborgSwinoujscie: 36 t/day estimated with GöteborgKårstø: 36 t/day estimated with GöteborgKiel: 36 t/day estimated with GöteborgBurgas: 36 t/day estimated with GöteborgFalkenberg: 35 t/day estimated with GöteborgJeddah: 35 t/day estimated with GöteborgSete: 35 t/day estimated with GöteborgPaldiski: 35 t/day estimated with GöteborgNew Orleans: 34 t/day estimated with GöteborgLa Coruna: 34 t/day estimated with GöteborgGravesend: 34 t/day estimated with GöteborgCherry Point: 33 t/day estimated with GöteborgEleusis: 33 t/day estimated with GöteborgLondonderry: 31 t/day estimated with GöteborgTangier-Mediterranean: 31 t/day estimated with GöteborgHalifax: 30 t/day estimated with GöteborgAugusta: 29 t/day estimated with GöteborgAlexandria: 29 t/day estimated with GöteborgShanghai (Yangshan): 27 t/day estimated with GöteborgCork: 27 t/day estimated with GöteborgOranjestad: 26 t/day estimated with GöteborgColon: 25 t/day estimated with GöteborgSão Sebastião: 24 t/day estimated with GöteborgGöteborg
click to enable scroll zoom · drag to pan

Full footprint: all 347 connections of Göteborg aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.BremerhavenGermany2.3 days between calls
  2. 2.RotterdamThe Netherlands3.2 days between calls
  3. 3.MongstadNorway2.9 days between calls
  4. 4.BrofjordenSweden1.6 days between calls
  5. 5.SturaNorway4.9 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.AarhusDenmark0.6 days between calls
  2. 2.RotterdamThe Netherlands4.5 days between calls
  3. 3.AntwerpBelgium2.7 days between calls
  4. 4.BrofjordenSweden1.7 days between calls
  5. 5.MongstadNorway4.2 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)