Port profile · Maritime Radar

Port of Gijón daily activity

Gijón handled an estimated average of 15 kt a day in the week ending 25 September 2026 (-58.5% year on year), with an average of 2 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Spain · LOCODE ESGIJ · Main cargo sectors: Mineral Products, Vegetable Products, Chemical & Allied Industries

Data up to · 25 September 2026

7-day average · Estimated total volume

15 kt

28-day average

21 kt

Vs 28-day average

-25.1%

Year on year (same week)

-58.5%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container142.5 kt18 kt
Dry bulk22467 kt28 kt
General cargo214.0 kt41 kt
Ro-Ro00 t0 t
Tanker415 kt752 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Port Cartier: 5,920 t/day estimated with GijonPort CartierDunkirk: 5,857 t/day estimated with GijonDunkirkBilbao: 4,297 t/day estimated with GijonBilbaoItaqui: 4,260 t/day estimated with GijonItaquiHay Point: 3,474 t/day estimated with GijonHay PointLas Palmas (de Gran Canaria): 3,376 t/day estimated with GijonLas Palmas (de Gran Canaria)Rotterdam: 2,964 t/day estimated with GijonRotterdamPuerto Nuevo: 2,779 t/day estimated with GijonPuerto NuevoVigo: 2,310 t/day estimated with GijonVigoUst-Luga: 1,588 t/day estimated with GijonUst-LugaGdansk: 1,306 t/day estimated with GijonGdanskLa Coruna: 1,246 t/day estimated with GijonLa CorunaTubarao: 1,224 t/day estimated with GijonTubaraoHamburg: 1,056 t/day estimated with GijonHamburgNorfolk: 1,048 t/day estimated with GijonNorfolkFos: 972 t/day estimated with GijonFosGhent: 970 t/day estimated with GijonGhentSines: 864 t/day estimated with GijonSinesAlgeciras: 830 t/day estimated with GijonAlgecirasBuchanan: 779 t/day estimated with GijonBuchananNewport News: 765 t/day estimated with GijonNewport NewsJorf Lasfar: 750 t/day estimated with GijonJorf LasfarMobile: 732 t/day estimated with GijonMobilePuerto Bolivar: 732 t/day estimated with GijonPuerto BolivarSzczecin: 664 t/day estimated with GijonSzczecinLeixoes: 662 t/day estimated with GijonLeixoesNouadhibou: 633 t/day estimated with GijonNouadhibouAntwerp: 629 t/day estimated with GijonAntwerpAbbot Point: 602 t/day estimated with GijonAbbot PointDublin: 557 t/day estimated with GijonDublinSouth Louisiana: 530 t/day estimated with GijonSouth LouisianaRiga: 508 t/day estimated with GijonRigaVillagarcia De Arosa: 502 t/day estimated with GijonVillagarcia De ArosaHuelva: 492 t/day estimated with GijonHuelvaLisboa: 470 t/day estimated with GijonLisboaLondon: 467 t/day estimated with GijonLondonWilhelmshaven: 451 t/day estimated with GijonWilhelmshavenRichards Bay: 440 t/day estimated with GijonRichards BayLa Pallice: 426 t/day estimated with GijonLa PalliceGladstone: 400 t/day estimated with GijonGladstonePorto de Itaguai: 385 t/day estimated with GijonPorto de ItaguaiPort Nador: 377 t/day estimated with GijonPort NadorVlissingen: 369 t/day estimated with GijonVlissingenBaltimore: 354 t/day estimated with GijonBaltimoreAmsterdam: 329 t/day estimated with GijonAmsterdamTaranto: 325 t/day estimated with GijonTarantoCasablanca: 298 t/day estimated with GijonCasablancaQuebec: 286 t/day estimated with GijonQuebecVysotsk: 280 t/day estimated with GijonVysotskBrownsville (US-PA): 269 t/day estimated with GijonBrownsville (US-PA)Sept Iles: 265 t/day estimated with GijonSept IlesGdynia: 263 t/day estimated with GijonGdyniaPivdennyi: 253 t/day estimated with GijonPivdennyiTerneuzen: 238 t/day estimated with GijonTerneuzenSaldanha Bay: 230 t/day estimated with GijonSaldanha BayLe Havre: 225 t/day estimated with GijonLe HavreBajo Grande: 206 t/day estimated with GijonBajo GrandeCartagena: 201 t/day estimated with GijonCartagenaVentspils: 192 t/day estimated with GijonVentspilsPecem: 185 t/day estimated with GijonPecemSwinoujscie: 178 t/day estimated with GijonBelfast: 178 t/day estimated with GijonTilbury: 172 t/day estimated with GijonMurmansk: 172 t/day estimated with GijonKlaipeda: 171 t/day estimated with GijonWaterford: 169 t/day estimated with GijonYakacik: 168 t/day estimated with GijonCork: 167 t/day estimated with GijonSanta Cruz De Tenerife: 166 t/day estimated with GijonZeebrugge: 164 t/day estimated with GijonMontoir: 163 t/day estimated with GijonCorpus Christi: 161 t/day estimated with GijonSantander: 160 t/day estimated with GijonNew Orleans: 156 t/day estimated with GijonAveiro: 154 t/day estimated with GijonNemrut Bay: 148 t/day estimated with GijonIJmuiden: 146 t/day estimated with GijonSagunto: 144 t/day estimated with GijonTaman: 143 t/day estimated with GijonBayonne: 138 t/day estimated with GijonLa Baie (Port Alfred): 135 t/day estimated with GijonMarcus Hook: 133 t/day estimated with GijonNewcastle: 133 t/day estimated with GijonSafi: 122 t/day estimated with GijonIstanbul: 120 t/day estimated with GijonNarvik: 117 t/day estimated with GijonImmingham: 115 t/day estimated with GijonSanta Marta: 110 t/day estimated with GijonLiverpool: 110 t/day estimated with GijonPasajes: 110 t/day estimated with GijonDiliskelesi: 108 t/day estimated with GijonRouen: 108 t/day estimated with GijonMäntyluoto: 106 t/day estimated with GijonAviles: 105 t/day estimated with GijonTeesport: 103 t/day estimated with GijonMotril: 100 t/day estimated with GijonSunderland: 99 t/day estimated with GijonHull: 99 t/day estimated with GijonHouston (US-TX): 99 t/day estimated with GijonBarcelona: 95 t/day estimated with GijonSaint Petersburg: 94 t/day estimated with GijonRizhao: 88 t/day estimated with GijonBarranquilla: 88 t/day estimated with GijonGarston: 87 t/day estimated with GijonOita: 87 t/day estimated with GijonCagliari: 87 t/day estimated with GijonRaahe: 83 t/day estimated with GijonStade: 83 t/day estimated with GijonSt Nazaire: 82 t/day estimated with GijonZhouliwang: 79 t/day estimated with GijonTianjin Xin Gang: 79 t/day estimated with GijonZhoushan: 78 t/day estimated with GijonThunder Bay: 74 t/day estimated with GijonFoynes: 74 t/day estimated with GijonCeuta: 74 t/day estimated with GijonManila: 74 t/day estimated with GijonTaichung: 72 t/day estimated with GijonPalma de Mallorca: 72 t/day estimated with GijonCadiz: 71 t/day estimated with GijonFigueira Da Foz: 70 t/day estimated with GijonSetubal: 70 t/day estimated with GijonFerrol: 68 t/day estimated with GijonTangier-Mediterranean: 66 t/day estimated with GijonDahej: 64 t/day estimated with GijonOxelösund: 63 t/day estimated with GijonConstantza: 61 t/day estimated with GijonKawasaki: 60 t/day estimated with GijonChornomorsk: 59 t/day estimated with GijonGlasgow: 58 t/day estimated with GijonHadera: 55 t/day estimated with GijonLiepaja: 55 t/day estimated with GijonPort Kembla: 55 t/day estimated with GijonCarboneras: 55 t/day estimated with GijonBrest: 54 t/day estimated with GijonNueva Palmira: 52 t/day estimated with GijonCherbourg: 52 t/day estimated with GijonKrishnapatnam Port: 52 t/day estimated with GijonMaputo: 51 t/day estimated with GijonDurban: 51 t/day estimated with GijonDundee: 49 t/day estimated with GijonDamietta: 47 t/day estimated with GijonLondonderry: 47 t/day estimated with GijonBrake: 47 t/day estimated with GijonTaboguilla: 47 t/day estimated with GijonPorto Di Lido-Venezia: 46 t/day estimated with GijonLes Sables D' Olonne: 45 t/day estimated with GijonKashima-Ibaraki: 45 t/day estimated with GijonTarragona: 45 t/day estimated with GijonNewport: 45 t/day estimated with GijonGebze: 44 t/day estimated with GijonAgadir: 42 t/day estimated with GijonBotas Natural Gas Terminal: 42 t/day estimated with GijonKokkola: 40 t/day estimated with GijonEl Grao: 40 t/day estimated with GijonBurgas: 40 t/day estimated with GijonParadip: 39 t/day estimated with GijonMalaga: 39 t/day estimated with GijonAltamira: 39 t/day estimated with GijonEl Sokhna: 38 t/day estimated with GijonGravesend: 38 t/day estimated with GijonPort Jerome: 37 t/day estimated with GijonOran: 37 t/day estimated with GijonPorto Grande: 36 t/day estimated with GijonMoerdijk: 36 t/day estimated with GijonBristol: 35 t/day estimated with GijonRostock: 34 t/day estimated with GijonShanghai: 34 t/day estimated with GijonBayuquan: 33 t/day estimated with GijonEemshaven: 33 t/day estimated with GijonAlicante: 32 t/day estimated with GijonBrunsbuettel: 32 t/day estimated with GijonSeville: 30 t/day estimated with GijonSan Ciprian: 30 t/day estimated with GijonAlexandria: 29 t/day estimated with GijonMohammedia: 29 t/day estimated with GijonNapoli: 29 t/day estimated with GijonBremen: 29 t/day estimated with GijonNew Mangalore: 28 t/day estimated with GijonAbidjan: 27 t/day estimated with GijonFukuyama: 26 t/day estimated with GijonBizerte: 26 t/day estimated with GijonDongjiakou: 26 t/day estimated with GijonPort of Virginia: 26 t/day estimated with GijonDjen Djen: 26 t/day estimated with GijonRavenna: 26 t/day estimated with GijonNordenham: 26 t/day estimated with GijonToros Gubre: 25 t/day estimated with GijonAlmeria: 25 t/day estimated with GijonSouthampton: 25 t/day estimated with GijonLivorno: 24 t/day estimated with GijonManzanillo: 24 t/day estimated with GijonGarrucha: 24 t/day estimated with GijonTangshan (Jingtang): 24 t/day estimated with GijonVisakhapatnam: 23 t/day estimated with GijonFredericia: 23 t/day estimated with GijonDrogheda: 23 t/day estimated with GijonPort-De-Bouc: 23 t/day estimated with GijonFujairah: 23 t/day estimated with GijonGaeta: 22 t/day estimated with GijonCoatzacoalcos: 22 t/day estimated with GijonGijon
click to enable scroll zoom · drag to pan

Full footprint: all 420 connections of Gijon aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Port CartierCanada13.2 days between calls
  2. 2.ItaquiBrazil16.2 days between calls
  3. 3.Hay PointAustralia49.8 days between calls
  4. 4.Las Palmas (de Gran Canaria)Spain6.5 days between calls
  5. 5.Puerto NuevoColombia18.6 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.DunkirkFrance5.5 days between calls
  2. 2.RotterdamThe Netherlands7.2 days between calls
  3. 3.BilbaoSpain0.8 days between calls
  4. 4.VigoSpain1.2 days between calls
  5. 5.GdanskPoland9.7 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)