Port profile · Maritime Radar

Port of Brake daily activity

Brake handled an estimated average of 21 kt a day in the week ending 25 September 2026 (+205.8% year on year), with an average of 3 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Germany · LOCODE DEBKE · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

21 kt

28-day average

18 kt

Vs 28-day average

+16.5%

Year on year (same week)

+205.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container136.8 kt4.3 kt
Dry bulk17331 kt26 kt
General cargo5869 kt57 kt
Ro-Ro10 t424 t
Tanker818 kt2.3 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Rotterdam: 1,594 t/day estimated with BrakeRotterdamNordenham: 1,501 t/day estimated with BrakeNordenhamLas Palmas (de Gran Canaria): 948 t/day estimated with BrakeLas Palmas (de Gran Canaria)Vlissingen: 926 t/day estimated with BrakeVlissingenBremerhaven: 871 t/day estimated with BrakeBremerhavenNew Haven: 830 t/day estimated with BrakeNew HavenParanaguá: 784 t/day estimated with BrakeParanaguáAmsterdam: 599 t/day estimated with BrakeAmsterdamBremen: 596 t/day estimated with BrakeBremenHamburg: 560 t/day estimated with BrakeHamburgCanaveral Harbor: 504 t/day estimated with BrakeCanaveral HarborAratu: 474 t/day estimated with BrakeAratuUst-Luga: 381 t/day estimated with BrakeUst-LugaNew Orleans: 343 t/day estimated with BrakeNew OrleansAntwerp: 333 t/day estimated with BrakeAntwerpWilmington, DE: 298 t/day estimated with BrakeWilmington, DEItaqui: 297 t/day estimated with BrakeItaquiChornomorsk: 284 t/day estimated with BrakeChornomorskTampa Port: 284 t/day estimated with BrakeTampa PortGdansk: 276 t/day estimated with BrakeGdanskWilmington, NC: 272 t/day estimated with BrakeWilmington, NCBaltimore: 261 t/day estimated with BrakeBaltimoreVarberg: 250 t/day estimated with BrakeVarbergProvidence: 244 t/day estimated with BrakeProvidenceLiverpool: 231 t/day estimated with BrakeLiverpoolMontoir: 230 t/day estimated with BrakeMontoirWismar: 215 t/day estimated with BrakeWismarSantos: 210 t/day estimated with BrakeSantosTynemouth: 209 t/day estimated with BrakeTynemouthOdessa: 209 t/day estimated with BrakeOdessaLisboa: 208 t/day estimated with BrakeLisboaGhent: 177 t/day estimated with BrakeGhentBrunsbuettel: 153 t/day estimated with BrakeBrunsbuettelIJmuiden: 150 t/day estimated with BrakeIJmuidenLiepaja: 146 t/day estimated with BrakeLiepajaDumai: 144 t/day estimated with BrakeDumaiMurmansk: 135 t/day estimated with BrakeMurmanskHuelva: 123 t/day estimated with BrakeHuelvaPivdennyi: 121 t/day estimated with BrakePivdennyiKarlshamn: 118 t/day estimated with BrakeKarlshamnFlorø: 116 t/day estimated with BrakeFlorøBrest: 116 t/day estimated with BrakeBrestOlvia: 115 t/day estimated with BrakeOlviaIzhevskoye: 107 t/day estimated with BrakeIzhevskoyePorsgrunn: 104 t/day estimated with BrakePorsgrunnKandla: 102 t/day estimated with BrakeKandlaConstantza: 95 t/day estimated with BrakeConstantzaSaint Petersburg: 94 t/day estimated with BrakeSaint PetersburgFerrol: 92 t/day estimated with BrakeFerrolKotka: 90 t/day estimated with BrakeKotkaRiga: 89 t/day estimated with BrakeRigaKristiansund: 88 t/day estimated with BrakeKristiansundAarhus: 88 t/day estimated with BrakeAarhusIstanbul: 87 t/day estimated with BrakeIstanbulHouston (US-TX): 86 t/day estimated with BrakeHouston (US-TX)Klaipeda: 85 t/day estimated with BrakeKlaipedaBilbao: 84 t/day estimated with BrakeBilbaoStavanger: 81 t/day estimated with BrakeStavangerPorto de Itaguai: 78 t/day estimated with BrakePorto de ItaguaiRouen: 75 t/day estimated with BrakeRouenEmden: 75 t/day estimated with BrakeHamad Port: 73 t/day estimated with BrakeAveiro: 71 t/day estimated with BrakeLondon: 70 t/day estimated with BrakeRavenna: 67 t/day estimated with BrakeNarvik: 66 t/day estimated with BrakePecem: 66 t/day estimated with BrakeLa Pallice: 64 t/day estimated with BrakeNewport News: 62 t/day estimated with BrakeLa Coruna: 62 t/day estimated with BrakePanjang: 58 t/day estimated with BrakeTarragona: 56 t/day estimated with BrakeDunkirk: 55 t/day estimated with BrakeRostock: 54 t/day estimated with BrakePuerto Cabello: 54 t/day estimated with BrakeRauma: 53 t/day estimated with BrakeTerneuzen: 51 t/day estimated with BrakeStora Jatterson: 50 t/day estimated with BrakeVysotsk: 49 t/day estimated with BrakeImmingham: 47 t/day estimated with BrakeFigueira Da Foz: 47 t/day estimated with BrakeMarkenes: 47 t/day estimated with BrakeGijon: 47 t/day estimated with BrakeKolding: 46 t/day estimated with BrakeMo i Rana: 46 t/day estimated with BrakeKokkola: 46 t/day estimated with BrakeFortaleza (Mucuripe): 44 t/day estimated with BrakeSzczecin: 43 t/day estimated with BrakeZeebrugge: 41 t/day estimated with BrakeJorf Lasfar: 38 t/day estimated with BrakeWilhelmshaven: 37 t/day estimated with BrakeBelfast: 37 t/day estimated with BrakeAlgeciras: 36 t/day estimated with BrakeLake Charles: 35 t/day estimated with BrakeHelsingborg: 35 t/day estimated with BrakeHull: 34 t/day estimated with BrakeLorient: 33 t/day estimated with BrakeSavannah: 31 t/day estimated with BrakeSkoldvik: 31 t/day estimated with BrakePort De Aracaju: 31 t/day estimated with BrakeTianjin Xin Gang: 30 t/day estimated with BrakeMäntyluoto: 30 t/day estimated with BrakeEsbjerg: 29 t/day estimated with BrakeBalboa: 29 t/day estimated with BrakePuerto Barrios: 28 t/day estimated with BrakeEemshaven: 28 t/day estimated with BrakeStade: 28 t/day estimated with BrakeFredrikstad: 28 t/day estimated with BrakeSwinoujscie: 27 t/day estimated with BrakeOita: 27 t/day estimated with BrakeSete: 27 t/day estimated with BrakeSanta Cruz De Tenerife: 27 t/day estimated with BrakeGeelong: 26 t/day estimated with BrakeBunbury: 26 t/day estimated with BrakeSillamae: 26 t/day estimated with BrakeLondonderry: 26 t/day estimated with BrakeHelsinki: 25 t/day estimated with BrakeVila Do Conde: 25 t/day estimated with BrakeSouth Louisiana: 25 t/day estimated with BrakeNorfolk: 24 t/day estimated with BrakeGravesend: 24 t/day estimated with BrakeCasablanca: 24 t/day estimated with BrakeSagunto: 24 t/day estimated with BrakeRio Grande: 24 t/day estimated with BrakeGdynia: 23 t/day estimated with BrakeFredrikshamn: 23 t/day estimated with BrakeMarin: 22 t/day estimated with BrakeSanta Marta: 22 t/day estimated with BrakeSantander: 22 t/day estimated with BrakePiteå: 22 t/day estimated with BrakePaldiski: 22 t/day estimated with BrakeLivorno: 22 t/day estimated with BrakeBristol: 22 t/day estimated with BrakePasajes: 22 t/day estimated with BrakeBayonne: 22 t/day estimated with BrakeDafeng: 22 t/day estimated with BrakeCork: 22 t/day estimated with BrakeLeith: 21 t/day estimated with BrakeFuglafjordur: 20 t/day estimated with BrakePorto do Acu: 20 t/day estimated with BrakePhiladelphia: 20 t/day estimated with BrakeVentspils: 20 t/day estimated with BrakeVaasa: 19 t/day estimated with BrakeBurgas: 19 t/day estimated with BrakePort Cartier: 18 t/day estimated with BrakeSetubal: 18 t/day estimated with BrakeOxelösund: 18 t/day estimated with BrakeMuuga-Port of Tallinn: 18 t/day estimated with BrakeHusum: 18 t/day estimated with BrakeHusum: 17 t/day estimated with BrakeWaterford: 17 t/day estimated with BrakeDouala: 17 t/day estimated with BrakeUusikaupunki: 17 t/day estimated with BrakePortocel: 17 t/day estimated with BrakeCoronel: 17 t/day estimated with BrakeFangcheng: 16 t/day estimated with BrakeGresik: 16 t/day estimated with BrakeTuticorin: 16 t/day estimated with BrakeHamilton: 16 t/day estimated with BrakeDelfzijl: 16 t/day estimated with BrakeArzew: 15 t/day estimated with BrakeSingapore: 15 t/day estimated with BrakeJoensuu: 15 t/day estimated with BrakeTurku: 15 t/day estimated with BrakeMobile: 15 t/day estimated with BrakeVeracruz: 15 t/day estimated with BrakeDiliskelesi: 14 t/day estimated with BrakeLuanda: 14 t/day estimated with BrakeHai Phong: 14 t/day estimated with BrakeKemi: 14 t/day estimated with BrakePortland Harbour: 14 t/day estimated with BrakeLubeck-Travemunde: 14 t/day estimated with BrakeLe Havre: 13 t/day estimated with BrakeFoynes: 13 t/day estimated with BrakeKøge: 13 t/day estimated with BrakeThunder Bay: 13 t/day estimated with BrakeMundra: 13 t/day estimated with BrakeYakacik: 13 t/day estimated with BrakePunta Pereira: 12 t/day estimated with BrakeDurban: 12 t/day estimated with BrakeKaskinen: 12 t/day estimated with BrakeNewport: 12 t/day estimated with BrakeNapoli: 12 t/day estimated with BrakeGabes: 12 t/day estimated with BrakeFort De France: 12 t/day estimated with BrakeShanghai: 12 t/day estimated with BrakeIzmir: 12 t/day estimated with BrakeWarren Point: 12 t/day estimated with BrakeSeville: 11 t/day estimated with BrakeÅbenrå: 11 t/day estimated with BrakeMoerdijk: 11 t/day estimated with BrakeHarlingen: 11 t/day estimated with BrakeAbidjan: 11 t/day estimated with BrakeKingston: 11 t/day estimated with BrakeCuxhaven: 11 t/day estimated with BrakeSan Juan: 11 t/day estimated with BrakePort of Spain: 11 t/day estimated with BrakeTilbury: 11 t/day estimated with BrakeVästerås: 11 t/day estimated with BrakeJebel Ali: 11 t/day estimated with BrakeBrake
click to enable scroll zoom · drag to pan

Full footprint: all 385 connections of Brake aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.NordenhamGermany1.8 days between calls
  2. 2.RotterdamThe Netherlands2.2 days between calls
  3. 3.Las Palmas (de Gran Canaria)Spain10.6 days between calls
  4. 4.VlissingenThe Netherlands2.0 days between calls
  5. 5.ParanaguáBrazil22.8 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.New HavenUnited States15.1 days between calls
  2. 2.Canaveral HarborUnited States17.6 days between calls
  3. 3.HamburgGermany1.7 days between calls
  4. 4.BremenGermany1.9 days between calls
  5. 5.Ust-LugaRussian Federation8.2 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)