Port profile · Maritime Radar

Port of Terneuzen daily activity

Terneuzen handled an estimated average of 65 kt a day in the week ending 25 September 2026 (+32.6% year on year), with an average of 16 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
The Netherlands · LOCODE NLTNZ · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

65 kt

28-day average

59 kt

Vs 28-day average

+10.4%

Year on year (same week)

+32.6%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container85235 kt393 kt
Dry bulk11127 kt18 kt
General cargo10399 kt64 kt
Ro-Ro3522 kt37 kt
Tanker199421 kt234 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Antwerp: 33,767 t/day estimated with TerneuzenAntwerpGhent: 23,716 t/day estimated with TerneuzenGhentRotterdam: 9,911 t/day estimated with TerneuzenRotterdamHamburg: 6,633 t/day estimated with TerneuzenHamburgVlissingen: 3,463 t/day estimated with TerneuzenVlissingenStade: 2,404 t/day estimated with TerneuzenStadeGöteborg: 2,266 t/day estimated with TerneuzenGöteborgBremerhaven: 2,205 t/day estimated with TerneuzenBremerhavenAmsterdam: 1,943 t/day estimated with TerneuzenAmsterdamHouston (US-TX): 1,841 t/day estimated with TerneuzenHouston (US-TX)Marcus Hook: 1,803 t/day estimated with TerneuzenMarcus HookLondon Gateway: 1,669 t/day estimated with TerneuzenLondon GatewayPort Cartier: 1,579 t/day estimated with TerneuzenPort CartierLe Havre: 1,508 t/day estimated with TerneuzenLe HavreKårstø: 1,237 t/day estimated with TerneuzenKårstøTarragona: 1,210 t/day estimated with TerneuzenTarragonaUst-Luga: 1,071 t/day estimated with TerneuzenUst-LugaBeaumont: 1,049 t/day estimated with TerneuzenBeaumontImmingham: 1,028 t/day estimated with TerneuzenImminghamFelixstowe: 1,009 t/day estimated with TerneuzenFelixstoweMongstad: 925 t/day estimated with TerneuzenMongstadTorneå: 883 t/day estimated with TerneuzenTorneåDunkirk: 828 t/day estimated with TerneuzenDunkirkMoerdijk: 812 t/day estimated with TerneuzenMoerdijkArzew: 716 t/day estimated with TerneuzenArzewBilbao: 684 t/day estimated with TerneuzenBilbaoMurmansk: 682 t/day estimated with TerneuzenMurmanskDerince (Izmit-Kocaeli): 672 t/day estimated with TerneuzenDerince (Izmit-Kocaeli)Southampton: 649 t/day estimated with TerneuzenSouthamptonItaqui: 638 t/day estimated with TerneuzenItaquiSines: 617 t/day estimated with TerneuzenSinesManzanillo: 604 t/day estimated with TerneuzenManzanilloPorsgrunn: 576 t/day estimated with TerneuzenPorsgrunnSaint Petersburg: 539 t/day estimated with TerneuzenSaint PetersburgZeebrugge: 506 t/day estimated with TerneuzenZeebruggeAlgeciras: 475 t/day estimated with TerneuzenAlgecirasLas Palmas (de Gran Canaria): 436 t/day estimated with TerneuzenLas Palmas (de Gran Canaria)Port Jerome: 435 t/day estimated with TerneuzenPort JeromeSkikda (Port Methanier): 426 t/day estimated with TerneuzenSkikda (Port Methanier)Tubarao: 418 t/day estimated with TerneuzenTubaraoNew York-New Jersey: 416 t/day estimated with TerneuzenNew York-New JerseyKotka: 399 t/day estimated with TerneuzenKotkaTeesport: 395 t/day estimated with TerneuzenTeesportMontoir: 376 t/day estimated with TerneuzenMontoirGrangemouth: 368 t/day estimated with TerneuzenGrangemouthSept Iles: 351 t/day estimated with TerneuzenSept IlesKlaipeda: 350 t/day estimated with TerneuzenKlaipedaHull: 342 t/day estimated with TerneuzenHullTilbury: 316 t/day estimated with TerneuzenTilburyPort Arthur: 288 t/day estimated with TerneuzenPort ArthurSafi: 284 t/day estimated with TerneuzenSafiRouen: 283 t/day estimated with TerneuzenRouenNew Orleans: 272 t/day estimated with TerneuzenNew OrleansRiga: 270 t/day estimated with TerneuzenRigaNorfolk: 270 t/day estimated with TerneuzenNorfolkBrunsbuettel: 264 t/day estimated with TerneuzenBrunsbuettelFreeport (US-FL): 263 t/day estimated with TerneuzenFreeport (US-FL)Huelva: 263 t/day estimated with TerneuzenHuelvaMohammedia: 262 t/day estimated with TerneuzenMohammediaSplit: 259 t/day estimated with TerneuzenSplitGdansk: 248 t/day estimated with TerneuzenPoint Lisas: 240 t/day estimated with TerneuzenNemrut Bay: 240 t/day estimated with TerneuzenGijon: 238 t/day estimated with TerneuzenGdynia: 235 t/day estimated with TerneuzenSouth Louisiana: 231 t/day estimated with TerneuzenSkoldvik: 225 t/day estimated with TerneuzenPuerto Moin: 224 t/day estimated with TerneuzenFawley: 223 t/day estimated with TerneuzenYakacik: 217 t/day estimated with TerneuzenTangier-Mediterranean: 215 t/day estimated with TerneuzenMontreal: 207 t/day estimated with TerneuzenCharleston: 200 t/day estimated with TerneuzenMilford Haven: 198 t/day estimated with TerneuzenStenungsund: 196 t/day estimated with TerneuzenPort of Virginia: 194 t/day estimated with TerneuzenSanta Marta: 187 t/day estimated with TerneuzenWilhelmshaven: 181 t/day estimated with TerneuzenKalundborg: 178 t/day estimated with TerneuzenLondon: 173 t/day estimated with TerneuzenLos Angeles-Long Beach: 169 t/day estimated with TerneuzenSantander: 167 t/day estimated with TerneuzenSingapore: 166 t/day estimated with TerneuzenBandirma: 159 t/day estimated with TerneuzenAarhus: 158 t/day estimated with TerneuzenPivdennyi: 156 t/day estimated with TerneuzenLiverpool: 156 t/day estimated with TerneuzenPort-De-Bouc: 152 t/day estimated with TerneuzenDublin: 151 t/day estimated with TerneuzenNouadhibou: 149 t/day estimated with TerneuzenIJmuiden: 148 t/day estimated with TerneuzenVysotsk: 141 t/day estimated with TerneuzenFredericia: 140 t/day estimated with TerneuzenLa Coruna: 139 t/day estimated with TerneuzenHelsinki: 137 t/day estimated with TerneuzenGarston: 136 t/day estimated with TerneuzenNarvik: 134 t/day estimated with TerneuzenLa Pallice: 133 t/day estimated with TerneuzenWilmington, NC: 133 t/day estimated with TerneuzenCorpus Christi: 133 t/day estimated with TerneuzenRavenna: 128 t/day estimated with TerneuzenLeixoes: 124 t/day estimated with TerneuzenTexas City: 121 t/day estimated with TerneuzenVentspils: 116 t/day estimated with TerneuzenMalmö: 113 t/day estimated with TerneuzenSabetta: 113 t/day estimated with TerneuzenJacksonville: 112 t/day estimated with TerneuzenBristol: 112 t/day estimated with TerneuzenFos: 110 t/day estimated with TerneuzenSzczecin: 109 t/day estimated with TerneuzenProvidence: 108 t/day estimated with TerneuzenChornomorsk: 107 t/day estimated with TerneuzenSavannah: 105 t/day estimated with TerneuzenBremen: 104 t/day estimated with TerneuzenBarcelona: 103 t/day estimated with TerneuzenRostock: 102 t/day estimated with TerneuzenLisboa: 102 t/day estimated with TerneuzenAugusta: 102 t/day estimated with TerneuzenKokkola: 100 t/day estimated with TerneuzenRauma: 97 t/day estimated with TerneuzenConstantza: 96 t/day estimated with TerneuzenFredrikshamn: 96 t/day estimated with TerneuzenPorto Di Lido-Venezia: 92 t/day estimated with TerneuzenQuebec: 91 t/day estimated with TerneuzenSanta Cruz De Tenerife: 91 t/day estimated with TerneuzenEsperance: 90 t/day estimated with TerneuzenCeuta: 90 t/day estimated with TerneuzenGenova: 85 t/day estimated with TerneuzenAalborg: 85 t/day estimated with TerneuzenCartagena: 85 t/day estimated with TerneuzenCaucedo: 84 t/day estimated with TerneuzenJorf Lasfar: 82 t/day estimated with TerneuzenSillamae: 82 t/day estimated with TerneuzenMilazzo: 81 t/day estimated with TerneuzenValencia: 80 t/day estimated with TerneuzenKaliningrad: 79 t/day estimated with TerneuzenJubail: 79 t/day estimated with TerneuzenAltamira: 79 t/day estimated with TerneuzenBordeaux: 79 t/day estimated with TerneuzenBelfast: 78 t/day estimated with TerneuzenBoston: 76 t/day estimated with TerneuzenKing Abdullah Port: 73 t/day estimated with TerneuzenAveiro: 72 t/day estimated with TerneuzenSarroch Oil Terminal: 72 t/day estimated with TerneuzenBaltimore: 72 t/day estimated with TerneuzenNovorossiysk: 71 t/day estimated with TerneuzenBrofjorden: 71 t/day estimated with TerneuzenHammerfest: 70 t/day estimated with TerneuzenAviles: 69 t/day estimated with TerneuzenJebel Ali: 68 t/day estimated with TerneuzenPorto Grande: 66 t/day estimated with TerneuzenBuchanan: 64 t/day estimated with TerneuzenMobile: 64 t/day estimated with TerneuzenNorrköping: 63 t/day estimated with TerneuzenIstanbul: 61 t/day estimated with TerneuzenYanbu (King Fahd Port): 61 t/day estimated with TerneuzenHanko: 60 t/day estimated with TerneuzenHaifa: 60 t/day estimated with TerneuzenGävle: 59 t/day estimated with TerneuzenRio Grande: 59 t/day estimated with TerneuzenSetubal: 59 t/day estimated with TerneuzenMuuga-Port of Tallinn: 59 t/day estimated with TerneuzenPort Kembla: 59 t/day estimated with TerneuzenIncheon: 57 t/day estimated with TerneuzenBrest: 56 t/day estimated with TerneuzenKristiansund: 56 t/day estimated with TerneuzenHelsingborg: 56 t/day estimated with TerneuzenLa Baie (Port Alfred): 55 t/day estimated with TerneuzenCasablanca: 55 t/day estimated with TerneuzenNaantali: 55 t/day estimated with TerneuzenHay Point: 55 t/day estimated with TerneuzenLiepaja: 54 t/day estimated with TerneuzenRaahe: 54 t/day estimated with TerneuzenAlexandria: 54 t/day estimated with TerneuzenBrake: 51 t/day estimated with TerneuzenMedway: 50 t/day estimated with TerneuzenWilmington, DE: 49 t/day estimated with TerneuzenToros Gubre: 49 t/day estimated with TerneuzenDelfzijl: 49 t/day estimated with TerneuzenDrogheda: 49 t/day estimated with TerneuzenPrimorsk: 49 t/day estimated with TerneuzenEl Grao: 48 t/day estimated with TerneuzenCork: 48 t/day estimated with TerneuzenMo i Rana: 48 t/day estimated with TerneuzenGravesend: 47 t/day estimated with TerneuzenKøbenhavn: 47 t/day estimated with TerneuzenOulu: 46 t/day estimated with TerneuzenFujairah: 46 t/day estimated with TerneuzenKristiansand: 45 t/day estimated with TerneuzenFoynes: 45 t/day estimated with TerneuzenOostende: 45 t/day estimated with TerneuzenPort Everglades: 45 t/day estimated with TerneuzenAratu: 44 t/day estimated with TerneuzenSalaverry: 44 t/day estimated with TerneuzenLivorno: 44 t/day estimated with TerneuzenManzanillo: 43 t/day estimated with TerneuzenLagos: 43 t/day estimated with TerneuzenPort Klang: 43 t/day estimated with TerneuzenBarranquilla: 43 t/day estimated with TerneuzenEmden: 42 t/day estimated with TerneuzenTerneuzen
click to enable scroll zoom · drag to pan

Full footprint: all 540 connections of Terneuzen aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.RotterdamThe Netherlands2.4 days between calls
  2. 2.HamburgGermany2.1 days between calls
  3. 3.AntwerpBelgium2.9 days between calls
  4. 4.GhentBelgium3.9 days between calls
  5. 5.GöteborgSweden1.3 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.AntwerpBelgium2.4 days between calls
  2. 2.GhentBelgium1.5 days between calls
  3. 3.RotterdamThe Netherlands4.6 days between calls
  4. 4.StadeGermany2.1 days between calls
  5. 5.VlissingenThe Netherlands1.2 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)