Port profile · Maritime Radar

Port of Sanshandaocun daily activity

Sanshandaocun handled an estimated average of 22 kt a day in the week ending 25 September 2026 (-10.9% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
China · LOCODE CNSSD · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

22 kt

28-day average

11 kt

Vs 28-day average

+93.9%

Year on year (same week)

-10.9%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container00 t0 t
Dry bulk8188 kt48 kt
General cargo4168 t7.5 kt
Ro-Ro00 t0 t
Tanker359 kt15 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Weipa: 7,860 t/day estimated with SanshandaocunWeipaLongkou Gang: 3,156 t/day estimated with SanshandaocunLongkou GangNingbo: 2,103 t/day estimated with SanshandaocunNingboDongjiakou: 1,903 t/day estimated with SanshandaocunDongjiakouSingapore: 1,845 t/day estimated with SanshandaocunSingaporeShanghai: 1,509 t/day estimated with SanshandaocunShanghaiLanqiao Port: 1,499 t/day estimated with SanshandaocunLanqiao PortQingdao Port: 1,262 t/day estimated with SanshandaocunQingdao PortDalian: 1,198 t/day estimated with SanshandaocunDalianZhoushan: 1,141 t/day estimated with SanshandaocunZhoushanZhouliwang: 1,073 t/day estimated with SanshandaocunZhouliwangBayuquan: 1,049 t/day estimated with SanshandaocunBayuquanHuanghua: 1,012 t/day estimated with SanshandaocunHuanghuaCape Flattery: 811 t/day estimated with SanshandaocunCape FlatteryWeifang Port: 780 t/day estimated with SanshandaocunWeifang PortTianjin Xin Gang: 670 t/day estimated with SanshandaocunTianjin Xin GangYingkou: 667 t/day estimated with SanshandaocunYingkouZhanjiang: 628 t/day estimated with SanshandaocunZhanjiangShougang Jingtang: 497 t/day estimated with SanshandaocunShougang JingtangFremantle: 495 t/day estimated with SanshandaocunFremantleQinzhou: 348 t/day estimated with SanshandaocunQinzhouGaogang: 331 t/day estimated with SanshandaocunGaogangKikuma: 319 t/day estimated with SanshandaocunKikumaGuangzhou (Nansha): 310 t/day estimated with SanshandaocunGuangzhou (Nansha)Donghae: 308 t/day estimated with SanshandaocunDonghaeKandla: 286 t/day estimated with SanshandaocunKandlaGove: 286 t/day estimated with SanshandaocunGoveJiangyin: 286 t/day estimated with SanshandaocunJiangyinGourd Shanzui: 268 t/day estimated with SanshandaocunGourd ShanzuiManila: 252 t/day estimated with SanshandaocunManilaQiwei: 247 t/day estimated with SanshandaocunQiweiJinzhou: 221 t/day estimated with SanshandaocunJinzhouShanghai (Yangshan): 212 t/day estimated with SanshandaocunShanghai (Yangshan)Lianyungang: 205 t/day estimated with SanshandaocunLianyungangMejillones: 197 t/day estimated with SanshandaocunMejillonesGwangyang (Kwangyang): 196 t/day estimated with SanshandaocunGwangyang (Kwangyang)Harbor Yeweiju: 194 t/day estimated with SanshandaocunHarbor YeweijuVancouver: 187 t/day estimated with SanshandaocunVancouverTangshan (Jingtang): 180 t/day estimated with SanshandaocunTangshan (Jingtang)Geelong: 173 t/day estimated with SanshandaocunGeelongUlsan: 170 t/day estimated with SanshandaocunUlsanTaichung: 167 t/day estimated with SanshandaocunTaichungPengerang: 167 t/day estimated with SanshandaocunPengerangZhapu: 156 t/day estimated with SanshandaocunZhapuGladstone: 152 t/day estimated with SanshandaocunGladstonePyeongtaek: 143 t/day estimated with SanshandaocunPyeongtaekQinhuangdao: 132 t/day estimated with SanshandaocunQinhuangdaoUst-Luga: 130 t/day estimated with SanshandaocunUst-LugaFuzhou: 130 t/day estimated with SanshandaocunFuzhouTanjung Pelepas: 124 t/day estimated with SanshandaocunTanjung PelepasDaesan: 123 t/day estimated with SanshandaocunDaesanGeraldton: 120 t/day estimated with SanshandaocunGeraldtonIncheon: 118 t/day estimated with SanshandaocunIncheonXiamen: 116 t/day estimated with SanshandaocunXiamenTrieste: 112 t/day estimated with SanshandaocunTriesteKaohsiung: 111 t/day estimated with SanshandaocunKaohsiungFujairah: 111 t/day estimated with SanshandaocunFujairahGuangdong Yangjiang Port: 103 t/day estimated with SanshandaocunGuangdong Yangjiang PortHong Kong: 98 t/day estimated with SanshandaocunHong KongNantong: 96 t/day estimated with SanshandaocunNantongPrimorsk: 91 t/day estimated with SanshandaocunBarbor's Point: 89 t/day estimated with SanshandaocunVostochnyy: 89 t/day estimated with SanshandaocunBasuo: 87 t/day estimated with SanshandaocunGulei: 85 t/day estimated with SanshandaocunTaipei: 85 t/day estimated with SanshandaocunBrisbane: 82 t/day estimated with SanshandaocunYantai: 79 t/day estimated with SanshandaocunNiigata: 77 t/day estimated with SanshandaocunZhuhai: 76 t/day estimated with SanshandaocunAlgeciras: 74 t/day estimated with SanshandaocunChiba: 71 t/day estimated with SanshandaocunRizhao: 70 t/day estimated with SanshandaocunSuzhou (Taicang): 68 t/day estimated with SanshandaocunBatangas City: 67 t/day estimated with SanshandaocunDahej: 61 t/day estimated with SanshandaocunKuantan: 61 t/day estimated with SanshandaocunHuizhou: 60 t/day estimated with SanshandaocunXiuyu: 55 t/day estimated with SanshandaocunLuoyuan: 53 t/day estimated with SanshandaocunMumbai-Jawaharlal Nehru (Nhava Sheva): 51 t/day estimated with SanshandaocunPort Dickson: 50 t/day estimated with SanshandaocunGdansk: 50 t/day estimated with SanshandaocunShekou (Shenzhen): 50 t/day estimated with SanshandaocunSantos: 48 t/day estimated with SanshandaocunDurban: 47 t/day estimated with SanshandaocunHay Point: 46 t/day estimated with SanshandaocunAnacortes: 46 t/day estimated with SanshandaocunKarimun: 46 t/day estimated with SanshandaocunCherry Point: 46 t/day estimated with SanshandaocunLe Havre: 46 t/day estimated with SanshandaocunRas Tanura: 45 t/day estimated with SanshandaocunXiagong: 45 t/day estimated with SanshandaocunMatanzas: 45 t/day estimated with SanshandaocunHouston (US-TX): 45 t/day estimated with SanshandaocunSikka: 45 t/day estimated with SanshandaocunLos Angeles-Long Beach: 44 t/day estimated with SanshandaocunLivorno: 44 t/day estimated with SanshandaocunMelbourne: 44 t/day estimated with SanshandaocunLuanjiakou: 43 t/day estimated with SanshandaocunSekupang: 42 t/day estimated with SanshandaocunNovorossiysk: 42 t/day estimated with SanshandaocunTaman: 40 t/day estimated with SanshandaocunKhor Fakkan: 40 t/day estimated with SanshandaocunMap Ta Phut: 39 t/day estimated with SanshandaocunGuangxi Beibu Gulf Port: 39 t/day estimated with SanshandaocunRotterdam: 38 t/day estimated with SanshandaocunYangpu: 36 t/day estimated with SanshandaocunBashayer: 36 t/day estimated with SanshandaocunHamada: 35 t/day estimated with SanshandaocunKeelung: 35 t/day estimated with SanshandaocunKimanis: 34 t/day estimated with SanshandaocunBusan: 31 t/day estimated with SanshandaocunMizushima: 31 t/day estimated with SanshandaocunSaigon: 31 t/day estimated with SanshandaocunWenzhou: 30 t/day estimated with SanshandaocunDongguan: 30 t/day estimated with SanshandaocunYantian: 29 t/day estimated with SanshandaocunPenglai: 29 t/day estimated with SanshandaocunChangzhou: 29 t/day estimated with SanshandaocunTokuyama: 29 t/day estimated with SanshandaocunJohor: 28 t/day estimated with SanshandaocunChiwan: 28 t/day estimated with SanshandaocunDavao: 28 t/day estimated with SanshandaocunQuequén: 28 t/day estimated with SanshandaocunHazira: 28 t/day estimated with SanshandaocunKrishnapatnam Port: 28 t/day estimated with SanshandaocunFangcheng: 28 t/day estimated with SanshandaocunHibikinada: 27 t/day estimated with SanshandaocunMundra: 26 t/day estimated with SanshandaocunQianhai Bay: 26 t/day estimated with SanshandaocunNakhodka: 25 t/day estimated with SanshandaocunTanjung Sangata: 25 t/day estimated with SanshandaocunRayong: 25 t/day estimated with SanshandaocunChaozhou: 25 t/day estimated with SanshandaocunMawan: 25 t/day estimated with SanshandaocunBanten: 25 t/day estimated with SanshandaocunYangon: 25 t/day estimated with SanshandaocunSurabaya: 25 t/day estimated with SanshandaocunDung Quat: 25 t/day estimated with SanshandaocunKarachi: 25 t/day estimated with SanshandaocunNaoetsu: 24 t/day estimated with SanshandaocunChittagong: 23 t/day estimated with SanshandaocunPort Hedland: 23 t/day estimated with SanshandaocunDhamra Port: 22 t/day estimated with SanshandaocunParadip: 22 t/day estimated with SanshandaocunJaigad Port: 22 t/day estimated with SanshandaocunBahia Quintero (Ventanas): 21 t/day estimated with SanshandaocunNghe Tinh: 21 t/day estimated with SanshandaocunBunbury: 20 t/day estimated with SanshandaocunApra Harbor: 20 t/day estimated with SanshandaocunHaimen: 20 t/day estimated with SanshandaocunSan Vicente: 20 t/day estimated with SanshandaocunSiam Seaport: 19 t/day estimated with SanshandaocunPort Elizabeth: 19 t/day estimated with SanshandaocunJabal Az Zannah-Ruways: 18 t/day estimated with SanshandaocunBorusan: 18 t/day estimated with SanshandaocunKobe: 17 t/day estimated with SanshandaocunOita: 17 t/day estimated with SanshandaocunMuara: 17 t/day estimated with SanshandaocunQushan Island: 17 t/day estimated with SanshandaocunAntwerp: 17 t/day estimated with SanshandaocunRosarito: 16 t/day estimated with SanshandaocunTuban: 16 t/day estimated with SanshandaocunTopolobampo: 16 t/day estimated with SanshandaocunVisakhapatnam: 15 t/day estimated with SanshandaocunWakayama-Shimotsu: 15 t/day estimated with SanshandaocunSakai: 15 t/day estimated with SanshandaocunDandong: 15 t/day estimated with SanshandaocunKisarazu: 15 t/day estimated with SanshandaocunJorf Lasfar: 15 t/day estimated with SanshandaocunSlavyanka: 15 t/day estimated with SanshandaocunJubail: 14 t/day estimated with SanshandaocunHakodate: 14 t/day estimated with SanshandaocunLae: 14 t/day estimated with SanshandaocunShijing Longxiang: 14 t/day estimated with SanshandaocunPemba: 12 t/day estimated with SanshandaocunKanda: 12 t/day estimated with SanshandaocunLongyan Port: 12 t/day estimated with SanshandaocunRas Al-Khair: 11 t/day estimated with SanshandaocunShantou: 11 t/day estimated with SanshandaocunSao Francisco: 11 t/day estimated with SanshandaocunIshikariwan-Shinko: 10 t/day estimated with SanshandaocunShui Dong: 9 t/day estimated with SanshandaocunGresik: 9 t/day estimated with SanshandaocunWeihai: 8 t/day estimated with SanshandaocunNanao: 7 t/day estimated with SanshandaocunFunabashi: 7 t/day estimated with SanshandaocunSuzhou (Zhangjiagang): 7 t/day estimated with SanshandaocunShidao Newport: 7 t/day estimated with SanshandaocunHachinohe: 7 t/day estimated with SanshandaocunSakai-Semboku: 7 t/day estimated with SanshandaocunYatsushiro: 7 t/day estimated with SanshandaocunMailiao: 6 t/day estimated with SanshandaocunMikawa: 6 t/day estimated with SanshandaocunKâmpóng Saôm: 5 t/day estimated with SanshandaocunNanjing: 5 t/day estimated with SanshandaocunQuanzhou: 5 t/day estimated with SanshandaocunDafeng: 4 t/day estimated with SanshandaocunPohang: 4 t/day estimated with SanshandaocunSanshandaocun
click to enable scroll zoom · drag to pan

Full footprint: all 240 connections of Sanshandaocun aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.WeipaAustralia14.6 days between calls
  2. 2.Longkou GangChina21.0 days between calls
  3. 3.NingboChina7.8 days between calls
  4. 4.DongjiakouChina15.5 days between calls
  5. 5.SingaporeSingapore30.0 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Longkou GangChina13.2 days between calls
  2. 2.DongjiakouChina12.9 days between calls
  3. 3.SingaporeSingapore17.3 days between calls
  4. 4.Lanqiao PortChina19.4 days between calls
  5. 5.ShanghaiChina6.9 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)