Port profile · Maritime Radar

Port of Saganoseki daily activity

Saganoseki handled an estimated average of 931 t a day in the week ending 25 September 2026 (-91.5% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPSAG · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Plastics, Rubber, Leather

Data up to · 25 September 2026

7-day average · Estimated total volume

931 t

28-day average

4.7 kt

Vs 28-day average

-80.1%

Year on year (same week)

-91.5%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container00 t0 t
Dry bulk831 kt42 kt
General cargo1620 kt7.3 kt
Ro-Ro40 t0 t
Tanker51.6 kt29 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Ulsan: 1,251 t/day estimated with SaganosekiUlsanKobe: 889 t/day estimated with SaganosekiKobeMejillones: 817 t/day estimated with SaganosekiMejillonesNiihama: 739 t/day estimated with SaganosekiNiihamaSingapore: 649 t/day estimated with SaganosekiSingaporeOnahama: 620 t/day estimated with SaganosekiOnahamaPort Kembla: 344 t/day estimated with SaganosekiPort KemblaPort of Sohar: 335 t/day estimated with SaganosekiPort of SoharLumut: 280 t/day estimated with SaganosekiLumutHitachi: 253 t/day estimated with SaganosekiHitachiAmamapare: 249 t/day estimated with SaganosekiAmamapareUbe: 234 t/day estimated with SaganosekiUbeShanghai: 203 t/day estimated with SaganosekiShanghaiQingdao Port: 199 t/day estimated with SaganosekiQingdao PortKaohsiung: 192 t/day estimated with SaganosekiKaohsiungLos Angeles-Long Beach: 181 t/day estimated with SaganosekiLos Angeles-Long BeachOita: 178 t/day estimated with SaganosekiOitaStockton: 174 t/day estimated with SaganosekiStocktonMap Ta Phut: 159 t/day estimated with SaganosekiMap Ta PhutJinzhou: 157 t/day estimated with SaganosekiJinzhouPuerto Caldera: 134 t/day estimated with SaganosekiPuerto CalderaAl Hamriyah LPG Terminal: 126 t/day estimated with SaganosekiAl Hamriyah LPG TerminalWakayama-Shimotsu: 121 t/day estimated with SaganosekiWakayama-ShimotsuVancouver: 117 t/day estimated with SaganosekiVancouverYantai: 110 t/day estimated with SaganosekiYantaiTaichung: 109 t/day estimated with SaganosekiTaichungLianyungang: 103 t/day estimated with SaganosekiLianyungangSalaverry: 95 t/day estimated with SaganosekiSalaverryIsabel: 95 t/day estimated with SaganosekiIsabelNantong: 94 t/day estimated with SaganosekiNantongAntofagasta: 93 t/day estimated with SaganosekiAntofagastaSuzhou (Taicang): 89 t/day estimated with SaganosekiSuzhou (Taicang)Akita: 89 t/day estimated with SaganosekiAkitaDuqm: 86 t/day estimated with SaganosekiDuqmPort Moresby: 85 t/day estimated with SaganosekiPort MoresbyTianjin Xin Gang: 78 t/day estimated with SaganosekiTianjin Xin GangTaboguilla: 75 t/day estimated with SaganosekiTaboguillaTokuyama: 72 t/day estimated with SaganosekiTokuyamaXiagong: 71 t/day estimated with SaganosekiXiagongNagoya: 70 t/day estimated with SaganosekiNagoyaHouston (US-TX): 66 t/day estimated with SaganosekiHouston (US-TX)Kashima-Ibaraki: 65 t/day estimated with SaganosekiKashima-IbarakiHimeji: 64 t/day estimated with SaganosekiHimejiBayuquan: 62 t/day estimated with SaganosekiBayuquanFangcheng: 61 t/day estimated with SaganosekiFangchengVisakhapatnam: 60 t/day estimated with SaganosekiVisakhapatnamMikawa: 60 t/day estimated with SaganosekiMikawaUno: 58 t/day estimated with SaganosekiUnoKitakyushu (Wakamatsu): 57 t/day estimated with SaganosekiKitakyushu (Wakamatsu)Busan: 56 t/day estimated with SaganosekiBusanSuzhou (Zhangjiagang): 56 t/day estimated with SaganosekiSuzhou (Zhangjiagang)Manila: 54 t/day estimated with SaganosekiManilaTanjung Benete: 54 t/day estimated with SaganosekiTanjung BeneteUmm Qasr: 53 t/day estimated with SaganosekiUmm QasrDonghae: 52 t/day estimated with SaganosekiDonghaeKakinada: 52 t/day estimated with SaganosekiKakinadaYanbu (Yanbu city): 50 t/day estimated with SaganosekiYanbu (Yanbu city)Callao: 48 t/day estimated with SaganosekiCallaoGuayaquil: 47 t/day estimated with SaganosekiGuayaquilChiba: 47 t/day estimated with SaganosekiChibaSeattle: 47 t/day estimated with SaganosekiSiam Seaport: 47 t/day estimated with SaganosekiNakhodka: 46 t/day estimated with SaganosekiGuaymas: 44 t/day estimated with SaganosekiOsaka: 42 t/day estimated with SaganosekiPort Hedland: 40 t/day estimated with SaganosekiMizushima: 40 t/day estimated with SaganosekiZhapu: 39 t/day estimated with SaganosekiPyeongtaek: 39 t/day estimated with SaganosekiQinhuangdao: 38 t/day estimated with SaganosekiFremantle: 37 t/day estimated with SaganosekiYokohama: 36 t/day estimated with SaganosekiJiangyin: 36 t/day estimated with SaganosekiCai Mep: 35 t/day estimated with SaganosekiHachinohe: 35 t/day estimated with SaganosekiParadip: 35 t/day estimated with SaganosekiIwakuni: 34 t/day estimated with SaganosekiKuantan: 33 t/day estimated with SaganosekiKhalifa Port: 33 t/day estimated with SaganosekiGresik: 32 t/day estimated with SaganosekiNiigata: 32 t/day estimated with SaganosekiSusaki: 32 t/day estimated with SaganosekiIncheon: 32 t/day estimated with SaganosekiBaltimore: 32 t/day estimated with SaganosekiMatarani: 31 t/day estimated with SaganosekiJohor: 31 t/day estimated with SaganosekiBrisbane: 30 t/day estimated with SaganosekiKawasaki: 29 t/day estimated with SaganosekiTownsville: 28 t/day estimated with SaganosekiMumbai-Jawaharlal Nehru (Nhava Sheva): 28 t/day estimated with SaganosekiFushiki-Toyama: 27 t/day estimated with SaganosekiKanda: 27 t/day estimated with SaganosekiMoji: 26 t/day estimated with SaganosekiKaraikal: 25 t/day estimated with SaganosekiDaesan: 25 t/day estimated with SaganosekiVladivostok: 25 t/day estimated with SaganosekiRizhao: 24 t/day estimated with SaganosekiAcajutla: 24 t/day estimated with SaganosekiGeraldton: 23 t/day estimated with SaganosekiKeelung: 22 t/day estimated with SaganosekiXiamen: 22 t/day estimated with SaganosekiLanqiao Port: 22 t/day estimated with SaganosekiHososhima: 20 t/day estimated with SaganosekiHigashiharima: 20 t/day estimated with SaganosekiZhouliwang: 20 t/day estimated with SaganosekiVostochnyy: 20 t/day estimated with SaganosekiSakai-Semboku: 20 t/day estimated with SaganosekiMatsuyama: 20 t/day estimated with SaganosekiPuerto Cabello: 19 t/day estimated with SaganosekiGwangyang (Kwangyang): 18 t/day estimated with SaganosekiSakaide: 17 t/day estimated with SaganosekiHong Kong: 17 t/day estimated with SaganosekiTsukumi: 17 t/day estimated with SaganosekiMombasa: 17 t/day estimated with SaganosekiPohang: 16 t/day estimated with SaganosekiDavao: 16 t/day estimated with SaganosekiFujairah: 16 t/day estimated with SaganosekiTanjung Priok: 16 t/day estimated with SaganosekiHonolulu: 16 t/day estimated with SaganosekiNewcastle: 16 t/day estimated with SaganosekiGuangzhou (Nansha): 16 t/day estimated with SaganosekiMina Saqr: 16 t/day estimated with SaganosekiHibikinada: 15 t/day estimated with SaganosekiPuerto Cortes: 15 t/day estimated with SaganosekiBarranquilla: 15 t/day estimated with SaganosekiDar Es Salaam: 15 t/day estimated with SaganosekiAbu Dhabi: 15 t/day estimated with SaganosekiAuckland: 15 t/day estimated with SaganosekiDammam: 15 t/day estimated with SaganosekiVancouver: 15 t/day estimated with SaganosekiFukui: 15 t/day estimated with SaganosekiPuerto Plata: 15 t/day estimated with SaganosekiCaleta Patillos: 14 t/day estimated with SaganosekiBahia Quintero (Ventanas): 14 t/day estimated with SaganosekiAltamira: 14 t/day estimated with SaganosekiPort Nador: 14 t/day estimated with SaganosekiQiwei: 14 t/day estimated with SaganosekiKingston: 13 t/day estimated with SaganosekiKota Baru: 13 t/day estimated with SaganosekiJorf Lasfar: 13 t/day estimated with SaganosekiKagoshima: 13 t/day estimated with SaganosekiNingbo: 12 t/day estimated with SaganosekiIligan: 12 t/day estimated with SaganosekiIshinomaki: 12 t/day estimated with SaganosekiMassawa: 12 t/day estimated with SaganosekiNaoetsu: 12 t/day estimated with SaganosekiYokkaichi: 12 t/day estimated with SaganosekiDahej: 11 t/day estimated with SaganosekiIlo: 11 t/day estimated with SaganosekiHakata: 11 t/day estimated with SaganosekiKemaman Harbor: 11 t/day estimated with SaganosekiGourd Shanzui: 11 t/day estimated with SaganosekiShibushi: 10 t/day estimated with SaganosekiTomakomai: 10 t/day estimated with SaganosekiYatsushiro: 10 t/day estimated with SaganosekiDandong: 9 t/day estimated with SaganosekiNew Orleans: 9 t/day estimated with SaganosekiShougang Jingtang: 9 t/day estimated with SaganosekiDurban: 9 t/day estimated with SaganosekiBangkok: 9 t/day estimated with SaganosekiLuoyuan: 8 t/day estimated with SaganosekiOnoda: 8 t/day estimated with SaganosekiLazaro Cardenas: 8 t/day estimated with SaganosekiPunta Lobitos: 8 t/day estimated with SaganosekiFukuyama: 8 t/day estimated with SaganosekiTuticorin: 7 t/day estimated with SaganosekiTsuruga: 7 t/day estimated with SaganosekiChaozhou: 7 t/day estimated with SaganosekiDalian: 7 t/day estimated with SaganosekiSharjah: 7 t/day estimated with SaganosekiLongkou Gang: 7 t/day estimated with SaganosekiBalikpapan: 6 t/day estimated with SaganosekiQinzhou: 6 t/day estimated with SaganosekiFuzhou: 6 t/day estimated with SaganosekiBluff Harbor: 5 t/day estimated with SaganosekiBatangas City: 5 t/day estimated with SaganosekiGladstone: 5 t/day estimated with SaganosekiPengerang: 5 t/day estimated with SaganosekiLae: 4 t/day estimated with SaganosekiGdansk: 4 t/day estimated with SaganosekiSaiki: 4 t/day estimated with SaganosekiSaigon: 4 t/day estimated with SaganosekiKure: 3 t/day estimated with SaganosekiTakamatsu: 3 t/day estimated with SaganosekiJiaxing: 3 t/day estimated with SaganosekiMutsure: 3 t/day estimated with SaganosekiMarugame: 3 t/day estimated with SaganosekiOnomichi-Itozaki: 3 t/day estimated with SaganosekiMasan: 3 t/day estimated with SaganosekiMaizuru: 3 t/day estimated with SaganosekiPortland, OR: 2 t/day estimated with SaganosekiShimizu: 2 t/day estimated with SaganosekiHiroshima: 2 t/day estimated with SaganosekiKomatsushima: 2 t/day estimated with SaganosekiMailiao: 2 t/day estimated with SaganosekiBeihai: 2 t/day estimated with SaganosekiSuzhou (Changshu): 2 t/day estimated with SaganosekiPenglai: 2 t/day estimated with SaganosekiWeifang Port: 2 t/day estimated with SaganosekiKisarazu: 2 t/day estimated with SaganosekiSaganoseki
click to enable scroll zoom · drag to pan

Full footprint: all 237 connections of Saganoseki aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.KobeJapan7.2 days between calls
  2. 2.UlsanKorea6.2 days between calls
  3. 3.OnahamaJapan9.6 days between calls
  4. 4.Port KemblaAustralia20.2 days between calls
  5. 5.NiihamaJapan3.5 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.MejillonesChile35.0 days between calls
  2. 2.SingaporeSingapore10.3 days between calls
  3. 3.NiihamaJapan2.6 days between calls
  4. 4.UlsanKorea4.1 days between calls
  5. 5.Port of SoharOman22.5 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)