Ravenna handled an estimated average of 41 kt a day in the week ending 25 September 2026 (-24.0% year on year), with an average of 6 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Italy · LOCODE ITRAN · Main cargo sectors: Mineral Products, Metals, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

41 kt

28-day average

38 kt

Vs 28-day average

+7.2%

Year on year (same week)

-24.0%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container3838 kt17 kt
Dry bulk26578 kt3.2 kt
General cargo4488 kt16 kt
Ro-Ro121.7 kt34 kt
Tanker43272 kt15 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Porto Di Lido-Venezia: 6,252 t/day estimated with RavennaPorto Di Lido-VeneziaKoper: 3,151 t/day estimated with RavennaKoperGüllük: 2,516 t/day estimated with RavennaGüllükTrieste: 2,268 t/day estimated with RavennaTriesteAncona: 1,847 t/day estimated with RavennaAnconaIstanbul: 1,668 t/day estimated with RavennaIstanbulOlvia: 1,637 t/day estimated with RavennaOlviaCartagena: 1,577 t/day estimated with RavennaCartagenaNemrut Bay: 1,573 t/day estimated with RavennaNemrut BayMalamocco: 1,352 t/day estimated with RavennaMalamoccoConstantza: 1,350 t/day estimated with RavennaConstantzaBrindisi: 1,242 t/day estimated with RavennaBrindisiBremen: 1,198 t/day estimated with RavennaBremenMilazzo: 1,166 t/day estimated with RavennaMilazzoDamietta: 1,010 t/day estimated with RavennaDamiettaAugusta: 955 t/day estimated with RavennaAugustaEl Dekheila: 867 t/day estimated with RavennaEl DekheilaTaranto: 834 t/day estimated with RavennaTarantoAlexandria: 796 t/day estimated with RavennaAlexandriaYakacik: 787 t/day estimated with RavennaYakacikSarroch Oil Terminal: 774 t/day estimated with RavennaSarroch Oil TerminalLas Palmas (de Gran Canaria): 765 t/day estimated with RavennaLas Palmas (de Gran Canaria)El Grao: 755 t/day estimated with RavennaEl GraoDiliskelesi: 704 t/day estimated with RavennaDiliskelesiOdessa: 700 t/day estimated with RavennaOdessaLisboa: 686 t/day estimated with RavennaLisboaBarcelona: 666 t/day estimated with RavennaBarcelonaChornomorsk: 638 t/day estimated with RavennaChornomorskSan Martin: 633 t/day estimated with RavennaSan MartinAlgeciras: 552 t/day estimated with RavennaAlgecirasMonfalcone: 552 t/day estimated with RavennaMonfalconeBari: 548 t/day estimated with RavennaBariCatania: 497 t/day estimated with RavennaCataniaMykolaiv: 495 t/day estimated with RavennaMykolaivAmbarli: 474 t/day estimated with RavennaAmbarliAshdod: 454 t/day estimated with RavennaAshdodDunkirk: 451 t/day estimated with RavennaDunkirkKandla: 437 t/day estimated with RavennaKandlaArzew: 431 t/day estimated with RavennaArzewSalerno: 421 t/day estimated with RavennaSalernoTarragona: 407 t/day estimated with RavennaTarragonaGhent: 406 t/day estimated with RavennaGhentSaint Petersburg: 397 t/day estimated with RavennaSaint PetersburgNovorossiysk: 388 t/day estimated with RavennaNovorossiyskLimassol: 376 t/day estimated with RavennaLimassolRotterdam: 369 t/day estimated with RavennaRotterdamHaifa: 363 t/day estimated with RavennaHaifaMariupol: 348 t/day estimated with RavennaMariupolMumbai-Jawaharlal Nehru (Nhava Sheva): 346 t/day estimated with RavennaMumbai-Jawaharlal Nehru (Nhava Sheva)Napoli: 330 t/day estimated with RavennaNapoliAntwerp: 323 t/day estimated with RavennaAntwerpGioia Tauro: 316 t/day estimated with RavennaGioia TauroSagunto: 311 t/day estimated with RavennaSaguntoRosario: 310 t/day estimated with RavennaRosarioPivdennyi: 295 t/day estimated with RavennaPivdennyiHuelva: 280 t/day estimated with RavennaHuelvaMormugao: 277 t/day estimated with RavennaMormugaoKaohsiung: 276 t/day estimated with RavennaKaohsiungDhamra Port: 271 t/day estimated with RavennaDhamra PortYarimca: 267 t/day estimated with RavennaYarimcaFos: 257 t/day estimated with RavennaDjen Djen: 249 t/day estimated with RavennaAgioi Oil Terminal: 248 t/day estimated with RavennaDerince (Izmit-Kocaeli): 244 t/day estimated with RavennaBilbao: 243 t/day estimated with RavennaVarna: 243 t/day estimated with RavennaGenova: 238 t/day estimated with RavennaCeuta: 232 t/day estimated with RavennaHouston (US-TX): 227 t/day estimated with RavennaPort Kembla: 224 t/day estimated with RavennaUst-Luga: 222 t/day estimated with RavennaBorusan: 217 t/day estimated with RavennaMersin: 213 t/day estimated with RavennaGebze: 211 t/day estimated with RavennaPort Said: 208 t/day estimated with RavennaKashima-Ibaraki: 205 t/day estimated with RavennaJorf Lasfar: 197 t/day estimated with RavennaCai Mep: 192 t/day estimated with RavennaMontreal: 190 t/day estimated with RavennaPiraeus: 187 t/day estimated with RavennaAviles: 182 t/day estimated with RavennaAveiro: 171 t/day estimated with RavennaDung Quat: 169 t/day estimated with RavennaDuluth: 165 t/day estimated with RavennaGolcuk: 156 t/day estimated with RavennaShanghai: 156 t/day estimated with RavennaOita: 156 t/day estimated with RavennaLivorno: 155 t/day estimated with RavennaCasablanca: 155 t/day estimated with RavennaGwangyang (Kwangyang): 155 t/day estimated with RavennaEregli: 152 t/day estimated with RavennaBanten: 151 t/day estimated with RavennaGela: 150 t/day estimated with RavennaGemlik: 150 t/day estimated with RavennaNew Orleans: 149 t/day estimated with RavennaBandirma: 147 t/day estimated with RavennaSavona: 145 t/day estimated with RavennaJeddah: 145 t/day estimated with RavennaParadip: 143 t/day estimated with RavennaMarsaxlokk: 143 t/day estimated with RavennaMellitah: 143 t/day estimated with RavennaKarachi: 139 t/day estimated with RavennaGabes: 139 t/day estimated with RavennaAnnaba: 137 t/day estimated with RavennaPatras: 135 t/day estimated with RavennaIndonesia Morowali Industrial Park: 135 t/day estimated with RavennaAl Adabiyah: 134 t/day estimated with RavennaBurgas: 130 t/day estimated with RavennaIzmir: 129 t/day estimated with RavennaTerneuzen: 128 t/day estimated with RavennaSete: 126 t/day estimated with RavennaItaqui: 125 t/day estimated with RavennaOristano: 124 t/day estimated with RavennaNewport: 122 t/day estimated with RavennaMombasa: 122 t/day estimated with RavennaFreeport (US-FL): 118 t/day estimated with RavennaPort-De-Bouc: 118 t/day estimated with RavennaHazira: 116 t/day estimated with RavennaBizerte: 113 t/day estimated with RavennaToros Gubre: 112 t/day estimated with RavennaEleusis: 106 t/day estimated with RavennaRostov-Na-Donu: 105 t/day estimated with RavennaIzmail: 104 t/day estimated with RavennaFangcheng: 103 t/day estimated with RavennaMarina Di Carrara: 99 t/day estimated with RavennaSfax: 99 t/day estimated with RavennaRomano: 97 t/day estimated with RavennaRijeka: 97 t/day estimated with RavennaVila Do Conde: 94 t/day estimated with RavennaNorfolk: 94 t/day estimated with RavennaVisakhapatnam: 92 t/day estimated with RavennaSan Nicolas: 91 t/day estimated with RavennaZhanjiang: 91 t/day estimated with RavennaGiurgiulesti Port: 91 t/day estimated with RavennaThunder Bay: 90 t/day estimated with RavennaSingapore: 90 t/day estimated with RavennaAmsterdam: 89 t/day estimated with RavennaXiamen: 88 t/day estimated with RavennaHuanghua: 88 t/day estimated with RavennaRio Grande: 87 t/day estimated with RavennaMisrata: 87 t/day estimated with RavennaBeirut: 85 t/day estimated with RavennaThessaloníki: 82 t/day estimated with RavennaBaltimore: 82 t/day estimated with RavennaSplit: 81 t/day estimated with RavennaAqaba: 80 t/day estimated with RavennaPloce: 80 t/day estimated with RavennaDammam: 78 t/day estimated with RavennaQuebec: 78 t/day estimated with RavennaTekirdag: 78 t/day estimated with RavennaKulevi Oil Terminal: 78 t/day estimated with RavennaPiombino: 77 t/day estimated with RavennaZhoushan: 76 t/day estimated with RavennaPuerto Barrios: 75 t/day estimated with RavennaPohang: 75 t/day estimated with RavennaCivitavecchia: 74 t/day estimated with RavennaMuhammad Bin Qasim: 74 t/day estimated with RavennaAbidjan: 74 t/day estimated with RavennaChioggia: 74 t/day estimated with RavennaPuerto Castilla: 73 t/day estimated with RavennaDalian: 73 t/day estimated with RavennaSan Giorgio: 73 t/day estimated with RavennaTuapse: 71 t/day estimated with RavennaParanaguá: 70 t/day estimated with RavennaShougang Jingtang: 69 t/day estimated with RavennaOran: 69 t/day estimated with RavennaSousse: 69 t/day estimated with RavennaTaman: 68 t/day estimated with RavennaBrake: 67 t/day estimated with RavennaPort Klang: 66 t/day estimated with RavennaSamsun: 65 t/day estimated with RavennaKamarajar Port: 64 t/day estimated with RavennaPort Everglades: 64 t/day estimated with RavennaKlaipeda: 61 t/day estimated with RavennaHaldia: 59 t/day estimated with RavennaDelta Terminal: 59 t/day estimated with RavennaIskenderun: 58 t/day estimated with RavennaBenghazi: 57 t/day estimated with RavennaJebel Ali: 57 t/day estimated with RavennaGaeta: 57 t/day estimated with RavennaNouakchott: 56 t/day estimated with RavennaTianjin Xin Gang: 56 t/day estimated with RavennaTaichung: 55 t/day estimated with RavennaSanta Cruz De Tenerife: 55 t/day estimated with RavennaYeysk: 54 t/day estimated with RavennaPyeongtaek: 54 t/day estimated with RavennaJohor: 53 t/day estimated with RavennaBusan: 53 t/day estimated with RavennaMurmansk: 52 t/day estimated with RavennaGuangdong Yangjiang Port: 52 t/day estimated with RavennaBrownsville (US-PA): 52 t/day estimated with RavennaBotas Natural Gas Terminal: 51 t/day estimated with RavennaKotka: 51 t/day estimated with RavennaCoatzacoalcos: 51 t/day estimated with RavennaVlora: 50 t/day estimated with RavennaLarnaca: 48 t/day estimated with RavennaBristol: 48 t/day estimated with RavennaXiagong: 48 t/day estimated with RavennaPort Elizabeth: 47 t/day estimated with RavennaPort Saint Louis Du Rhone: 47 t/day estimated with RavennaRavenna
click to enable scroll zoom · drag to pan

Full footprint: all 566 connections of Ravenna aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Porto Di Lido-VeneziaItaly1.8 days between calls
  2. 2.GüllükTürkiye5.1 days between calls
  3. 3.KoperSlovenia1.8 days between calls
  4. 4.CartagenaSpain9.1 days between calls
  5. 5.OlviaUkraine8.5 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Porto Di Lido-VeneziaItaly2.1 days between calls
  2. 2.MalamoccoItaly1.4 days between calls
  3. 3.TriesteItaly1.6 days between calls
  4. 4.AnconaItaly1.3 days between calls
  5. 5.KoperSlovenia1.9 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)