Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

7 projects · funding €50.9m

  • Ponentia-La Melusa international railway multimodal terminal

    €19.5m

    OngoingPONENTIA LOGISTICS S.A · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Sept 2024 → Dec 2026 · investment €64.2m

  • INTERMODAL TERMINAL OF MURCIA AND ITS RAIL LINK

    €13.9m

    OngoingConsejería de Fomento e Infraestructuras (C. A. Región de Murcia) · Multimodal · Mediterranean Corridor · call CEF-T-2021-COREGEN · Oct 2022 → Nov 2025 · investment €46.1m

  • Intermodal Platform of the Port of Huelva II: a boost to multimodality, connectivity and sustainability

    €6.7m

    OngoingAutoridad Portuaria de Huelva · Multimodal · Atlantic Corridor · call CEF-T-2022-COREGEN · Oct 2022 → Apr 2025 · investment €22.4m

  • Optimization of the TRAffic MAnagement and infrastructure capacity in the port of Valencia

    €4.1m

    OngoingFUNDACION DE LA COMUNIDAD VALENCIANA PARA LA INVESTIGACION,PROMOCION Y ESTUDIOS COMERCIALES DE VALENCIAPORT · Multimodal · Mediterranean Corridor · call CEF-T-2023 · Mar 2024 → Dec 2026 · investment €8.2m

  • DATA SPACE 4 MOBILITY MODELS INTEGRATION

    €3m

    OngoingESTACIONAMIENTOS Y SERVICIOS, S.A.U · Multimodal · Outside the corridors · call CEF-T-2023 · Jun 2024 → May 2027 · investment €6m

  • Support to Spain for CEF related activities, participation in the RFC and CNC, and on TENtec

    €1.9m

    OngoingMITMA · Multimodal · Outside the corridors · call CEF-T-2021-TAGENEA · Jan 2021 → Dec 2025

  • Upgrade of Zaragoza's terminal rail facilities Upgrade of TmZ terminal rail facilities for 750 m trains and new North rail connection to become a through terminal and avoid bottlenecks in the accesses

    €1.8m

    OngoingTerminal Marítima de Zaragoza SL · Multimodal · Mediterranean Corridor · call CEF-T-2022-COREGEN · Jan 2023 → Feb 2026 · investment €6m

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)