CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects
4 projects · funding €54.1m
Nuevo acceso sur por ferrocarril y carretera al Puerto de Barcelona - Fase 2 - Obras de conexión.
€36.1m
TerminatedAutoridad Portuaria de Barcelona · Multimodal · Mediterranean Corridor · call 2014 · Jul 2015 → Dec 2018 · investment €120.4m
MiRO 2 - Multimodal Route connecting Barcelona to Paris
€11.1m
TerminatedVIIA (Francia) · Multimodal · Mediterranean Corridor · call 2018 · Feb 2019 → Dec 2023 · investment €55.4m
Establishment of a new intermodal terminal at BASF ESPAÑOLA, S.L. in Tarragona - Spain - for modal shift between rail and road
€5.5m
TerminatedCOMBI TERMINAL CATALONIA, S.L. · Multimodal · Mediterranean Corridor · call 2014 · Oct 2015 → Sept 2019 · investment €25.5m
Study for the optimization of an existing intermodal terminal in Port of Tarragona for modal shift between rail and road
€1.4m
TerminatedCOMBI TERMINAL CATALONIA SL · Multimodal · Outside the corridors · call 2020 · Mar 2021 → Jul 2024 · investment €2.7m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.