Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

127 projects · funding €1.4bn

  • Corredor atlántico: tramo Bergara-San Sebastián- Bayona. Estudios y obras y servicios de seguimiento de obras. Fase 1.

    €448.1m

    CompletedMinisterio de Fomento · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €1.1bn

  • SESAR Deployment Programme Implementation - 2017

    €228.2m

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2017 · Apr 2018 → Dec 2021 · investment €457.7m

  • Implementación del ancho UIC (fase 1) en el tramo Valencia-Tarragona-Barcelona del corredor Mediterráneo.

    €124.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €311.2m

  • Implantacion del ancho UIC en el tramo Castellbisbal-Vilaseca. Corredor Mediterráneo.

    €57m

    CompletedADIF · Rail · Mediterranean Corridor · call 2017 · Jul 2017 → Dec 2024 · investment €285m

  • Mediterranean Corridor. Section Valencia-Sagunto-Castellón. Implementation of UIC gauge. Phase 2."

    €41.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2019 · Feb 2020 → Dec 2024 · investment €103.8m

  • Aplicación del programa de despliegue sesar 2016 - grupo 1: generalidades

    €34.9m

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2016 · Feb 2017 → Dec 2023 · investment €88m

  • Actualización y retroadaptación del ERTMS embarcado en los vehículos de renfe

    €28m

    CompletedRENFE F y M · Rail · Outside the corridors · call 2015 · Feb 2016 → Dec 2024 · investment €56m

  • Pruebas futuras del Puerto de Bilbao perteneciente a la red básica del corredor atlántico.

    €23.2m

    CompletedAutoridad Portuaria de Bilbao · Maritime · Atlantic Corridor · call 2014 · Jan 2015 → Oct 2021 · investment €116.2m

  • Solicitud conjunta para la implementación del pdp - grupo 1

    €22.8m

    CompletedENAIRE · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2020 · investment €45.7m

  • Conexión ferroviaria Aveiro-Salamanca-Medina del Campo: obras en instalaciones y servicios de energía para trabajos de seguimiento.

    €19.6m

    CompletedADIF · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €49m

  • Línea ferroviaria de alta velocidad Bilbao-Vitoria - Obras de plataforma en las subsecciones Elorroio-Atxondo y Atxondo-Abadino y trabajos de seguimiento.

    €18.1m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · Dec 2015 → Dec 2020 · investment €90.4m

  • CORE LNGas - Corredores Red Básica Gas Natural Licuado (obras)

    €16.5m

    CompletedEnagas Transporte, S.A.U. · Multimodal · Outside the corridors · call 2014 · Jan 2014 → Dec 2021 · investment €33.1m

  • IBERDROLA SMART MOBILITY

    €13.4m

    CompletedIBERDROLA CLIENTES, S.A. · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2022 · investment €89.2m

  • Aplicación del programa de despliegue SESAR 2015 - grupo 2

    €12.6m

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2015 · Feb 2016 → Dec 2024 · investment €40.3m

  • LNGHIVE2 VESSEL DEMAND: GREEN AND SMART LINKS

    €11.8m

    CompletedBalearia · Maritime · Atlantic and Mediterranean · call 2017 · Apr 2018 → Jul 2021 · investment €59m

  • Mejora de la conexión ferroviaria interior y de la accesibilidad marítima al Puerto de Valencia (CONNECT VALENCIAPORT).

    €11.6m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €55.9m

  • Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.

    €11.4m

    CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m

  • LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay

    €11.3m

    CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m

  • Retroadaptación del ERTMS embarcado en los vehículos de renfe

    €11.3m

    CompletedRENFE-FABRICACIÓN Y MANTENIMIENTO SOCIEDAD MERCANTIL ESTATAL,S.A. · Rail · Outside the corridors · call 2016 · Feb 2017 → Dec 2024 · investment €22.5m

  • Implementation of Voice over IP (VoIP) in Barcelona ACC

    €10.8m

    CompletedSESAR Deployment Manager (NATs en route) · Air · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2023 · investment €21.7m

  • TB CLEAN URBAN TRANSPORT FLEET RENEWAL

    €9.2m

    CompletedTransports de Barcelona S.A · Road · Mediterranean Corridor · call 2019 · Jan 2020 → Dec 2024 · investment €47.6m

  • LNGHIVE2 Barcelona- An efficient LNG bunker barge in the port of Barcelona

    €9.2m

    CompletedENAGAS · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2023 · investment €45.8m

  • C-ROADs España

    €9m

    CompletedDirección General de Tráfico (DGT) · Road · Outside the corridors · call 2016 · Feb 2017 → Jun 2021 · investment €18m

  • Despliegue de ERTMS en el tramo Valladolid-Burgos

    €7.8m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · May 2014 → Dec 2022 · investment €15.6m

  • Plataforma logística intermodal en el suroeste de Europa

    €7.6m

    CompletedGobierno de Extremadura · Multimodal · Atlantic Corridor · call 2014 · Apr 2014 → Sept 2022 · investment €35.8m

  • Project Everest

    €7.3m

    CompletedNORDIAN CPO, SL · Road · Atlantic and Mediterranean · call 2019 · Aug 2020 → Jun 2023 · investment €48.9m

  • Electrification and Signalling works in Crossborder Section Guillarei Tui

    €6.5m

    CompletedADIF · Rail · Outside the corridors · call 2019 · Sept 2019 → Dec 2023 · investment €16.3m

  • [LNGHIVE2 Santander] Development of LNG bunkering infrastructure in Santander, a strategic port in the North of Spain

    €6.3m

    CompletedREPSOL · Maritime · Outside the corridors · call 2019 · May 2019 → Jun 2023 · investment €31.6m

  • Atlantic Corridor. High Speed line Sines/Lisboa-Madrid. Madrid urban node. Study of the Railway Complex of Atocha Station (Phase 3)

    €6m

    CompletedADIF · Rail · Atlantic Corridor · call 2019 · Feb 2020 → Dec 2023 · investment €12m

  • Despliegue de ERTMS en las líneas de cercanías de Barcelona

    €5.2m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Nov 2015 → Dec 2022 · investment €10.4m

  • Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO

    €5.2m

    CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m

  • Operaciones sostenibles de GNL para puertos y transporte marítimo - Acciones piloto innovadoras (GAINN4MOS)

    €5.1m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2014 · Jan 2015 → Sept 2019 · investment €10.3m

  • Eco-gate: corredores europeos para la eficiencia del transporte de gas natural

    €5.1m

    CompletedGas Natural Madrid SDG, S.A. · Road · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2021 · investment €10.2m

  • Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies

    €4.5m

    CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m

  • FEDeRATED

    €4.4m

    CompletedMINISTERIE VAN INFRASTRUCTUUR EN WATERSTAAT (PAÍSES BAJOS) · Multimodal · Outside the corridors · call 2018 · Jan 2019 → Mar 2024 · investment €8.9m

  • Actualización de todas las líneas de alta velocidad españolas a la versión 2.3.0.d. De ERTMS (ETCS+GSMR) 2ª fase

    €4.2m

    CompletedADIF · Rail · Outside the corridors · call 2014 · Apr 2014 → Jun 2022 · investment €8.4m

  • ADS-B Deployment in SW FAB

    €3.8m

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2017 · Apr 2018 → Dec 2023 · investment €7.6m

  • Development of an innovative hydrogen infrastructure hub for TMB public buses and private users in the city of Barcelona

    €3.7m

    CompletedIberdrola Clientes, S.A. · Road · Outside the corridors · call 2019 · Feb 2021 → Dec 2024 · investment €18.7m

  • Desarrollo ferroviario en el Puerto de Castellón: Red Ferroviaria de la Dársena Sur, Puente ferroviario y Conexión norte

    €3.7m

    CompletedAutoridad Portuaria Castellón · Maritime · Outside the corridors · call 2019 · Jan 2020 → Dec 2024 · investment €18.7m

  • Proyecto de validación del Gestor de Tráfico Marítimo.

    €3.6m

    CompletedAdministración Marítima Sueca · Maritime · Outside the corridors · call 2014 · Jan 2015 → Dec 2018 · investment €7.2m

  • ATL_Freight_South_access_to_Bilbao_Port

    €3.5m

    CompletedDirección de Infraestructuras del Transporte. Gobierno Vasco · Rail · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €7m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors across Spain

    €3.3m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €21.9m

  • Cleanport - combustibles alternativos y soluciones para el planchado en frío del puerto: normalización del marco reglamentario obra y demostración de la viabilidad de la explotación

    €3.2m

    CompletedGAS NATURAL SDG, S.A. · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €6.4m

  • Arco atlantico fase II

    €3m

    CompletedDepartment for Transport UK · Road · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2017 · investment €14.8m

  • LNGHIVE2 INFRASTRUCTURE AND LOGISTICS SOLUTIONS

    €2.9m

    CompletedEnagas Transporte, S.A.U. · Maritime · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2023 · investment €14.7m

  • Improvement of rail connectivity, safety and security of the port of Sagunto (CONNECTING SAGUNTO)

    €2.8m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €13.6m

  • Setting up two safe and secure parking areas in the Spanish-French border region

    €2.8m

    CompletedAgencia Guipuzcoana de lnfraestructuras S.A. (BIDEGI S.A.) · Road · Atlantic Corridor · call 2019 · Feb 2020 → Oct 2020 · investment €15.2m

  • Interoperability of the rail system with TAF TSI in TEN-T Corridors (I RAIL)

    €2.7m

    CompletedFundación Valenciaport · Rail · Atlantic and Mediterranean · call 2018 · Jan 2019 → Dec 2023 · investment €6.9m

  • MedTIS III

    €2.7m

    CompletedAssociation des sociétés francaises d'autoroutes (ASFA) (Francia) · Road · Mediterranean Corridor · call 2016 · Feb 2017 → Dec 2021 · investment €13.5m

  • Mejora de las conexiones y el desarrollo de la Plataforma Logística Multimodal en el Puerto de Sevilla, el único puerto interior del sur de Europa.

    €2.7m

    CompletedAutoridad Portuaria de Sevilla · Multimodal · Mediterranean Corridor · call 2015 · Jan 2017 → Mar 2020 · investment €16.2m

  • Bridging Missing Links between FR&SP:Crossborder Railway Section Pau-Zaragoza. Somport Railway Tunnel Reopening

    €2.5m

    CompletedMinisterio de Fomento · Rail · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €8.1m

  • Impulso de la energía combustibles sostenibles para el transporte de mercancías en las autopistas europeas (Bestway)

    €2.5m

    CompletedGas Natural Servicios SDG, SA · Road · Atlantic Corridor · call 2014 · Sept 2014 → Aug 2020 · investment €4.9m

  • Plataforma Intermodal Puerto de Huelva

    €2.5m

    CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2015 · Feb 2016 → Dec 2021 · investment €12.3m

  • Adaptation of Raíces Quay to new traffics

    €2.3m

    CompletedAutoridad Portuaria Avilés · Maritime · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €11.4m

  • Estudio de demostración de la infraestructura asociada a una solución innovadora de tracción de gnl en la explotación ferroviaria

    €2.3m

    CompletedRENFE OPERADORA · Rail · Outside the corridors · call 2016 · Dec 2017 → Mar 2023 · investment €4.7m

  • Green and Connected Ports (GREEN C PORTS)

    €2.3m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2018 · Apr 2019 → Mar 2023 · investment €4.6m

  • MedTIS II

    €2.3m

    CompletedAssociation professionnelle des societes francaises concessionnaires ou exploitantes deautoroutes ou deouvrages routiers (ASFA) · Road · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €11.5m

  • Preparatory Phase (Studies) for the optimization of the accessibility conditions to the Port of Seville

    €2.2m

    CompletedAutoridad Portuaria de Sevilla · Maritime · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €4.3m

  • Bclink_MoS for the future

    €2.1m

    CompletedAutoritá di Sistema Portuale del Mar Tirreno Centro Settentrionale (Italia) · Maritime · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2024 · investment €14.2m

  • Enlace de enlaces faltantes entre FR&ES: estudios para la rehabilitación del tramo ferroviario transfronterizo Pau-Zaragoza

    €2m

    CompletedRégion Nouvelle-Aquitaine · Rail · Outside the corridors · call 2016 · Jul 2017 → Dec 2023 · investment €4m

  • BioLNG EuroNet

    €2m

    CompletedShell Western LNG B.V (Holanda) · Road · Atlantic and Mediterranean · call 2017 · Apr 2018 → Dec 2024 · investment €9.8m

  • LNGHIVE2 Vessels Demand2: Completing Green Links

    €1.9m

    CompletedBalèaria Eurolíneas Marítimas SA · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2022 · investment €12.7m

  • Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport

    €1.9m

    CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m

  • EALINGWorks Valenciaport: Preparation of the electrical grid of the Port of Valencia for Onshore Power Supply

    €1.8m

    CompletedFUNDACIÓN VALENCIAPORT · Maritime · Mediterranean Corridor · call 2019 · Apr 2020 → Dec 2024 · investment €8.6m

  • Caresmatic - apoyo a la distribución de coches y coches eléctricos utilizando las soluciones de las autopistas del mar y promoviendo conceptos de transporte marítimo sostenible.

    €1.7m

    CompletedLuka Koper (Puerto de Koper) · Maritime · Mediterranean Corridor · call 2015 · Mar 2016 → Mar 2020 · investment €5.6m

  • Remodelación del complejo ferroviario de Chamartín en Madrid para adaptar los servicios de Alta Velocidad.

    €1.6m

    CompletedMinisterio de Fomento - Secretaria de Estado de Infraestructuras Transporte y Vivienda · Rail · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2020 · investment €3.2m

  • Proyecto CIRVE

    €1.6m

    CompletedIBIL Gestor de Carga del vehículo eléctrico S.A. · Road · Atlantic and Mediterranean · call 2015 · Jul 2016 → Dec 2021 · investment €3.2m

  • Accesibilidad universal en estaciones de pasajeros

    €1.6m

    CompletedADIF · Rail · Outside the corridors · call 2014 · Sept 2014 → Sept 2018 · investment €5.1m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors in Spain & Portugal

    €1.5m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jan 2021 → Dec 2024 · investment €10m

  • Grupo Ruiz Clean Bus Fleet

    €1.5m

    CompletedEmpresa Martín, S.A. · Road · Outside the corridors · call 2019 · Mar 2020 → Dec 2023 · investment €10.4m

  • Airis-ps. Implantación avanzada de los ris en el puerto de sevilla y guadalquivir euroway: la única vía navegable terrestre de españa en tent core netobra

    €1.4m

    CompletedAutoridad Portuaria de Sevilla · Inland waterways · Mediterranean Corridor · call 2015 · Jan 2017 → Apr 2021 · investment €2.9m

  • Development of LNG bunkering infrastructure in Bilbao, a strategic port in the North of Spain

    €1.3m

    CompletedRepsol LNG Holding S.A. · Maritime · Atlantic Corridor · call 2019 · Sept 2020 → Dec 2023 · investment €13.4m

  • Frigorail - Transporte ferroviario refrigerado entre España, Francia y Bélgica, utilizando corredores TEN-T

    €1.3m

    CompletedCOMSA RAIL TRANSPORT, SA · Rail · Mediterranean Corridor · call 2014 · Sept 2015 → Aug 2019 · investment €6.5m

  • Enlace Vial Transfronterizo en el Corredor Atlántico A25-IP5 Vilar Formoso - A-62 Fuentes de Oñoro

    €1.3m

    CompletedMinistério do Planeamiento e das Infraestruturas (Portugal) · Road · Atlantic Corridor · call 2016 · Feb 2017 → Jun 2021 · investment €12.9m

  • Rail connection to the outer port of the Port of Ferrol

    €1.3m

    CompletedAutoridad Portuaria Ferrol-San Cibrao · Maritime · Outside the corridors · call 2019 · Apr 2019 → Mar 2023 · investment €5.2m

  • Basic infrastructure to improve the commercial competitiveness and sustainability of the Port of Cartagena

    €1.3m

    CompletedAP CARTAGENA · Maritime · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €2.5m

  • Chameleom. Creación de lng road haulage market de forma inteligente y rápida

    €1.3m

    CompletedHam Criogénica · Road · Mediterranean Corridor · call 2015 · Feb 2016 → Jun 2019 · investment €2.5m

  • ECO-Net_Spanish network of alternative fuels refuelling stations

    €1.3m

    CompletedENAGAS · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2023 · investment €12.6m

  • A European FEderated Network of Information eXchange in Logistics (FENIX)

    €1.3m

    CompletedERTICO-ITS EUROPE (Bélgica) · Multimodal · Outside the corridors · call 2018 · Apr 2019 → Dec 2022 · investment €2.5m

  • IMAB. Interconexión de redes, puerto, aeropuerto y gestión óptima del tráfico en el área metropolitana de Barcelona, nodo del corredor europeo mediterráneo.

    €1.3m

    CompletedAyuntamiento Barcelona · Road · Mediterranean Corridor · call 2015 · Apr 2016 → Sept 2022 · investment €2.5m

  • Plan Director para el suministro de energía eléctrica a buques

    €1.2m

    CompletedPuertos del Estado · Maritime · Outside the corridors · call 2015 · Nov 2016 → Dec 2021 · investment €4.3m

  • Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.

    €1.2m

    CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m

  • Despliegue avanzado de soluciones innovadoras para mejorar la gestión y operación del tráfico ferroviario en la red núcleo.

    €1.2m

    CompletedAutoridad Portuaria de Sevilla · Rail · Mediterranean Corridor · call 2016 · Sept 2017 → Dec 2021 · investment €2.4m

  • Variable Gauge for Freight Transport (Eje de Ancho Variable para Mercancías - EAVM)

    €1.1m

    CompletedADIF · Rail · Mediterranean Corridor · call 2018 · Nov 2018 → Jun 2021 · investment €2.3m

  • Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado

    €1m

    CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m

  • Estudios para el desarrollo de un terminal intermodal y área de actividad logística asociada (LAA de Murcia)

    €970,450

    CompletedConsejería de Fomento e Infraestructuras de la Región de Murcia (CARM) · Multimodal · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2022 · investment €1.9m

  • 750-Meter Railway Sidings in Section Zaragoza- Barcelona of the Mediterranean Corridor. ZB750

    €955,370

    CompletedAutoridad Portuaria de Barcelona – Port de Barcelona · Rail · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €1.9m

  • EALING - European flagship Action for coLd ironING in ports

    €949,409

    CompletedFUNDACIÓN VALENCIAPORT · Maritime · Outside the corridors · call 2019 · Jun 2020 → Jun 2023 · investment €1.9m

  • Application of Industry 4.0 Technologies towards Digital Port Container Terminals – iTerminals 4.0

    €943,750

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2018 · Mar 2019 → Dec 2022 · investment €1.9m

  • SOLRED C-ITS Monitorización NetObra (SolC-ITS)

    €905,500

    CompletedSolred S.A. · Road · Outside the corridors · call 2015 · Mar 2016 → Apr 2020 · investment €1.8m

  • AIRIS II-SYNCHRO. Synchromodal Traffic & Transport Information Services

    €850,000

    CompletedAutoridad Portuaria Sevilla · Inland waterways · Mediterranean Corridor · call 2018 · May 2019 → Aug 2022 · investment €1.7m

  • CONCORDA

    €817,500

    CompletedERTICO- ITS Europe · Road · Outside the corridors · call 2016 · Oct 2017 → Jun 2021 · investment €1.6m

  • E-via - movilidad flex-e en at, de, es, fr, it

    €811,575

    CompletedENEL SpA (Italia) · Road · Atlantic and Mediterranean · call 2016 · Jul 2017 → Mar 2022 · investment €1.6m

  • Improvement of the railway connection with the port facilities located in Algeciras Bay

    €806,945

    CompletedAutoridad Portuaria de la Bahía de Algeciras · Multimodal · Outside the corridors · call 2020 · Aug 2021 → Dec 2024 · investment €1.6m

  • Arco atlántico fase III

    €803,600

    CompletedDepartment for Transport (UK) · Road · Atlantic Corridor · call 2016 · Mar 2017 → Dec 2021 · investment €4m

  • Autopista del ferrocarril del Atlántico: cambio modal de todo tipo de semirremolques en el corredor Atlántico

    €762,500

    CompletedMinistère de la Transition Écologique et Solidaire (MTES) · Multimodal · Atlantic Corridor · call 2016 · Feb 2017 → Mar 2024 · investment €1.5m

  • Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"

    €750,000

    CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m

  • Parking seguros

    €750,000

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLíFEROS S.A. · Road · Atlantic and Mediterranean · call 2014 · Jan 2014 → Dec 2017 · investment €1.5m

  • Nueva línea ferroviaria de alta capacidad: travesía central del Transpirineo. Estudios (Fase 2)

    €750,000

    CompletedAEIE TGC PIRINEOS · Rail · Outside the corridors · call 2014 · Mar 2016 → Jun 2020 · investment €1.5m

  • Autocits: regulación estudio de interoperabilidad en la adopción de la conducción autónoma en los nodos urbanos europeos

    €737,700

    CompletedIndra Sistemas, S.A. · Road · Outside the corridors · call 2015 · Nov 2016 → Mar 2019 · investment €1.5m

  • Prevención de incidentes y accidentes con embarcaciones más seguras en los océanos, PICASSO

    €720,575

    CompletedSASEMAR · Maritime · Outside the corridors · call 2015 · May 2016 → Jun 2018 · investment €1.4m

  • Installation of 160 High technology charging points (CPS) to boost electromobility in the Iberian Peninsula corridors

    €706,500

    CompletedEdp Comercial - Comercialização Energia, S. A · Road · Outside the corridors · call 2019 · Dec 2020 → Dec 2024 · investment €4.7m

  • Aplicación del programa de despliegue SESAR 2015 - grupo 1

    €690,932

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2015 · Feb 2016 → Dec 2019 · investment €5.7m

  • Eliminación de cuellos de botella que impiden que el puerto de Cartagena conecte la red central y mejora el tráfico urbano (estudios)

    €647,500

    CompletedAutoridad Portuaria de Cartagena · Maritime · Mediterranean Corridor · call 2016 · Jan 2017 → Dec 2022 · investment €1.3m

  • Análisis de viabilidad sobre la armonización de las categorías de tipos de datos comunes para la red de carreteras y de transporte público (HARMONY)

    €644,185

    CompletedIndra Sistemas S.A · Multimodal · Outside the corridors · call 2014 · Nov 2015 → Dec 2018 · investment €1.3m

  • Vinculación Zaragoza: conectividad urbana con la red central.

    €589,838

    CompletedConsorcio de Transporte del Área de Zaragoza · Rail · Mediterranean Corridor · call 2016 · Feb 2017 → Aug 2019 · investment €1.2m

  • Apoyo a la implantación del ERTMS

    €577,872

    CompletedEEIG ERTMS Users Group · Rail · Outside the corridors · call 2014 · Jan 2015 → Dec 2017 · investment €1.2m

  • Línea de Bizkaia - Múltiples puertos Finlandia - Estonia - Bélgica - Servicio de larga distancia de España, relevante para muchos corredores de redes centrales

    €571,500

    CompletedFinnlines plc. · Maritime · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2016 · investment €1.9m

  • Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1

    €540,000

    CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m

  • I_HeERO

    €535,478

    CompletedNiedersachsisches Ministerium fur Wirtschaft, Arbeit und Verkehr (Germany) · Road · Outside the corridors · call 2014 · Jan 2015 → Mar 2018 · investment €1.1m

  • Corredor Atlántico / Mediterráneo. Nodo urbano de madrid. Estudios de adaptación mejorada e intermodal de la estación de Chamartín y acceso HSL al aeropuerto de Madrid.

    €500,000

    CompletedMinisterio de Fomento · Rail · Atlantic and Mediterranean · call 2015 · May 2016 → Jun 2019 · investment €1m

  • Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal

    €492,500

    CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m

  • Improvement of the Railway Interoperability and Connections with the hinterland of the Port of Huelva

    €480,688

    CompletedAutoridad Portuaria de Huelva · Multimodal · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €961,376

  • Upgrading an old rail yard with a siding for trains with a length of 740 m in Ponferrada (Spain)

    €415,000

    CompletedAyuntamiento de Ponferrada, León, España. · Rail · Outside the corridors · call 2020 · Mar 2021 → Jul 2024 · investment €830,000

  • S/f samueLNG para un arco atlántico azul

    €413,560

    CompletedDragages Ports (Francia) · Maritime · Outside the corridors · call 2015 · Aug 2016 → Jun 2019 · investment €830,000

  • Mejora y fortalecimiento del Corredor de Carga Ferroviaria 6 - Corredor Mediterráneo, incluida la extensión a Croacia.

    €400,000

    CompletedGEIE per il Corridoio Merci 6 EEIG for Rail Freight Corridor 6 · Rail · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2018 · investment €800,000

  • Implementing Telematics Applications for European Interoperability

    €278,340

    CompletedRailNetEurope (Austria) · Rail · Outside the corridors · call 2018 · Jan 2019 → Dec 2023 · investment €560,000

  • Ecobono medatlántico

    €271,340

    CompletedPuertos del Estado · Maritime · Outside the corridors · call 2014 · Jul 2015 → Dec 2018 · investment €540,000

  • SCOOP@F Fase 2

    €210,500

    CompletedMinistere de l'ecologie, du developpement durable et de l'energie (MEDDE) · Road · Outside the corridors · call 2014 · Jan 2016 → Dec 2019 · investment €420,000

  • Saving lives assessing and improving TEN-t road networks safety

    €191,000

    CompletedEUROPEAN ROAD ASSESMENT ASSOCIATION (Bélgica) · Road · Outside the corridors · call 2018 · Apr 2019 → Jul 2021 · investment €380,000

  • Plataforma ITS europea

    €180,500

    CompletedMinistero delle Infrastrutture e dei Trasporti - Direzione territorio, la programmazione e i progetti internazionali · Road · Outside the corridors · call 2014 · Jul 2015 → Dec 2020 · investment €360,000

  • PRISME (PBN Regional Implementation and Sustained Monitoring of EGNOS Performance)

    €179,401

    CompletedPildo Consulting S.L. · Air · Outside the corridors · call 2017 · Sept 2018 → Jul 2022 · investment €360,000

  • SESAR Deployment Programme implementation 2016 – Cluster 2: Cohesion

    €170,141

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2016 · Feb 2017 → Dec 2021 · investment €370,000

  • sAFE

    €153,440

    CompletedOECOM PRODUCT & SERVICES (Alemania) · Road · Outside the corridors · call 2018 · Jan 2019 → Dec 2021 · investment €310,000

  • Connect2LNG

    €100,000

    CompletedUnilever Poland Services Sp. Z.O.O. · Road · Atlantic Corridor · call 2014 · Oct 2015 → Dec 2018 · investment €200,000

  • Aplicación del programa de despliegue SESAR 2015 - grupo 3

    €4,091

    CompletedGestor Despliegue (ENAIRE) · Air · Outside the corridors · call 2015 · Feb 2016 → Feb 2022 · investment €10,000

  • Operaciones sostenibles de gnl para puertos y transporte marítimo - acciones piloto innovadoras

    €1.3m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2014 · Jan 2015 → Oct 2017

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)