The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

31 projects · funding €120m

  • Pruebas futuras del Puerto de Bilbao perteneciente a la red básica del corredor atlántico.

    €23.2m

    CompletedAutoridad Portuaria de Bilbao · Maritime · Atlantic Corridor · call 2014 · Jan 2015 → Oct 2021 · investment €116.2m

  • LNGHIVE2 VESSEL DEMAND: GREEN AND SMART LINKS

    €11.8m

    CompletedBalearia · Maritime · Atlantic and Mediterranean · call 2017 · Apr 2018 → Jul 2021 · investment €59m

  • Mejora de la conexión ferroviaria interior y de la accesibilidad marítima al Puerto de Valencia (CONNECT VALENCIAPORT).

    €11.6m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €55.9m

  • LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay

    €11.3m

    CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m

  • LNGHIVE2 Barcelona- An efficient LNG bunker barge in the port of Barcelona

    €9.2m

    CompletedENAGAS · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2023 · investment €45.8m

  • [LNGHIVE2 Santander] Development of LNG bunkering infrastructure in Santander, a strategic port in the North of Spain

    €6.3m

    CompletedREPSOL · Maritime · Outside the corridors · call 2019 · May 2019 → Jun 2023 · investment €31.6m

  • Operaciones sostenibles de GNL para puertos y transporte marítimo - Acciones piloto innovadoras (GAINN4MOS)

    €5.1m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2014 · Jan 2015 → Sept 2019 · investment €10.3m

  • Desarrollo ferroviario en el Puerto de Castellón: Red Ferroviaria de la Dársena Sur, Puente ferroviario y Conexión norte

    €3.7m

    CompletedAutoridad Portuaria Castellón · Maritime · Outside the corridors · call 2019 · Jan 2020 → Dec 2024 · investment €18.7m

  • Proyecto de validación del Gestor de Tráfico Marítimo.

    €3.6m

    CompletedAdministración Marítima Sueca · Maritime · Outside the corridors · call 2014 · Jan 2015 → Dec 2018 · investment €7.2m

  • Cleanport - combustibles alternativos y soluciones para el planchado en frío del puerto: normalización del marco reglamentario obra y demostración de la viabilidad de la explotación

    €3.2m

    CompletedGAS NATURAL SDG, S.A. · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €6.4m

  • LNGHIVE2 INFRASTRUCTURE AND LOGISTICS SOLUTIONS

    €2.9m

    CompletedEnagas Transporte, S.A.U. · Maritime · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2023 · investment €14.7m

  • Improvement of rail connectivity, safety and security of the port of Sagunto (CONNECTING SAGUNTO)

    €2.8m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €13.6m

  • Adaptation of Raíces Quay to new traffics

    €2.3m

    CompletedAutoridad Portuaria Avilés · Maritime · Outside the corridors · call 2019 · Apr 2019 → Dec 2024 · investment €11.4m

  • Green and Connected Ports (GREEN C PORTS)

    €2.3m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2018 · Apr 2019 → Mar 2023 · investment €4.6m

  • Preparatory Phase (Studies) for the optimization of the accessibility conditions to the Port of Seville

    €2.2m

    CompletedAutoridad Portuaria de Sevilla · Maritime · Outside the corridors · call 2020 · Apr 2021 → Dec 2024 · investment €4.3m

  • Bclink_MoS for the future

    €2.1m

    CompletedAutoritá di Sistema Portuale del Mar Tirreno Centro Settentrionale (Italia) · Maritime · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2024 · investment €14.2m

  • LNGHIVE2 Vessels Demand2: Completing Green Links

    €1.9m

    CompletedBalèaria Eurolíneas Marítimas SA · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2022 · investment €12.7m

  • EALINGWorks Valenciaport: Preparation of the electrical grid of the Port of Valencia for Onshore Power Supply

    €1.8m

    CompletedFUNDACIÓN VALENCIAPORT · Maritime · Mediterranean Corridor · call 2019 · Apr 2020 → Dec 2024 · investment €8.6m

  • Caresmatic - apoyo a la distribución de coches y coches eléctricos utilizando las soluciones de las autopistas del mar y promoviendo conceptos de transporte marítimo sostenible.

    €1.7m

    CompletedLuka Koper (Puerto de Koper) · Maritime · Mediterranean Corridor · call 2015 · Mar 2016 → Mar 2020 · investment €5.6m

  • Development of LNG bunkering infrastructure in Bilbao, a strategic port in the North of Spain

    €1.3m

    CompletedRepsol LNG Holding S.A. · Maritime · Atlantic Corridor · call 2019 · Sept 2020 → Dec 2023 · investment €13.4m

  • Rail connection to the outer port of the Port of Ferrol

    €1.3m

    CompletedAutoridad Portuaria Ferrol-San Cibrao · Maritime · Outside the corridors · call 2019 · Apr 2019 → Mar 2023 · investment €5.2m

  • Basic infrastructure to improve the commercial competitiveness and sustainability of the Port of Cartagena

    €1.3m

    CompletedAP CARTAGENA · Maritime · Outside the corridors · call 2020 · Mar 2021 → Dec 2024 · investment €2.5m

  • Plan Director para el suministro de energía eléctrica a buques

    €1.2m

    CompletedPuertos del Estado · Maritime · Outside the corridors · call 2015 · Nov 2016 → Dec 2021 · investment €4.3m

  • EALING - European flagship Action for coLd ironING in ports

    €949,409

    CompletedFUNDACIÓN VALENCIAPORT · Maritime · Outside the corridors · call 2019 · Jun 2020 → Jun 2023 · investment €1.9m

  • Application of Industry 4.0 Technologies towards Digital Port Container Terminals – iTerminals 4.0

    €943,750

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2018 · Mar 2019 → Dec 2022 · investment €1.9m

  • Prevención de incidentes y accidentes con embarcaciones más seguras en los océanos, PICASSO

    €720,575

    CompletedSASEMAR · Maritime · Outside the corridors · call 2015 · May 2016 → Jun 2018 · investment €1.4m

  • Eliminación de cuellos de botella que impiden que el puerto de Cartagena conecte la red central y mejora el tráfico urbano (estudios)

    €647,500

    CompletedAutoridad Portuaria de Cartagena · Maritime · Mediterranean Corridor · call 2016 · Jan 2017 → Dec 2022 · investment €1.3m

  • Línea de Bizkaia - Múltiples puertos Finlandia - Estonia - Bélgica - Servicio de larga distancia de España, relevante para muchos corredores de redes centrales

    €571,500

    CompletedFinnlines plc. · Maritime · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2016 · investment €1.9m

  • S/f samueLNG para un arco atlántico azul

    €413,560

    CompletedDragages Ports (Francia) · Maritime · Outside the corridors · call 2015 · Aug 2016 → Jun 2019 · investment €830,000

  • Ecobono medatlántico

    €271,340

    CompletedPuertos del Estado · Maritime · Outside the corridors · call 2014 · Jul 2015 → Dec 2018 · investment €540,000

  • Operaciones sostenibles de gnl para puertos y transporte marítimo - acciones piloto innovadoras

    €1.3m

    CompletedFundación Valenciaport · Maritime · Outside the corridors · call 2014 · Jan 2015 → Oct 2017

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)