Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

53 projects · funding €395.5m

  • Implementación del ancho UIC (fase 1) en el tramo Valencia-Tarragona-Barcelona del corredor Mediterráneo.

    €124.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €311.2m

  • Implantacion del ancho UIC en el tramo Castellbisbal-Vilaseca. Corredor Mediterráneo.

    €57m

    CompletedADIF · Rail · Mediterranean Corridor · call 2017 · Jul 2017 → Dec 2024 · investment €285m

  • Mediterranean Corridor. Section Valencia-Sagunto-Castellón. Implementation of UIC gauge. Phase 2."

    €41.5m

    CompletedADIF · Rail · Mediterranean Corridor · call 2019 · Feb 2020 → Dec 2024 · investment €103.8m

  • IBERDROLA SMART MOBILITY

    €13.4m

    CompletedIBERDROLA CLIENTES, S.A. · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2022 · investment €89.2m

  • LNGHIVE2 VESSEL DEMAND: GREEN AND SMART LINKS

    €11.8m

    CompletedBalearia · Maritime · Atlantic and Mediterranean · call 2017 · Apr 2018 → Jul 2021 · investment €59m

  • Mejora de la conexión ferroviaria interior y de la accesibilidad marítima al Puerto de Valencia (CONNECT VALENCIAPORT).

    €11.6m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €55.9m

  • Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.

    €11.4m

    CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m

  • LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay

    €11.3m

    CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m

  • Implementation of Voice over IP (VoIP) in Barcelona ACC

    €10.8m

    CompletedSESAR Deployment Manager (NATs en route) · Air · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2023 · investment €21.7m

  • TB CLEAN URBAN TRANSPORT FLEET RENEWAL

    €9.2m

    CompletedTransports de Barcelona S.A · Road · Mediterranean Corridor · call 2019 · Jan 2020 → Dec 2024 · investment €47.6m

  • LNGHIVE2 Barcelona- An efficient LNG bunker barge in the port of Barcelona

    €9.2m

    CompletedENAGAS · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2023 · investment €45.8m

  • Project Everest

    €7.3m

    CompletedNORDIAN CPO, SL · Road · Atlantic and Mediterranean · call 2019 · Aug 2020 → Jun 2023 · investment €48.9m

  • Despliegue de ERTMS en las líneas de cercanías de Barcelona

    €5.2m

    CompletedADIF · Rail · Mediterranean Corridor · call 2014 · Nov 2015 → Dec 2022 · investment €10.4m

  • Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO

    €5.2m

    CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m

  • Eco-gate: corredores europeos para la eficiencia del transporte de gas natural

    €5.1m

    CompletedGas Natural Madrid SDG, S.A. · Road · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2021 · investment €10.2m

  • Madrid Vicálvaro Freight Railway Terminal.Works Phase 1.Subphase 1A. Mediterranean Corridor. Rail Works and Road Studies

    €4.5m

    CompletedADIF · Multimodal · Mediterranean Corridor · call 2018 · Nov 2018 → Dec 2023 · investment €21.1m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors across Spain

    €3.3m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €21.9m

  • Cleanport - combustibles alternativos y soluciones para el planchado en frío del puerto: normalización del marco reglamentario obra y demostración de la viabilidad de la explotación

    €3.2m

    CompletedGAS NATURAL SDG, S.A. · Maritime · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €6.4m

  • LNGHIVE2 INFRASTRUCTURE AND LOGISTICS SOLUTIONS

    €2.9m

    CompletedEnagas Transporte, S.A.U. · Maritime · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2023 · investment €14.7m

  • Interoperability of the rail system with TAF TSI in TEN-T Corridors (I RAIL)

    €2.7m

    CompletedFundación Valenciaport · Rail · Atlantic and Mediterranean · call 2018 · Jan 2019 → Dec 2023 · investment €6.9m

  • MedTIS III

    €2.7m

    CompletedAssociation des sociétés francaises d'autoroutes (ASFA) (Francia) · Road · Mediterranean Corridor · call 2016 · Feb 2017 → Dec 2021 · investment €13.5m

  • Mejora de las conexiones y el desarrollo de la Plataforma Logística Multimodal en el Puerto de Sevilla, el único puerto interior del sur de Europa.

    €2.7m

    CompletedAutoridad Portuaria de Sevilla · Multimodal · Mediterranean Corridor · call 2015 · Jan 2017 → Mar 2020 · investment €16.2m

  • Green and Connected Ports (GREEN C PORTS)

    €2.3m

    CompletedFundación Valenciaport · Maritime · Mediterranean Corridor · call 2018 · Apr 2019 → Mar 2023 · investment €4.6m

  • MedTIS II

    €2.3m

    CompletedAssociation professionnelle des societes francaises concessionnaires ou exploitantes deautoroutes ou deouvrages routiers (ASFA) · Road · Mediterranean Corridor · call 2014 · Jan 2014 → Dec 2018 · investment €11.5m

  • Bclink_MoS for the future

    €2.1m

    CompletedAutoritá di Sistema Portuale del Mar Tirreno Centro Settentrionale (Italia) · Maritime · Mediterranean Corridor · call 2017 · Jan 2018 → Dec 2024 · investment €14.2m

  • BioLNG EuroNet

    €2m

    CompletedShell Western LNG B.V (Holanda) · Road · Atlantic and Mediterranean · call 2017 · Apr 2018 → Dec 2024 · investment €9.8m

  • LNGHIVE2 Vessels Demand2: Completing Green Links

    €1.9m

    CompletedBalèaria Eurolíneas Marítimas SA · Maritime · Mediterranean Corridor · call 2019 · Mar 2020 → Dec 2022 · investment €12.7m

  • Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport

    €1.9m

    CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m

  • EALINGWorks Valenciaport: Preparation of the electrical grid of the Port of Valencia for Onshore Power Supply

    €1.8m

    CompletedFUNDACIÓN VALENCIAPORT · Maritime · Mediterranean Corridor · call 2019 · Apr 2020 → Dec 2024 · investment €8.6m

  • Caresmatic - apoyo a la distribución de coches y coches eléctricos utilizando las soluciones de las autopistas del mar y promoviendo conceptos de transporte marítimo sostenible.

    €1.7m

    CompletedLuka Koper (Puerto de Koper) · Maritime · Mediterranean Corridor · call 2015 · Mar 2016 → Mar 2020 · investment €5.6m

  • Remodelación del complejo ferroviario de Chamartín en Madrid para adaptar los servicios de Alta Velocidad.

    €1.6m

    CompletedMinisterio de Fomento - Secretaria de Estado de Infraestructuras Transporte y Vivienda · Rail · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2020 · investment €3.2m

  • Proyecto CIRVE

    €1.6m

    CompletedIBIL Gestor de Carga del vehículo eléctrico S.A. · Road · Atlantic and Mediterranean · call 2015 · Jul 2016 → Dec 2021 · investment €3.2m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors in Spain & Portugal

    €1.5m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jan 2021 → Dec 2024 · investment €10m

  • Airis-ps. Implantación avanzada de los ris en el puerto de sevilla y guadalquivir euroway: la única vía navegable terrestre de españa en tent core netobra

    €1.4m

    CompletedAutoridad Portuaria de Sevilla · Inland waterways · Mediterranean Corridor · call 2015 · Jan 2017 → Apr 2021 · investment €2.9m

  • Frigorail - Transporte ferroviario refrigerado entre España, Francia y Bélgica, utilizando corredores TEN-T

    €1.3m

    CompletedCOMSA RAIL TRANSPORT, SA · Rail · Mediterranean Corridor · call 2014 · Sept 2015 → Aug 2019 · investment €6.5m

  • Chameleom. Creación de lng road haulage market de forma inteligente y rápida

    €1.3m

    CompletedHam Criogénica · Road · Mediterranean Corridor · call 2015 · Feb 2016 → Jun 2019 · investment €2.5m

  • ECO-Net_Spanish network of alternative fuels refuelling stations

    €1.3m

    CompletedENAGAS · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2023 · investment €12.6m

  • IMAB. Interconexión de redes, puerto, aeropuerto y gestión óptima del tráfico en el área metropolitana de Barcelona, nodo del corredor europeo mediterráneo.

    €1.3m

    CompletedAyuntamiento Barcelona · Road · Mediterranean Corridor · call 2015 · Apr 2016 → Sept 2022 · investment €2.5m

  • Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.

    €1.2m

    CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m

  • Despliegue avanzado de soluciones innovadoras para mejorar la gestión y operación del tráfico ferroviario en la red núcleo.

    €1.2m

    CompletedAutoridad Portuaria de Sevilla · Rail · Mediterranean Corridor · call 2016 · Sept 2017 → Dec 2021 · investment €2.4m

  • Variable Gauge for Freight Transport (Eje de Ancho Variable para Mercancías - EAVM)

    €1.1m

    CompletedADIF · Rail · Mediterranean Corridor · call 2018 · Nov 2018 → Jun 2021 · investment €2.3m

  • Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado

    €1m

    CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m

  • Estudios para el desarrollo de un terminal intermodal y área de actividad logística asociada (LAA de Murcia)

    €970,450

    CompletedConsejería de Fomento e Infraestructuras de la Región de Murcia (CARM) · Multimodal · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2022 · investment €1.9m

  • AIRIS II-SYNCHRO. Synchromodal Traffic & Transport Information Services

    €850,000

    CompletedAutoridad Portuaria Sevilla · Inland waterways · Mediterranean Corridor · call 2018 · May 2019 → Aug 2022 · investment €1.7m

  • E-via - movilidad flex-e en at, de, es, fr, it

    €811,575

    CompletedENEL SpA (Italia) · Road · Atlantic and Mediterranean · call 2016 · Jul 2017 → Mar 2022 · investment €1.6m

  • Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"

    €750,000

    CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m

  • Parking seguros

    €750,000

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLíFEROS S.A. · Road · Atlantic and Mediterranean · call 2014 · Jan 2014 → Dec 2017 · investment €1.5m

  • Eliminación de cuellos de botella que impiden que el puerto de Cartagena conecte la red central y mejora el tráfico urbano (estudios)

    €647,500

    CompletedAutoridad Portuaria de Cartagena · Maritime · Mediterranean Corridor · call 2016 · Jan 2017 → Dec 2022 · investment €1.3m

  • Vinculación Zaragoza: conectividad urbana con la red central.

    €589,838

    CompletedConsorcio de Transporte del Área de Zaragoza · Rail · Mediterranean Corridor · call 2016 · Feb 2017 → Aug 2019 · investment €1.2m

  • Acceso de calibre estándar entre la Plataforma Multimodal de La Llagosta y el Corredor Mediterráneo y adaptación a 750 metros de longitud. Estudios. Fase 1

    €540,000

    CompletedADIF · Multimodal · Mediterranean Corridor · call 2015 · Oct 2016 → Dec 2021 · investment €1.1m

  • Corredor Atlántico / Mediterráneo. Nodo urbano de madrid. Estudios de adaptación mejorada e intermodal de la estación de Chamartín y acceso HSL al aeropuerto de Madrid.

    €500,000

    CompletedMinisterio de Fomento · Rail · Atlantic and Mediterranean · call 2015 · May 2016 → Jun 2019 · investment €1m

  • Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal

    €492,500

    CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m

  • Mejora y fortalecimiento del Corredor de Carga Ferroviaria 6 - Corredor Mediterráneo, incluida la extensión a Croacia.

    €400,000

    CompletedGEIE per il Corridoio Merci 6 EEIG for Rail Freight Corridor 6 · Rail · Mediterranean Corridor · call 2014 · Jan 2015 → Dec 2018 · investment €800,000

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)