Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

7 projects · funding €24.3m

  • Intermodal Platform of the Port of Huelva II: a boost to multimodality, connectivity and sustainability

    €6.7m

    OngoingAutoridad Portuaria de Huelva · Multimodal · Atlantic Corridor · call CEF-T-2022-COREGEN · Oct 2022 → Apr 2025 · investment €22.4m

  • Plataforma logística intermodal en el suroeste de Europa

    €7.6m

    CompletedGobierno de Extremadura · Multimodal · Atlantic Corridor · call 2014 · Apr 2014 → Sept 2022 · investment €35.8m

  • Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO

    €5.2m

    CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m

  • Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport

    €1.9m

    CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m

  • Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.

    €1.2m

    CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m

  • Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado

    €1m

    CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m

  • Autopista del ferrocarril del Atlántico: cambio modal de todo tipo de semirremolques en el corredor Atlántico

    €762,500

    CompletedMinistère de la Transition Écologique et Solidaire (MTES) · Multimodal · Atlantic Corridor · call 2016 · Feb 2017 → Mar 2024 · investment €1.5m

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)