Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

39 projects · funding €338.9m

  • TANGERINE

    €40.6m

    OngoingIberdrola Clientes SA (IBCLI) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €40.6m

  • Accelerate Europe’s key infrastructure - GENERAL

    €23.4m

    OngoingTesla Italy SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €23.4m

  • PALLANTIA

    €22.5m

    OngoingGrupo Easycharger SA · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €22.5m

  • Smart Electrification Infrastructure for the Urban Surface

    €15.4m

    OngoingEMT · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €51.2m

  • HY2MOVE1

    €12.8m

    OngoingRepsol Comercial de Productos Petrolíferos (RCPP) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Dec 2022 → Oct 2025 · investment €42.8m

  • Accelerating on-the-go EV ultra-fast charging network in Italy, France, Spain and Portugal

    €11.4m

    OngoingAtlante SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Apr 2023 → Apr 2026 · investment €11.4m

  • 2023 Arnedo Secure Ecopark

    €7.9m

    OngoingINMO-ARNEDO S.L.U · Road · Atlantic Corridor · call CEF-T-2023 · Oct 2024 → Mar 2026 · investment €18.5m

  • INSPIRA MADRID

    €7.4m

    OngoingFRV-X · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €24.6m

  • Mediterranean-Atlantic Transport Intelligent Systems

    €6.7m

    OngoingASFA · Road · Atlantic and Mediterranean · call CEF-T-2022-SIMOBGEN · Jan 2023 → Jan 2027 · investment €13.5m

  • Next Wav-E: Developing an EU-wide network of electric vehicles’ high-power charging infrastructure for the electrification of mobility and decarbonisation of the road transport sector

    €6m

    OngoingENEL X WAY · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Nov 2022 → Nov 2025 · investment €6m

  • Southern European EV fast-charging network (Italy, France, Spain)

    €5.8m

    OngoingAtlante SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025 · investment €5.8m

  • Improvements on the road access to the maritime port of Bilbao and its connectivity with other critical infrastructures in the Biscay region

    €5.1m

    OngoingDIPUTACION FORAL DE BIZKAIA · Road · Atlantic Corridor · call CEF-T-2022-MILMOB · Sept 2022 → Mar 2026 · investment €10.2m

  • Ultrafast e-mobility infrastructure in ES-PT Mediterranean

    €4.5m

    OngoingCEPSA COMERCIAL PETROLEO SA (CCP) · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €4.5m

  • Spanish Safe and Secure Truck Parking Area Network

    €3.1m

    OngoingGP Límite Andamur SL · Road · Atlantic and Mediterranean · call CEF-T-2021-SAFEMOBGEN · Mar 2022 → Sept 2025 · investment €6.3m

  • Heavy Wav-E, Mediterranean ultra-fast charging arteria for electric heavy-duty and light-duty vehicles

    €2.8m

    OngoingENEL X WAY · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-4.º corte · Jul 2023 → Dec 2025 · investment €2.8m

  • Safe and secure parking area in Pinto in the South of Madrid on the Atlantic TEN-T Core Network Corridor

    €2.4m

    OngoingAtalaya Patrimonio Inmobiliario S.L · Road · Atlantic and Mediterranean · call CEF-T-2023 · Sept 2024 → Oct 2025 · investment €4.9m

  • Accelerating Europe’s key infrastructure phase II

    €1.8m

    OngoingTesla Motors Netherlands B.V · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-5.º corte · Nov 2023 → Nov 2026 · investment €1.8m

  • Expand-E General: EXpanding Performance and Network Density – Electric

    €28.2m

    OngoingIONITY GMBH · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025

  • AMBRA-E lectrify Europe

    €14.2m

    OngoingEnel X S.r.l. (Italia) · Road · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2022

  • Ultra Fast in Europe

    €50.4m

    OngoingBE CHARGE SRL · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-2.º corte · Jun 2022 → Jun 2025

  • European Hydrogen Network by Hype

    €18.1m

    OngoingHype Assets · Road · Atlantic and Mediterranean · call CEF-T-2021-AFIFGEN-3er. corte · Nov 2022 → Nov 2025

  • IBERDROLA SMART MOBILITY

    €13.4m

    CompletedIBERDROLA CLIENTES, S.A. · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2022 · investment €89.2m

  • Project Everest

    €7.3m

    CompletedNORDIAN CPO, SL · Road · Atlantic and Mediterranean · call 2019 · Aug 2020 → Jun 2023 · investment €48.9m

  • Eco-gate: corredores europeos para la eficiencia del transporte de gas natural

    €5.1m

    CompletedGas Natural Madrid SDG, S.A. · Road · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2021 · investment €10.2m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors across Spain

    €3.3m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €21.9m

  • Arco atlantico fase II

    €3m

    CompletedDepartment for Transport UK · Road · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2017 · investment €14.8m

  • Setting up two safe and secure parking areas in the Spanish-French border region

    €2.8m

    CompletedAgencia Guipuzcoana de lnfraestructuras S.A. (BIDEGI S.A.) · Road · Atlantic Corridor · call 2019 · Feb 2020 → Oct 2020 · investment €15.2m

  • Impulso de la energía combustibles sostenibles para el transporte de mercancías en las autopistas europeas (Bestway)

    €2.5m

    CompletedGas Natural Servicios SDG, SA · Road · Atlantic Corridor · call 2014 · Sept 2014 → Aug 2020 · investment €4.9m

  • BioLNG EuroNet

    €2m

    CompletedShell Western LNG B.V (Holanda) · Road · Atlantic and Mediterranean · call 2017 · Apr 2018 → Dec 2024 · investment €9.8m

  • Proyecto CIRVE

    €1.6m

    CompletedIBIL Gestor de Carga del vehículo eléctrico S.A. · Road · Atlantic and Mediterranean · call 2015 · Jul 2016 → Dec 2021 · investment €3.2m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors in Spain & Portugal

    €1.5m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jan 2021 → Dec 2024 · investment €10m

  • Enlace Vial Transfronterizo en el Corredor Atlántico A25-IP5 Vilar Formoso - A-62 Fuentes de Oñoro

    €1.3m

    CompletedMinistério do Planeamiento e das Infraestruturas (Portugal) · Road · Atlantic Corridor · call 2016 · Feb 2017 → Jun 2021 · investment €12.9m

  • ECO-Net_Spanish network of alternative fuels refuelling stations

    €1.3m

    CompletedENAGAS · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2023 · investment €12.6m

  • E-via - movilidad flex-e en at, de, es, fr, it

    €811,575

    CompletedENEL SpA (Italia) · Road · Atlantic and Mediterranean · call 2016 · Jul 2017 → Mar 2022 · investment €1.6m

  • Arco atlántico fase III

    €803,600

    CompletedDepartment for Transport (UK) · Road · Atlantic Corridor · call 2016 · Mar 2017 → Dec 2021 · investment €4m

  • Parking seguros

    €750,000

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLíFEROS S.A. · Road · Atlantic and Mediterranean · call 2014 · Jan 2014 → Dec 2017 · investment €1.5m

  • Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal

    €492,500

    CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m

  • Connect2LNG

    €100,000

    CompletedUnilever Poland Services Sp. Z.O.O. · Road · Atlantic Corridor · call 2014 · Oct 2015 → Dec 2018 · investment €200,000

  • Safe and Secure Parking Areas for Heavy-Duty Vehicles in Spanish Petrol Service Stations

    €494,880

    TerminatedREPSOL · Road · Atlantic and Mediterranean · call 2018 · Nov 2018 → Dec 2022 · investment €2.5m

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)