CEF funding awarded
€2.5bn
Total investment mobilised
€6.4bn
Ongoing projects
68
Largest beneficiary
€451.1m
Where they are
Who receives the most
- 01Ministerio de Fomento3€451.1m
- 02ADIF17€300.9m
- 03Gestor Despliegue (ENAIRE)7€280.3m
- 04ADIF Alta Velocidad7€216.6m
- 05ADMINISTRADOR DE INFRAESTRUCTURAS FERROVIARIAS1€77.8m
- 06BE CHARGE SRL1€50.4m
- 07Iberdrola Clientes SA (IBCLI)1€40.6m
- 08European High Power Charging Beteiligungsgesellschaft mbH1€39.1m
- 09ENAIRE2€37.7m
- 10Autoridad Portuaria de Bilbao2€37.5m
By status
- Completed 127€1.4bn
- Ongoing 68€870.7m
- Terminated 18€128.7m
- In preparation 8€72.7m
By mode
- Rail 47€1.1bn
- Road 74€469.3m
- Air 19€372.7m
- Maritime 49€301m
- Multimodal 29€180.8m
- Inland waterways 2€2.3m
- No mode 1€0
By corridor
- Atlantic Corridor 31€825.4m
- Outside the corridors 97€691.2m
- Mediterranean Corridor 46€558.3m
- Atlantic and Mediterranean 47€384m
Projects
7 projects · funding €68.2m
PALMAS PORT SPHINX DIKE PHASE IV
€20.6m
OngoingA.P. Las Palmas · Maritime · Atlantic Corridor · call CEF-T-2021-COREGEN · Mar 2021 → Jul 2025 · investment €29.5m
CADIZ CONTAINER MULTIMODAL TERMINAL AND LAND ACCESS. PHASE II
€15.6m
OngoingAutoridad Portuaria de la Bahía de Cádiz · Maritime · Atlantic Corridor · call CEF-T-2021-COMPGEN · Oct 2022 → Jun 2026 · investment €52.1m
Bilbao Port Net-Zero Green Onshore Power System for Comprehensive Support & Core TEN-T Cold Ironing Capabilities Expansion in the Atlantic Corridor
€14.3m
OngoingAutoridad Portuaria de Bilbao · Maritime · Atlantic Corridor · call CEF-T-2021-COREGEN · Feb 2022 → Jan 2026 · investment €47.5m
Design and deployment of On-shore powersupply in Algeciras Port
€6.4m
OngoingAP BAHIA DE ALGECIRAS · Maritime · Atlantic and Mediterranean · call CEF-T-2022-COREGEN · Mar 2023 → Jan 2027 · investment €20.3m
Port Real-time Information Smart Management; PRISMA
€5.1m
OngoingAUTORIDAD PORTUARIA DE SEVILLA · Maritime · Atlantic and Mediterranean · call CEF-T-2023 · Jan 2024 → Dec 2027 · investment €10.3m
Works for basic maritime infrastructures, heel and RO-RO ramp, at Raos 9 quay to improve the efficiency of the port of Santander (Cantabria)
€3.5m
OngoingAUTORIDAD PORTUARIA DE SANTANDER · Maritime · Atlantic Corridor · call CEF-T-2023 · Aug 2024 → Jan 2026 · investment €11.9m
European flagship action for cold ironing Works in Gijon Port
€2.6m
OngoingAUTORIDAD PORTUARIA DE GIJON · Maritime · Atlantic Corridor · call CEF-T-2023 · Oct 2024 → Dec 2027 · investment €8.6m
“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.