Trans-European Network · Connecting Europe Facility

What Europe co-funds in Spain

The CEF is the instrument the EU uses to pay for part of the works and studies on the TEN-T network. Here are all the projects with Spanish participation published by the Ministry: who receives them, in which corridor and how much Brussels contributes.

CEF projects · edition 24 April 2025Source · Spanish Ministry of Transport (HERMES)

CEF funding awarded

€2.5bn

221 projects since the 2014 call · Spanish share

Total investment mobilised

€6.4bn

Cost of the projects with Spanish participation

Ongoing projects

68

€870.7m of funding under way

Largest beneficiary

€451.1m

Ministerio de Fomento · 3 projects

Where they are

One dot per project · bright = ongoing
TEN-T atlas

Who receives the most

Cumulative funding

By status

By mode

By corridor

  • Atlantic Corridor 31€825.4m
  • Outside the corridors 97€691.2m
  • Mediterranean Corridor 46€558.3m
  • Atlantic and Mediterranean 47€384m

Projects

39 projects · funding €633.2m

  • Corredor atlántico: tramo Bergara-San Sebastián- Bayona. Estudios y obras y servicios de seguimiento de obras. Fase 1.

    €448.1m

    CompletedMinisterio de Fomento · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2023 · investment €1.1bn

  • Pruebas futuras del Puerto de Bilbao perteneciente a la red básica del corredor atlántico.

    €23.2m

    CompletedAutoridad Portuaria de Bilbao · Maritime · Atlantic Corridor · call 2014 · Jan 2015 → Oct 2021 · investment €116.2m

  • Conexión ferroviaria Aveiro-Salamanca-Medina del Campo: obras en instalaciones y servicios de energía para trabajos de seguimiento.

    €19.6m

    CompletedADIF · Rail · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2022 · investment €49m

  • Línea ferroviaria de alta velocidad Bilbao-Vitoria - Obras de plataforma en las subsecciones Elorroio-Atxondo y Atxondo-Abadino y trabajos de seguimiento.

    €18.1m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · Dec 2015 → Dec 2020 · investment €90.4m

  • IBERDROLA SMART MOBILITY

    €13.4m

    CompletedIBERDROLA CLIENTES, S.A. · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2022 · investment €89.2m

  • LNGHIVE2 VESSEL DEMAND: GREEN AND SMART LINKS

    €11.8m

    CompletedBalearia · Maritime · Atlantic and Mediterranean · call 2017 · Apr 2018 → Jul 2021 · investment €59m

  • Corredor Atlántico. Suministro, instalaciones eléctricas y obras acústicas en la sección Chamartín-Atocha- Torrejón de Velasco del HSRL Madrid-Lisboa y Madrid- Bobadilla.

    €11.4m

    CompletedADIF Alta Velocidad · Rail · Atlantic and Mediterranean · call 2014 · May 2015 → Mar 2018 · investment €38.2m

  • LNGHIVE2 Algeciras - A Flex LNG bunkering facility in the port of Algeciras Bay

    €11.3m

    CompletedENAGAS · Maritime · Atlantic and Mediterranean · call 2019 · Jul 2020 → May 2023 · investment €56.5m

  • Despliegue de ERTMS en el tramo Valladolid-Burgos

    €7.8m

    CompletedADIF Alta Velocidad · Rail · Atlantic Corridor · call 2014 · May 2014 → Dec 2022 · investment €15.6m

  • Plataforma logística intermodal en el suroeste de Europa

    €7.6m

    CompletedGobierno de Extremadura · Multimodal · Atlantic Corridor · call 2014 · Apr 2014 → Sept 2022 · investment €35.8m

  • Project Everest

    €7.3m

    CompletedNORDIAN CPO, SL · Road · Atlantic and Mediterranean · call 2019 · Aug 2020 → Jun 2023 · investment €48.9m

  • Atlantic Corridor. High Speed line Sines/Lisboa-Madrid. Madrid urban node. Study of the Railway Complex of Atocha Station (Phase 3)

    €6m

    CompletedADIF · Rail · Atlantic Corridor · call 2019 · Feb 2020 → Dec 2023 · investment €12m

  • Estudios y obras para conexiones por ferrocarril de 4 terminales de carga existentes a lo largo del Corredor Mediterráneo en España por GRUPO ALONSO

    €5.2m

    CompletedServicios Terrestres y Marítimos S.A. (Grupo ALONSO) · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2022 · investment €21.1m

  • Eco-gate: corredores europeos para la eficiencia del transporte de gas natural

    €5.1m

    CompletedGas Natural Madrid SDG, S.A. · Road · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2021 · investment €10.2m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors across Spain

    €3.3m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €21.9m

  • Arco atlantico fase II

    €3m

    CompletedDepartment for Transport UK · Road · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2017 · investment €14.8m

  • LNGHIVE2 INFRASTRUCTURE AND LOGISTICS SOLUTIONS

    €2.9m

    CompletedEnagas Transporte, S.A.U. · Maritime · Atlantic and Mediterranean · call 2017 · Sept 2018 → Dec 2023 · investment €14.7m

  • Setting up two safe and secure parking areas in the Spanish-French border region

    €2.8m

    CompletedAgencia Guipuzcoana de lnfraestructuras S.A. (BIDEGI S.A.) · Road · Atlantic Corridor · call 2019 · Feb 2020 → Oct 2020 · investment €15.2m

  • Interoperability of the rail system with TAF TSI in TEN-T Corridors (I RAIL)

    €2.7m

    CompletedFundación Valenciaport · Rail · Atlantic and Mediterranean · call 2018 · Jan 2019 → Dec 2023 · investment €6.9m

  • Impulso de la energía combustibles sostenibles para el transporte de mercancías en las autopistas europeas (Bestway)

    €2.5m

    CompletedGas Natural Servicios SDG, SA · Road · Atlantic Corridor · call 2014 · Sept 2014 → Aug 2020 · investment €4.9m

  • BioLNG EuroNet

    €2m

    CompletedShell Western LNG B.V (Holanda) · Road · Atlantic and Mediterranean · call 2017 · Apr 2018 → Dec 2024 · investment €9.8m

  • Upgrading infrastructure at Seville Port to improve interconnection between the waterway and rail and maritime transport

    €1.9m

    CompletedAP SEVILLA · Multimodal · Atlantic and Mediterranean · call 2019 · Jul 2020 → Dec 2024 · investment €9.4m

  • Remodelación del complejo ferroviario de Chamartín en Madrid para adaptar los servicios de Alta Velocidad.

    €1.6m

    CompletedMinisterio de Fomento - Secretaria de Estado de Infraestructuras Transporte y Vivienda · Rail · Atlantic and Mediterranean · call 2016 · Feb 2017 → Dec 2020 · investment €3.2m

  • Proyecto CIRVE

    €1.6m

    CompletedIBIL Gestor de Carga del vehículo eléctrico S.A. · Road · Atlantic and Mediterranean · call 2015 · Jul 2016 → Dec 2021 · investment €3.2m

  • Development of a network of alternative fuel technology in the Atlantic and Mediterranean corridors in Spain & Portugal

    €1.5m

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLÍFEROS, S.A. (RCPP) · Road · Atlantic and Mediterranean · call 2019 · Jan 2021 → Dec 2024 · investment €10m

  • Development of LNG bunkering infrastructure in Bilbao, a strategic port in the North of Spain

    €1.3m

    CompletedRepsol LNG Holding S.A. · Maritime · Atlantic Corridor · call 2019 · Sept 2020 → Dec 2023 · investment €13.4m

  • Enlace Vial Transfronterizo en el Corredor Atlántico A25-IP5 Vilar Formoso - A-62 Fuentes de Oñoro

    €1.3m

    CompletedMinistério do Planeamiento e das Infraestruturas (Portugal) · Road · Atlantic Corridor · call 2016 · Feb 2017 → Jun 2021 · investment €12.9m

  • ECO-Net_Spanish network of alternative fuels refuelling stations

    €1.3m

    CompletedENAGAS · Road · Atlantic and Mediterranean · call 2019 · Mar 2020 → Dec 2023 · investment €12.6m

  • Corredor Med / Atl. Tramo: Algeciras- Madrid - Zaragoza - Barcelona. Madrid- Vicálvaro actualización de la terminal ferroviaria de mercancías. Estudios. Fase 1.

    €1.2m

    CompletedADIF · Multimodal · Atlantic and Mediterranean · call 2014 · Jan 2016 → Dec 2018 · investment €2.4m

  • Entrega de carga con bajo nivel de ruido y baja emisión de carbono para los operadores postales para asegurar las conexiones de la última milla a través del transporte urbano y de larga distancia optimizado

    €1m

    CompletedSociedad Estatal Correos y Telégrafos, S.A. · Multimodal · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2020 · investment €2.1m

  • E-via - movilidad flex-e en at, de, es, fr, it

    €811,575

    CompletedENEL SpA (Italia) · Road · Atlantic and Mediterranean · call 2016 · Jul 2017 → Mar 2022 · investment €1.6m

  • Arco atlántico fase III

    €803,600

    CompletedDepartment for Transport (UK) · Road · Atlantic Corridor · call 2016 · Mar 2017 → Dec 2021 · investment €4m

  • Autopista del ferrocarril del Atlántico: cambio modal de todo tipo de semirremolques en el corredor Atlántico

    €762,500

    CompletedMinistère de la Transition Écologique et Solidaire (MTES) · Multimodal · Atlantic Corridor · call 2016 · Feb 2017 → Mar 2024 · investment €1.5m

  • Parking seguros

    €750,000

    CompletedREPSOL COMERCIAL DE PRODUCTOS PETROLíFEROS S.A. · Road · Atlantic and Mediterranean · call 2014 · Jan 2014 → Dec 2017 · investment €1.5m

  • Estudio de los anchos de vía en los Corredores Ferroviarios para los servicios de "Autopistas Ferroviarias"

    €750,000

    CompletedADIF · Rail · Atlantic and Mediterranean · call 2016 · Jul 2017 → Dec 2023 · investment €1.5m

  • Línea de Bizkaia - Múltiples puertos Finlandia - Estonia - Bélgica - Servicio de larga distancia de España, relevante para muchos corredores de redes centrales

    €571,500

    CompletedFinnlines plc. · Maritime · Atlantic Corridor · call 2014 · Jan 2014 → Dec 2016 · investment €1.9m

  • Corredor Atlántico / Mediterráneo. Nodo urbano de madrid. Estudios de adaptación mejorada e intermodal de la estación de Chamartín y acceso HSL al aeropuerto de Madrid.

    €500,000

    CompletedMinisterio de Fomento · Rail · Atlantic and Mediterranean · call 2015 · May 2016 → Jun 2019 · investment €1m

  • Despliegue de estaciones de autogás en diferentes áreas metropolitanas entre España y Portugal

    €492,500

    CompletedREPSOL BUTANO · Road · Atlantic and Mediterranean · call 2015 · Feb 2016 → Dec 2019 · investment €2.5m

  • Connect2LNG

    €100,000

    CompletedUnilever Poland Services Sp. Z.O.O. · Road · Atlantic Corridor · call 2014 · Oct 2015 → Dec 2018 · investment €200,000

“Funding” is the CEF grant awarded to the Spanish part of each action; “investment” is the total cost of that part. A single European project may be split across several countries: only the Spanish share appears here. Status as reported by the Ministry: ongoing, completed, terminated or in preparation. Project titles are the EU’s official ones; the Ministry publishes descriptions in Spanish only.

NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)