EED Sector Data · Indonesia

Belawan in the CPPI port efficiency ranking

Belawan ranks 263rd in the world in the 2025 CPPI and 6th in Indonesia, with a score of -10.3. Operational performance in the Container Port Performance Index (CPPI), an indicator based on the observed time container ships spend in port. This profile covers the port as a whole, not a specific terminal.
IDBLW2025 editionSouth East Asia
Global rank263rdPublished ranking · 2025
CPPI score-10.3-6.3 vs 2024
Rank in Indonesia6thAmong the ports included in the edition
Port calls in the sample14976.3% of the time at berth

Standardised series

Score trend

The series shown is the one recalculated in the 2025 edition; a later edition may revise earlier years.

1 is the best rank

Global ranking trend

Ranks before 2025 are derived by ordering the standardised series when the annex does not publish the historical ranking.

Traceability

Series included in this edition

Observed yearScoreGlobal rankRank type
2025-10.3263rdPublished
2024-4233rdDerived by EED
2023-13282ndDerived by EED
20221190thDerived by EED
20210230thDerived by EED
202011215thDerived by EED

Global ranking 2025

The nearest ports in the ranking

± 4 places
WorldPortScoreΔ scoreΔ rank
259thOnneNigeria-8.9+16.1+47 places
260thPort MoresbyPapua New Guinea-9.3-4.3-23 places
261stFelixstoweUnited Kingdom-9.5+23.5+56 places
262ndManzanilloMexico-9.5+151.5+110 places
263rdBelawanThis port-10.3-6.3-30 places
264thBremerhavenGermany-10.4-17.4-101 places
265thPoint Lisas PortTrinidad & Tobago-10.6+10.4+31 places
266thCaucedoDominican Republic-11.1+14.9+44 places
267thManausBrazil-11.2+8.8+27 places

Beyond the CPPI

The figure needs context

Arrival patterns, weather, draught or tidal restrictions, fleet mix, call size, route disruptions, geopolitical crises and global congestion can all affect the result. The CPPI is an operational benchmark; on its own it does not attribute causes or responsibilities.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)