Port profile · Maritime Radar

Port of Lome daily activity

Lome handled an estimated average of 29 kt a day in the week ending 25 September 2026 (-46.5% year on year), with an average of 4 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Togo · LOCODE TGLFW · Main cargo sectors: Mineral Products, Vegetable Products, Prepared Foodstuffs & Beverages

Data up to · 25 September 2026

7-day average · Estimated total volume

29 kt

28-day average

37 kt

Vs 28-day average

-21.8%

Year on year (same week)

-46.5%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container69418 kt205 kt
Dry bulk11225 kt1.6 kt
General cargo144.9 kt56 kt
Ro-Ro32.6 kt202 t
Tanker13117 kt6.4 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Tema: 23,417 t/day estimated with LomeTemaLagos: 11,834 t/day estimated with LomeLagosAbidjan: 8,801 t/day estimated with LomeAbidjanCotonou: 8,215 t/day estimated with LomeCotonouColombo: 6,501 t/day estimated with LomeColomboOnne: 3,423 t/day estimated with LomeOnneSingapore: 3,380 t/day estimated with LomeSingaporeAlgeciras: 2,666 t/day estimated with LomeAlgecirasLas Palmas (de Gran Canaria): 2,214 t/day estimated with LomeLas Palmas (de Gran Canaria)Dakar: 2,013 t/day estimated with LomeDakarDouala: 1,896 t/day estimated with LomeDoualaTanjung Pelepas: 1,828 t/day estimated with LomeTanjung PelepasLuanda: 1,496 t/day estimated with LomeLuandaWalvis Bay: 1,445 t/day estimated with LomeWalvis BayTakoradi: 1,431 t/day estimated with LomeTakoradiTangier-Mediterranean: 1,409 t/day estimated with LomeTangier-MediterraneanSan Pedro: 1,284 t/day estimated with LomeSan PedroPort Owendo: 1,179 t/day estimated with LomePort OwendoDurban: 1,106 t/day estimated with LomeDurbanPoint Noire: 1,105 t/day estimated with LomePoint NoireMundra: 1,094 t/day estimated with LomeMundraCape Town: 1,047 t/day estimated with LomeCape TownNovorossiysk: 913 t/day estimated with LomeNovorossiyskFreetown: 888 t/day estimated with LomeFreetownConakry: 847 t/day estimated with LomeConakryNgqura: 786 t/day estimated with LomeNgquraPort Klang: 748 t/day estimated with LomePort KlangPort Louis: 743 t/day estimated with LomePort LouisAntwerp: 651 t/day estimated with LomeAntwerpPort Harcourt: 589 t/day estimated with LomePort HarcourtMumbai-Jawaharlal Nehru (Nhava Sheva): 548 t/day estimated with LomeMumbai-Jawaharlal Nehru (Nhava Sheva)Santos: 515 t/day estimated with LomeSantosAgioi Oil Terminal: 500 t/day estimated with LomeAgioi Oil TerminalBata: 454 t/day estimated with LomeBataPort Elizabeth: 441 t/day estimated with LomePort ElizabethMonrovia: 438 t/day estimated with LomeMonroviaVisakhapatnam: 388 t/day estimated with LomeVisakhapatnamDammam: 349 t/day estimated with LomeDammamPorto De Suape: 334 t/day estimated with LomePorto De SuapeKakinada: 317 t/day estimated with LomeKakinadaHouston (US-TX): 283 t/day estimated with LomeHouston (US-TX)Yakacik: 274 t/day estimated with LomeYakacikDjen Djen: 256 t/day estimated with LomeDjen DjenRotterdam: 242 t/day estimated with LomeRotterdamQinzhou: 237 t/day estimated with LomeQinzhouSines: 234 t/day estimated with LomeSinesNemrut Bay: 224 t/day estimated with LomeNemrut BayGarrucha: 216 t/day estimated with LomeGarruchaVentspils: 210 t/day estimated with LomeVentspilsOran: 205 t/day estimated with LomeOranMalaga: 198 t/day estimated with LomeMalagaSanta Cruz De Tenerife: 196 t/day estimated with LomeSanta Cruz De TenerifeAliaga: 196 t/day estimated with LomeAliagaAmsterdam: 194 t/day estimated with LomeAmsterdamValencia: 185 t/day estimated with LomeValenciaNew York-New Jersey: 182 t/day estimated with LomeNew York-New JerseyEl Dekheila: 180 t/day estimated with LomeEl DekheilaPort-De-Bouc: 177 t/day estimated with LomePort-De-BoucPort De Kribi: 176 t/day estimated with LomePort De KribiParanaguá: 162 t/day estimated with LomeParanaguáTianjin Xin Gang: 153 t/day estimated with LomeDamietta: 151 t/day estimated with LomeLobito: 150 t/day estimated with LomeLimboh: 146 t/day estimated with LomeUst-Luga: 145 t/day estimated with LomeCorpus Christi: 144 t/day estimated with LomeSapele: 139 t/day estimated with LomeKarachi: 134 t/day estimated with LomeCai Mep: 132 t/day estimated with LomeBintulu: 129 t/day estimated with LomeYarimca: 124 t/day estimated with LomeTarragona: 119 t/day estimated with LomeAgadir: 118 t/day estimated with LomeGioia Tauro: 118 t/day estimated with LomeItajaí: 116 t/day estimated with LomeRouen: 116 t/day estimated with LomeKhalifa Port: 114 t/day estimated with LomeImmingham: 114 t/day estimated with LomePort Est: 110 t/day estimated with LomeMatadi: 110 t/day estimated with LomeFoynes: 101 t/day estimated with LomeFelixstowe: 99 t/day estimated with LomeTuapse: 97 t/day estimated with LomeThessaloníki: 95 t/day estimated with LomeRichards Bay: 91 t/day estimated with LomeMalabo: 91 t/day estimated with LomeLe Havre: 90 t/day estimated with LomeTuticorin: 86 t/day estimated with LomeBarcelona: 84 t/day estimated with LomeDumai: 83 t/day estimated with LomeQuebec: 82 t/day estimated with LomeRosario: 79 t/day estimated with LomeBuchanan: 78 t/day estimated with LomeMarcus Hook: 75 t/day estimated with LomeJebel Ali: 74 t/day estimated with LomePorto Grande: 74 t/day estimated with LomeJorf Lasfar: 74 t/day estimated with LomeBonny: 74 t/day estimated with LomeVizhinjam: 71 t/day estimated with LomeBaie Comeau: 71 t/day estimated with LomePort Gentil: 70 t/day estimated with LomeYangon: 67 t/day estimated with LomeBotas: 67 t/day estimated with LomeRio De Janeiro: 67 t/day estimated with LomeAnnaba: 66 t/day estimated with LomeSan Martin: 65 t/day estimated with LomeShanghai: 65 t/day estimated with LomeMaputo: 65 t/day estimated with LomeBaltimore: 65 t/day estimated with LomeMina Saqr: 64 t/day estimated with LomeBejaia: 64 t/day estimated with LomeToros Gubre: 62 t/day estimated with LomeNacala: 61 t/day estimated with LomeGdansk: 61 t/day estimated with LomeCarboneras: 61 t/day estimated with LomeBeaumont: 61 t/day estimated with LomeCochin (Kochi): 59 t/day estimated with LomePort De Salvador: 58 t/day estimated with LomeItaqui: 58 t/day estimated with LomeKandla: 57 t/day estimated with LomeGdynia: 53 t/day estimated with LomeSaint Petersburg: 53 t/day estimated with LomeTekirdag: 53 t/day estimated with LomeNouakchott: 52 t/day estimated with LomeHong Kong: 52 t/day estimated with LomeNew Orleans: 51 t/day estimated with LomeBayuquan: 50 t/day estimated with LomeSouth Louisiana: 48 t/day estimated with LomeBeira: 47 t/day estimated with LomeLisboa: 47 t/day estimated with LomeIstanbul: 47 t/day estimated with LomeNewport News: 46 t/day estimated with LomeKrishnapatnam Port: 46 t/day estimated with LomeGebze: 45 t/day estimated with LomeCampana: 45 t/day estimated with LomeKamsar: 44 t/day estimated with LomeAmbarli: 44 t/day estimated with LomeVila Do Conde: 43 t/day estimated with LomeMersin: 43 t/day estimated with LomeFukuyama: 42 t/day estimated with LomeJubail: 41 t/day estimated with LomeMap Ta Phut: 41 t/day estimated with LomeOrmos Aliveriou: 41 t/day estimated with LomePorto de Itaguai: 41 t/day estimated with LomeVlissingen: 41 t/day estimated with LomePorto Di Lido-Venezia: 40 t/day estimated with LomeBeihai: 39 t/day estimated with LomeAugusta: 39 t/day estimated with LomeKoko: 38 t/day estimated with LomeFujairah: 38 t/day estimated with LomeMawan: 37 t/day estimated with LomeAratu: 37 t/day estimated with LomeTaman: 36 t/day estimated with LomeKuantan: 36 t/day estimated with LomeTaboguilla: 35 t/day estimated with LomeIJmuiden: 35 t/day estimated with LomeMongstad: 34 t/day estimated with LomeBissau: 34 t/day estimated with LomeMuhammad Bin Qasim: 33 t/day estimated with LomeSarroch Oil Terminal: 33 t/day estimated with LomeSaldanha Bay: 33 t/day estimated with LomePort Everglades: 33 t/day estimated with LomeFreeport (US-FL): 33 t/day estimated with LomeOranjestad: 28 t/day estimated with LomeNamibe: 28 t/day estimated with LomeDunkirk: 28 t/day estimated with LomeAltamira: 28 t/day estimated with LomeLiverpool: 27 t/day estimated with LomeDongjiakou: 26 t/day estimated with LomeDalian: 26 t/day estimated with LomeJohor: 26 t/day estimated with LomeFangcheng: 25 t/day estimated with LomeSalalah: 25 t/day estimated with LomeConstantza: 24 t/day estimated with LomeNapier: 24 t/day estimated with LomeMontreal: 24 t/day estimated with LomeSão Sebastião: 23 t/day estimated with LomeMurmansk: 23 t/day estimated with LomeHay Point: 23 t/day estimated with LomeLa Baie (Port Alfred): 22 t/day estimated with LomeBotas Natural Gas Terminal: 22 t/day estimated with LomePort Kembla: 22 t/day estimated with LomeVeracruz: 22 t/day estimated with LomeManzanillo: 22 t/day estimated with LomeYanbu (Yanbu city): 22 t/day estimated with LomeVitoria: 22 t/day estimated with LomeAl Adabiyah: 22 t/day estimated with LomeRostock: 22 t/day estimated with LomeNouadhibou: 21 t/day estimated with LomeKing Abdullah Port: 21 t/day estimated with LomeTaranto: 21 t/day estimated with LomeEl Sokhna: 21 t/day estimated with LomeImbituba: 21 t/day estimated with LomeBahia Blanca: 21 t/day estimated with LomeRiga: 21 t/day estimated with LomeIzhevskoye: 21 t/day estimated with LomeCalabar: 21 t/day estimated with LomeWilmington, DE: 21 t/day estimated with LomeSplit: 21 t/day estimated with LomeAlmeria: 21 t/day estimated with LomeLome
click to enable scroll zoom · drag to pan

Full footprint: all 305 connections of Lome aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.TemaGhana2.0 days between calls
  2. 2.AbidjanCôte d'Ivoire2.9 days between calls
  3. 3.ColomboSri Lanka18.1 days between calls
  4. 4.LagosNigeria2.3 days between calls
  5. 5.AlgecirasSpain9.9 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.LagosNigeria2.7 days between calls
  2. 2.TemaGhana2.3 days between calls
  3. 3.CotonouBenin2.8 days between calls
  4. 4.AbidjanCôte d'Ivoire3.9 days between calls
  5. 5.OnneNigeria5.9 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)