Port profile · Maritime Radar

Port of Acajutla daily activity

Acajutla handled an estimated average of 14 kt a day in the week ending 25 September 2026 (+5.8% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
El Salvador · LOCODE SVAQJ · Main cargo sectors: Vegetable Products, Mineral Products, Prepared Foodstuffs & Beverages

Data up to · 25 September 2026

7-day average · Estimated total volume

14 kt

28-day average

20 kt

Vs 28-day average

-27.9%

Year on year (same week)

+5.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container956 kt3.4 kt
Dry bulk16235 kt14 kt
General cargo00 t0 t
Ro-Ro00 t0 t
Tanker18231 kt17 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Puerto Quetzal: 19,623 t/day estimated with AcajutlaPuerto QuetzalCorinto: 4,014 t/day estimated with AcajutlaCorintoNew Orleans: 3,320 t/day estimated with AcajutlaNew OrleansTaboguilla: 2,576 t/day estimated with AcajutlaTaboguillaPuerto Caldera: 1,934 t/day estimated with AcajutlaPuerto CalderaLazaro Cardenas: 1,801 t/day estimated with AcajutlaLazaro CardenasBalboa: 1,719 t/day estimated with AcajutlaBalboaManzanillo: 1,541 t/day estimated with AcajutlaManzanilloLos Angeles-Long Beach: 1,396 t/day estimated with AcajutlaLos Angeles-Long BeachSan Lorenzo (Henecan): 1,219 t/day estimated with AcajutlaSan Lorenzo (Henecan)Vancouver: 961 t/day estimated with AcajutlaVancouverHouston (US-TX): 858 t/day estimated with AcajutlaHouston (US-TX)Buenaventura: 813 t/day estimated with AcajutlaBuenaventuraSouth Louisiana: 772 t/day estimated with AcajutlaSouth LouisianaTianjin Xin Gang: 738 t/day estimated with AcajutlaTianjin Xin GangBayuquan: 538 t/day estimated with AcajutlaBayuquanPuerto Sandino: 504 t/day estimated with AcajutlaPuerto SandinoRichmond, CA: 430 t/day estimated with AcajutlaRichmond, CAKashima-Ibaraki: 416 t/day estimated with AcajutlaKashima-IbarakiCallao: 383 t/day estimated with AcajutlaCallaoVila Do Conde: 369 t/day estimated with AcajutlaVila Do CondeBusan: 321 t/day estimated with AcajutlaBusanVancouver: 306 t/day estimated with AcajutlaVancouverKalama: 304 t/day estimated with AcajutlaKalamaLongview: 293 t/day estimated with AcajutlaLongviewGuaymas: 261 t/day estimated with AcajutlaGuaymasVeracruz: 260 t/day estimated with AcajutlaVeracruzPortland, OR: 240 t/day estimated with AcajutlaPortland, ORShanghai: 229 t/day estimated with AcajutlaShanghaiCorpus Christi: 217 t/day estimated with AcajutlaCorpus ChristiQinzhou: 182 t/day estimated with AcajutlaQinzhouUlsan: 173 t/day estimated with AcajutlaUlsanFangcheng: 172 t/day estimated with AcajutlaFangchengGuayaquil: 163 t/day estimated with AcajutlaGuayaquilPascagoula: 148 t/day estimated with AcajutlaPascagoulaPort Arthur: 145 t/day estimated with AcajutlaPort ArthurStockton: 140 t/day estimated with AcajutlaStocktonMilford Haven: 129 t/day estimated with AcajutlaMilford HavenIncheon: 112 t/day estimated with AcajutlaIncheonLake Charles: 103 t/day estimated with AcajutlaLake CharlesSuzhou (Changshu): 102 t/day estimated with AcajutlaSuzhou (Changshu)Punta Morales: 98 t/day estimated with AcajutlaPunta MoralesSan Juan: 96 t/day estimated with AcajutlaSan JuanNanjing: 94 t/day estimated with AcajutlaNanjingGladstone: 93 t/day estimated with AcajutlaGladstoneDonghae: 89 t/day estimated with AcajutlaDonghaeMontreal: 83 t/day estimated with AcajutlaMontrealItaqui: 80 t/day estimated with AcajutlaItaquiZhoushan: 79 t/day estimated with AcajutlaZhoushanRio Grande: 78 t/day estimated with AcajutlaRio GrandePrince Rupert: 75 t/day estimated with AcajutlaPrince RupertXiamen: 75 t/day estimated with AcajutlaXiamenPuerto Cortes: 72 t/day estimated with AcajutlaPuerto CortesPyeongtaek: 71 t/day estimated with AcajutlaPyeongtaekTampa Port: 71 t/day estimated with AcajutlaTampa PortPuerto Cristobal: 70 t/day estimated with AcajutlaPuerto CristobalMejillones: 68 t/day estimated with AcajutlaMejillonesAltamira: 66 t/day estimated with AcajutlaAltamiraAntofagasta: 60 t/day estimated with AcajutlaAntofagastaKaohsiung: 59 t/day estimated with AcajutlaKaohsiungPohang: 54 t/day estimated with AcajutlaPort De Salvador: 52 t/day estimated with AcajutlaGourd Shanzui: 51 t/day estimated with AcajutlaLongkou Gang: 50 t/day estimated with AcajutlaBontang LNG Terminal: 49 t/day estimated with AcajutlaGuangxi Beibu Gulf Port: 49 t/day estimated with AcajutlaTalcahuano: 47 t/day estimated with AcajutlaSan Martin: 47 t/day estimated with AcajutlaNovorossiysk: 47 t/day estimated with AcajutlaTema: 47 t/day estimated with AcajutlaBaltimore: 45 t/day estimated with AcajutlaMazatlan: 43 t/day estimated with AcajutlaRotterdam: 43 t/day estimated with AcajutlaBayovar: 43 t/day estimated with AcajutlaWilmington, NC: 43 t/day estimated with AcajutlaSantos: 43 t/day estimated with AcajutlaQingdao Port: 42 t/day estimated with AcajutlaAntwerp: 42 t/day estimated with AcajutlaGwangyang (Kwangyang): 42 t/day estimated with AcajutlaTexas City: 39 t/day estimated with AcajutlaTacoma: 37 t/day estimated with AcajutlaLimetree Bay: 36 t/day estimated with AcajutlaSeattle: 36 t/day estimated with AcajutlaPhiladelphia: 34 t/day estimated with AcajutlaIquique: 34 t/day estimated with AcajutlaBahia De Valparaiso: 33 t/day estimated with AcajutlaSan Francisco: 32 t/day estimated with AcajutlaMontoir: 32 t/day estimated with AcajutlaGolfito: 31 t/day estimated with AcajutlaUst-Luga: 30 t/day estimated with AcajutlaLianyungang: 29 t/day estimated with AcajutlaSavannah: 29 t/day estimated with AcajutlaFuzhou: 28 t/day estimated with AcajutlaShougang Jingtang: 28 t/day estimated with AcajutlaOita: 27 t/day estimated with AcajutlaWalvis Bay: 26 t/day estimated with AcajutlaCartagena: 26 t/day estimated with AcajutlaMawan: 26 t/day estimated with AcajutlaManila: 26 t/day estimated with AcajutlaChiba: 26 t/day estimated with AcajutlaDung Quat: 25 t/day estimated with AcajutlaGuangzhou (Nansha): 25 t/day estimated with AcajutlaTaichung: 25 t/day estimated with AcajutlaXiagong: 25 t/day estimated with AcajutlaSubic Bay: 25 t/day estimated with AcajutlaLanqiao Port: 25 t/day estimated with AcajutlaUbe: 24 t/day estimated with AcajutlaGuangdong Yangjiang Port: 24 t/day estimated with AcajutlaMuuga-Port of Tallinn: 24 t/day estimated with AcajutlaBaton Rouge: 24 t/day estimated with AcajutlaTsukumi: 24 t/day estimated with AcajutlaDafeng: 24 t/day estimated with AcajutlaSamsun: 24 t/day estimated with AcajutlaSaganoseki: 24 t/day estimated with AcajutlaTopolobampo: 23 t/day estimated with AcajutlaCai Mep: 23 t/day estimated with AcajutlaXiuyu: 23 t/day estimated with AcajutlaFreeport: 22 t/day estimated with AcajutlaTangshan (Jingtang): 22 t/day estimated with AcajutlaCanaveral Harbor: 22 t/day estimated with AcajutlaJinzhou: 22 t/day estimated with AcajutlaHonolulu: 22 t/day estimated with AcajutlaCaleta Patillos: 21 t/day estimated with AcajutlaLagos: 21 t/day estimated with AcajutlaWakayama-Shimotsu: 20 t/day estimated with AcajutlaBarranquilla: 20 t/day estimated with AcajutlaPort Esquivel: 20 t/day estimated with AcajutlaMobile: 19 t/day estimated with AcajutlaRas Laffan: 19 t/day estimated with AcajutlaBahia De Las Minas: 19 t/day estimated with AcajutlaMikawa: 19 t/day estimated with AcajutlaCat Lai (Saigon New Port): 18 t/day estimated with AcajutlaWhiffen Head: 18 t/day estimated with AcajutlaSingapore: 18 t/day estimated with AcajutlaBeaumont: 18 t/day estimated with AcajutlaGalveston: 18 t/day estimated with AcajutlaLondon: 18 t/day estimated with AcajutlaGhent: 18 t/day estimated with AcajutlaNew York-New Jersey: 18 t/day estimated with AcajutlaYokohama: 18 t/day estimated with AcajutlaPengerang: 17 t/day estimated with AcajutlaZhuhai: 17 t/day estimated with AcajutlaTerneuzen: 17 t/day estimated with AcajutlaHuanghua: 17 t/day estimated with AcajutlaLirquen: 17 t/day estimated with AcajutlaKarabiga: 17 t/day estimated with AcajutlaRodeo: 17 t/day estimated with AcajutlaFawley: 16 t/day estimated with AcajutlaKlaipeda: 16 t/day estimated with AcajutlaOranjestad: 16 t/day estimated with AcajutlaPort Aransas: 16 t/day estimated with AcajutlaAlgeciras: 16 t/day estimated with AcajutlaAmbarli: 16 t/day estimated with AcajutlaRosario: 16 t/day estimated with AcajutlaMatarani: 15 t/day estimated with AcajutlaGeorgetown: 15 t/day estimated with AcajutlaRio De Janeiro: 15 t/day estimated with AcajutlaKotka: 15 t/day estimated with AcajutlaPichilingue: 15 t/day estimated with AcajutlaHamburg: 14 t/day estimated with AcajutlaWilmington, DE: 14 t/day estimated with AcajutlaBahia Blanca: 14 t/day estimated with AcajutlaDavao: 14 t/day estimated with AcajutlaYakacik: 14 t/day estimated with AcajutlaBrownsville (US-PA): 13 t/day estimated with AcajutlaRavenna: 13 t/day estimated with AcajutlaQuebec: 13 t/day estimated with AcajutlaKisarazu: 13 t/day estimated with AcajutlaGaeta: 13 t/day estimated with AcajutlaPort Au Prince: 13 t/day estimated with AcajutlaTuapse: 13 t/day estimated with AcajutlaEnsenada: 12 t/day estimated with AcajutlaEsmeraldas: 12 t/day estimated with AcajutlaVentspils: 12 t/day estimated with AcajutlaSalina Cruz: 12 t/day estimated with AcajutlaNueva Palmira: 12 t/day estimated with AcajutlaCampana: 12 t/day estimated with AcajutlaTuxpan: 11 t/day estimated with AcajutlaPuerto Bolivar: 11 t/day estimated with AcajutlaMadero: 11 t/day estimated with AcajutlaGaogang: 11 t/day estimated with AcajutlaKuantan: 11 t/day estimated with AcajutlaTalara: 10 t/day estimated with AcajutlaAberdeen: 9 t/day estimated with AcajutlaCoatzacoalcos: 9 t/day estimated with AcajutlaZeebrugge: 8 t/day estimated with AcajutlaManta: 8 t/day estimated with AcajutlaShanghai (Yangshan): 7 t/day estimated with AcajutlaChancay: 6 t/day estimated with AcajutlaPoti: 6 t/day estimated with AcajutlaPaita: 6 t/day estimated with AcajutlaBridgetown: 6 t/day estimated with AcajutlaSuzhou (Zhangjiagang): 6 t/day estimated with AcajutlaNingbo: 5 t/day estimated with AcajutlaDakar: 4 t/day estimated with AcajutlaPunta Arenas: 4 t/day estimated with AcajutlaHarmac: 4 t/day estimated with AcajutlaBrunsbuettel: 3 t/day estimated with AcajutlaPort Hueneme: 3 t/day estimated with AcajutlaSan Diego: 3 t/day estimated with AcajutlaAcajutla
click to enable scroll zoom · drag to pan

Full footprint: all 214 connections of Acajutla aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Puerto QuetzalGuatemala1.5 days between calls
  2. 2.New OrleansUnited States14.9 days between calls
  3. 3.TaboguillaPanama7.0 days between calls
  4. 4.CorintoNicaragua1.8 days between calls
  5. 5.Lazaro CardenasMexico4.6 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Puerto QuetzalGuatemala3.5 days between calls
  2. 2.CorintoNicaragua1.6 days between calls
  3. 3.BalboaPanama3.7 days between calls
  4. 4.Puerto CalderaCosta Rica2.0 days between calls
  5. 5.San Lorenzo (Henecan)Honduras1.4 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)