Port profile · Maritime Radar

Port of Kakinada daily activity

Kakinada handled an estimated average of 35 kt a day in the week ending 25 September 2026 (-41.8% year on year), with an average of 1 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
India · LOCODE INKAK · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Vegetable Products

Data up to · 25 September 2026

7-day average · Estimated total volume

35 kt

28-day average

55 kt

Vs 28-day average

-35.5%

Year on year (same week)

-41.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container10 t1.2 kt
Dry bulk381.0 Mt418 kt
General cargo107.5 kt8.0 kt
Ro-Ro00 t0 t
Tanker562 kt0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Visakhapatnam: 3,458 t/day estimated with KakinadaVisakhapatnamQuanzhou: 2,164 t/day estimated with KakinadaQuanzhouKamarajar Port: 2,159 t/day estimated with KakinadaKamarajar PortVancouver: 1,998 t/day estimated with KakinadaVancouverKrishnapatnam Port: 1,618 t/day estimated with KakinadaKrishnapatnam PortSingapore: 1,546 t/day estimated with KakinadaSingaporeSantos: 1,458 t/day estimated with KakinadaSantosParadip: 1,425 t/day estimated with KakinadaParadipRichards Bay: 1,283 t/day estimated with KakinadaRichards BayHaldia: 1,268 t/day estimated with KakinadaHaldiaChennai (Madras): 1,091 t/day estimated with KakinadaChennai (Madras)Abidjan: 1,060 t/day estimated with KakinadaAbidjanCotonou: 986 t/day estimated with KakinadaCotonouPort Elizabeth: 962 t/day estimated with KakinadaPort ElizabethXiamen: 959 t/day estimated with KakinadaXiamenDakar: 944 t/day estimated with KakinadaDakarRas Al-Khair: 851 t/day estimated with KakinadaRas Al-KhairUst-Luga: 831 t/day estimated with KakinadaUst-LugaBaltimore: 829 t/day estimated with KakinadaBaltimoreConakry: 812 t/day estimated with KakinadaConakryQalhat LNG Terminal: 721 t/day estimated with KakinadaQalhat LNG TerminalFangcheng: 713 t/day estimated with KakinadaFangchengShanghai: 650 t/day estimated with KakinadaShanghaiPort Sudan: 646 t/day estimated with KakinadaPort SudanFremantle: 612 t/day estimated with KakinadaFremantleDurban: 608 t/day estimated with KakinadaDurbanBunbury: 591 t/day estimated with KakinadaBunburyCai Mep: 587 t/day estimated with KakinadaCai MepShougang Jingtang: 580 t/day estimated with KakinadaShougang JingtangColombo: 567 t/day estimated with KakinadaColomboTuticorin: 501 t/day estimated with KakinadaTuticorinGladstone: 492 t/day estimated with KakinadaGladstoneChittagong: 492 t/day estimated with KakinadaChittagongDumai: 450 t/day estimated with KakinadaDumaiHay Point: 449 t/day estimated with KakinadaHay PointYanbu (King Fahd Port): 439 t/day estimated with KakinadaYanbu (King Fahd Port)Tianjin Xin Gang: 428 t/day estimated with KakinadaTianjin Xin GangHuanghua: 417 t/day estimated with KakinadaHuanghuaNew Mangalore: 405 t/day estimated with KakinadaNew MangaloreMonrovia: 401 t/day estimated with KakinadaMonroviaKandla: 400 t/day estimated with KakinadaKandlaDoha-Umm Said: 379 t/day estimated with KakinadaDoha-Umm SaidDhamra Port: 377 t/day estimated with KakinadaDhamra PortMumbai-Jawaharlal Nehru (Nhava Sheva): 373 t/day estimated with KakinadaMumbai-Jawaharlal Nehru (Nhava Sheva)Jubail: 373 t/day estimated with KakinadaJubailYantai: 371 t/day estimated with KakinadaYantaiCochin (Kochi): 355 t/day estimated with KakinadaCochin (Kochi)Sikka: 353 t/day estimated with KakinadaSikkaMormugao: 345 t/day estimated with KakinadaMormugaoXiuyu: 330 t/day estimated with KakinadaXiuyuJorf Lasfar: 330 t/day estimated with KakinadaJorf LasfarMundra: 318 t/day estimated with KakinadaMundraLome: 317 t/day estimated with KakinadaLomeLanqiao Port: 249 t/day estimated with KakinadaLanqiao PortRizhao: 242 t/day estimated with KakinadaRizhaoAbbot Point: 238 t/day estimated with KakinadaAbbot PointJabal Az Zannah-Ruways: 238 t/day estimated with KakinadaJabal Az Zannah-RuwaysGresik: 237 t/day estimated with KakinadaGresikBalikpapan: 233 t/day estimated with KakinadaBalikpapanDjibouti: 229 t/day estimated with KakinadaDjiboutiFreetown: 215 t/day estimated with KakinadaYangon: 208 t/day estimated with KakinadaAqaba: 207 t/day estimated with KakinadaLuanda: 203 t/day estimated with KakinadaSurabaya: 198 t/day estimated with KakinadaQinzhou: 196 t/day estimated with KakinadaLianyungang: 196 t/day estimated with KakinadaYingkou: 190 t/day estimated with KakinadaMina Saqr: 187 t/day estimated with KakinadaParanaguá: 183 t/day estimated with KakinadaKhalifa Port: 172 t/day estimated with KakinadaPenang: 169 t/day estimated with KakinadaBelawan: 165 t/day estimated with KakinadaSitrah: 163 t/day estimated with KakinadaSiam Seaport: 162 t/day estimated with KakinadaBayuquan: 159 t/day estimated with KakinadaMorehead City: 158 t/day estimated with KakinadaSaigon: 147 t/day estimated with KakinadaBontang LNG Terminal: 147 t/day estimated with KakinadaTripoli: 147 t/day estimated with KakinadaPort of Sohar: 146 t/day estimated with KakinadaAl Adabiyah: 142 t/day estimated with KakinadaBandar Shahid Rajaee: 134 t/day estimated with KakinadaKlaipeda: 129 t/day estimated with KakinadaSkhira: 127 t/day estimated with KakinadaTema: 121 t/day estimated with KakinadaSalalah: 119 t/day estimated with KakinadaJohor: 119 t/day estimated with KakinadaTaichung: 118 t/day estimated with KakinadaZhanjiang: 118 t/day estimated with KakinadaTanjung Priok: 117 t/day estimated with KakinadaManila: 116 t/day estimated with KakinadaMap Ta Phut: 114 t/day estimated with KakinadaTangshan (Jingtang): 110 t/day estimated with KakinadaPort Klang: 106 t/day estimated with KakinadaTeluk Bayur: 105 t/day estimated with KakinadaHazira: 102 t/day estimated with KakinadaXiagong: 100 t/day estimated with KakinadaWeifang Port: 98 t/day estimated with KakinadaCape Town: 97 t/day estimated with KakinadaKaohsiung: 97 t/day estimated with KakinadaPanjang: 97 t/day estimated with KakinadaBahia Blanca: 97 t/day estimated with KakinadaTrincomalee: 93 t/day estimated with KakinadaEilat: 88 t/day estimated with KakinadaLumut: 87 t/day estimated with KakinadaNacala: 86 t/day estimated with KakinadaAlgeciras: 86 t/day estimated with KakinadaBintulu: 84 t/day estimated with KakinadaJiangyin: 84 t/day estimated with KakinadaSuzhou (Taicang): 82 t/day estimated with KakinadaTampa Port: 80 t/day estimated with KakinadaMaputo: 80 t/day estimated with KakinadaBanten: 78 t/day estimated with KakinadaUlsan: 77 t/day estimated with KakinadaLongkou Gang: 77 t/day estimated with KakinadaPort Kembla: 75 t/day estimated with KakinadaNanjing: 73 t/day estimated with KakinadaJinzhou: 73 t/day estimated with KakinadaVostochnyy: 72 t/day estimated with KakinadaJose Terminal: 71 t/day estimated with KakinadaSao Francisco: 71 t/day estimated with KakinadaLyttelton: 70 t/day estimated with KakinadaDamietta: 68 t/day estimated with KakinadaKuantan: 68 t/day estimated with KakinadaNantong: 67 t/day estimated with KakinadaNingbo: 65 t/day estimated with KakinadaZhoushan: 63 t/day estimated with KakinadaConstantza: 63 t/day estimated with KakinadaPhuket: 62 t/day estimated with KakinadaRotterdam: 62 t/day estimated with KakinadaChornomorsk: 61 t/day estimated with KakinadaDahej: 60 t/day estimated with KakinadaSaldanha Bay: 60 t/day estimated with KakinadaPort Arthur: 59 t/day estimated with KakinadaHouston (US-TX): 57 t/day estimated with KakinadaChangzhou: 57 t/day estimated with KakinadaQiwei: 57 t/day estimated with KakinadaMersin: 57 t/day estimated with KakinadaTanjunguban: 55 t/day estimated with KakinadaLas Palmas (de Gran Canaria): 54 t/day estimated with KakinadaKarachi: 54 t/day estimated with KakinadaGuangxi Beibu Gulf Port: 53 t/day estimated with KakinadaSaganoseki: 52 t/day estimated with KakinadaBerbera: 51 t/day estimated with KakinadaDongjiakou: 51 t/day estimated with KakinadaRosario: 49 t/day estimated with KakinadaIstanbul: 49 t/day estimated with KakinadaDouala: 48 t/day estimated with KakinadaFuzhou: 47 t/day estimated with KakinadaUmm Qasr: 47 t/day estimated with KakinadaBandar Khomeini: 47 t/day estimated with KakinadaKaraikal: 45 t/day estimated with KakinadaDiliskelesi: 45 t/day estimated with KakinadaPort Said: 45 t/day estimated with KakinadaDung Quat: 45 t/day estimated with KakinadaSan Martin: 44 t/day estimated with KakinadaJebel Ali: 44 t/day estimated with KakinadaSaint Petersburg: 44 t/day estimated with KakinadaGabes: 43 t/day estimated with KakinadaBatumi: 41 t/day estimated with KakinadaGwangyang (Kwangyang): 41 t/day estimated with KakinadaBeira: 40 t/day estimated with KakinadaTuapse: 40 t/day estimated with KakinadaZhouliwang: 39 t/day estimated with KakinadaPipavav Port: 39 t/day estimated with KakinadaSantiago De Cuba: 39 t/day estimated with KakinadaHambantota: 39 t/day estimated with KakinadaSuzhou (Zhangjiagang): 39 t/day estimated with KakinadaAntwerp: 38 t/day estimated with KakinadaCasablanca: 38 t/day estimated with KakinadaPort Blair: 37 t/day estimated with KakinadaPayra: 37 t/day estimated with KakinadaNewcastle: 36 t/day estimated with KakinadaRio Grande: 36 t/day estimated with KakinadaVanino: 36 t/day estimated with KakinadaNewport News: 35 t/day estimated with KakinadaQuequén: 35 t/day estimated with KakinadaYanbu (Yanbu city): 35 t/day estimated with KakinadaSafi: 35 t/day estimated with KakinadaHudaydah (Hodeidah): 34 t/day estimated with KakinadaIndonesia Morowali Industrial Park: 33 t/day estimated with KakinadaPrince Rupert: 33 t/day estimated with KakinadaFujairah: 33 t/day estimated with KakinadaPyeongtaek: 33 t/day estimated with KakinadaNovorossiysk: 32 t/day estimated with KakinadaSemarang: 32 t/day estimated with KakinadaVladivostok: 32 t/day estimated with KakinadaPort Louis: 31 t/day estimated with KakinadaNakhodka: 30 t/day estimated with KakinadaPengerang: 30 t/day estimated with KakinadaShantou: 29 t/day estimated with KakinadaZhuhai: 29 t/day estimated with KakinadaLazaro Cardenas: 29 t/day estimated with KakinadaBenghazi: 28 t/day estimated with KakinadaMonfalcone: 28 t/day estimated with KakinadaShuwaikh: 28 t/day estimated with KakinadaCorpus Christi: 28 t/day estimated with KakinadaVancouver: 28 t/day estimated with KakinadaVila Do Conde: 27 t/day estimated with KakinadaKakinada
click to enable scroll zoom · drag to pan

Full footprint: all 363 connections of Kakinada aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.VancouverCanada38.3 days between calls
  2. 2.VisakhapatnamIndia4.4 days between calls
  3. 3.SingaporeSingapore10.4 days between calls
  4. 4.SantosBrazil40.8 days between calls
  5. 5.Richards BaySouth Africa20.7 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.QuanzhouChina14.8 days between calls
  2. 2.VisakhapatnamIndia4.1 days between calls
  3. 3.Kamarajar PortIndia6.8 days between calls
  4. 4.AbidjanCôte d'Ivoire42.2 days between calls
  5. 5.CotonouBenin55.8 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)