Port profile · Maritime Radar

Port of Iwakuni daily activity

Iwakuni handled an estimated average of 9.4 kt a day in the week ending 25 September 2026 (-70.6% year on year), with an average of 5 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Japan · LOCODE JPIWK · Main cargo sectors: Mineral Products, Chemical & Allied Industries, Wood & Wood Products

Data up to · 25 September 2026

7-day average · Estimated total volume

9.4 kt

28-day average

16 kt

Vs 28-day average

-41.0%

Year on year (same week)

-70.6%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container197.1 kt7.3 kt
Dry bulk1392 kt55 kt
General cargo1720 kt2.1 kt
Ro-Ro20 t0 t
Tanker139175 kt87 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Kiire: 10,610 t/day estimated with IwakuniKiireMizushima: 3,953 t/day estimated with IwakuniMizushimaSakai-Semboku: 2,800 t/day estimated with IwakuniSakai-SembokuOita: 2,290 t/day estimated with IwakuniOitaUlsan: 1,891 t/day estimated with IwakuniUlsanYokohama: 1,628 t/day estimated with IwakuniYokohamaRichards Bay: 1,597 t/day estimated with IwakuniRichards BayHakata: 1,389 t/day estimated with IwakuniHakataPortland: 1,332 t/day estimated with IwakuniPortlandKashima-Ibaraki: 1,320 t/day estimated with IwakuniKashima-IbarakiTokuyama: 1,180 t/day estimated with IwakuniTokuyamaIshinomaki: 1,149 t/day estimated with IwakuniIshinomakiWakayama-Shimotsu: 1,075 t/day estimated with IwakuniWakayama-ShimotsuChiba: 1,028 t/day estimated with IwakuniChibaKobe: 988 t/day estimated with IwakuniKobeHiroshima: 867 t/day estimated with IwakuniHiroshimaDung Quat: 832 t/day estimated with IwakuniDung QuatYokkaichi: 799 t/day estimated with IwakuniYokkaichiBusan: 696 t/day estimated with IwakuniBusanHimeji: 643 t/day estimated with IwakuniHimejiSingapore: 642 t/day estimated with IwakuniSingaporeNagoya: 595 t/day estimated with IwakuniNagoyaSendai-Shiogama: 588 t/day estimated with IwakuniSendai-ShiogamaLongview: 497 t/day estimated with IwakuniLongviewUbe: 487 t/day estimated with IwakuniUbeKawasaki: 484 t/day estimated with IwakuniKawasakiYatsushiro: 482 t/day estimated with IwakuniYatsushiroJabal Az Zannah-Ruways: 414 t/day estimated with IwakuniJabal Az Zannah-RuwaysMatsuyama: 384 t/day estimated with IwakuniMatsuyamaKanokawa: 369 t/day estimated with IwakuniKanokawaShanghai: 348 t/day estimated with IwakuniShanghaiTomakomai: 344 t/day estimated with IwakuniTomakomaiFushiki-Toyama: 336 t/day estimated with IwakuniFushiki-ToyamaKagoshima: 334 t/day estimated with IwakuniKagoshimaAkita: 315 t/day estimated with IwakuniAkitaSakaide: 306 t/day estimated with IwakuniSakaideSuzhou (Taicang): 299 t/day estimated with IwakuniSuzhou (Taicang)Vostochnyy: 296 t/day estimated with IwakuniVostochnyyGwangyang (Kwangyang): 270 t/day estimated with IwakuniGwangyang (Kwangyang)Osaka: 256 t/day estimated with IwakuniOsakaRio Grande: 252 t/day estimated with IwakuniRio GrandeNagasaki: 239 t/day estimated with IwakuniNagasakiPort Botany: 236 t/day estimated with IwakuniPort BotanyNiihama: 220 t/day estimated with IwakuniNiihamaSiam Seaport: 215 t/day estimated with IwakuniSiam SeaportHon Gai: 198 t/day estimated with IwakuniHon GaiRas Laffan: 192 t/day estimated with IwakuniRas LaffanVancouver: 183 t/day estimated with IwakuniVancouverNiigata: 181 t/day estimated with IwakuniNiigataTaboguilla: 175 t/day estimated with IwakuniTaboguillaBrisbane: 171 t/day estimated with IwakuniBrisbaneKanazawa: 170 t/day estimated with IwakuniKanazawaNewcastle: 169 t/day estimated with IwakuniNewcastleKitakyushu (Wakamatsu): 164 t/day estimated with IwakuniKitakyushu (Wakamatsu)Komatsushima: 160 t/day estimated with IwakuniKomatsushimaMishima: 159 t/day estimated with IwakuniMishimaMoji: 159 t/day estimated with IwakuniMojiKikuma: 154 t/day estimated with IwakuniKikumaHong Kong: 152 t/day estimated with IwakuniHong KongMuroran: 150 t/day estimated with IwakuniMuroranMarugame: 137 t/day estimated with IwakuniGeelong: 135 t/day estimated with IwakuniKinwan: 130 t/day estimated with IwakuniMarsden Point: 129 t/day estimated with IwakuniSakai: 110 t/day estimated with IwakuniDurban: 109 t/day estimated with IwakuniFukuyama: 107 t/day estimated with IwakuniDaesan: 105 t/day estimated with IwakuniLos Angeles-Long Beach: 104 t/day estimated with IwakuniCoronel: 102 t/day estimated with IwakuniLongkou Gang: 99 t/day estimated with IwakuniBunbury: 99 t/day estimated with IwakuniLeixoes: 99 t/day estimated with IwakuniAko: 98 t/day estimated with IwakuniKudamatsu: 95 t/day estimated with IwakuniYokosuka: 88 t/day estimated with IwakuniHigashiharima: 83 t/day estimated with IwakuniApra Harbor: 83 t/day estimated with IwakuniPengerang: 82 t/day estimated with IwakuniBatangas City: 81 t/day estimated with IwakuniLanqiao Port: 80 t/day estimated with IwakuniLas Palmas (de Gran Canaria): 78 t/day estimated with IwakuniJohor: 77 t/day estimated with IwakuniGladstone: 77 t/day estimated with IwakuniTakamatsu: 74 t/day estimated with IwakuniFunabashi: 71 t/day estimated with IwakuniStockton: 70 t/day estimated with IwakuniMaizuru: 70 t/day estimated with IwakuniFukui: 69 t/day estimated with IwakuniRotterdam: 69 t/day estimated with IwakuniOnomichi-Itozaki: 66 t/day estimated with IwakuniTauranga: 66 t/day estimated with IwakuniVanino: 66 t/day estimated with IwakuniHososhima: 66 t/day estimated with IwakuniMailiao: 64 t/day estimated with IwakuniKinuura: 63 t/day estimated with IwakuniXiagong: 63 t/day estimated with IwakuniPrince Rupert: 61 t/day estimated with IwakuniKushiro: 60 t/day estimated with IwakuniImabari: 60 t/day estimated with IwakuniDumai: 59 t/day estimated with IwakuniPuerto Caldera: 58 t/day estimated with IwakuniNaoetsu: 57 t/day estimated with IwakuniTanjung Pelepas: 57 t/day estimated with IwakuniAnchorage: 56 t/day estimated with IwakuniHibikinada: 55 t/day estimated with IwakuniHouston (US-TX): 53 t/day estimated with IwakuniKure: 50 t/day estimated with IwakuniSusaki: 49 t/day estimated with IwakuniOnahama: 48 t/day estimated with IwakuniJubail: 45 t/day estimated with IwakuniSetubal: 42 t/day estimated with IwakuniMelbourne: 42 t/day estimated with IwakuniEmpire: 42 t/day estimated with IwakuniSubic Bay: 41 t/day estimated with IwakuniDafeng: 41 t/day estimated with IwakuniBeaumont: 40 t/day estimated with IwakuniBahia Quintero (Ventanas): 39 t/day estimated with IwakuniTopolobampo: 39 t/day estimated with IwakuniDalian: 38 t/day estimated with IwakuniPort Dickson: 38 t/day estimated with IwakuniPanama City: 37 t/day estimated with IwakuniTsukumi: 37 t/day estimated with IwakuniAntwerp: 37 t/day estimated with IwakuniMejillones: 36 t/day estimated with IwakuniMikawa: 36 t/day estimated with IwakuniShibushi: 36 t/day estimated with IwakuniMutsure: 36 t/day estimated with IwakuniDonghae: 35 t/day estimated with IwakuniGunsan: 35 t/day estimated with IwakuniTsuruga: 35 t/day estimated with IwakuniKaratsu: 35 t/day estimated with IwakuniSaganoseki: 34 t/day estimated with IwakuniAmagasaki: 34 t/day estimated with IwakuniKochi: 33 t/day estimated with IwakuniOnoda: 33 t/day estimated with IwakuniAmsterdam: 33 t/day estimated with IwakuniKaohsiung: 32 t/day estimated with IwakuniTaichung: 32 t/day estimated with IwakuniShougang Jingtang: 32 t/day estimated with IwakuniFangcheng: 31 t/day estimated with IwakuniTianjin Xin Gang: 29 t/day estimated with IwakuniShimizu: 29 t/day estimated with IwakuniIncheon: 29 t/day estimated with IwakuniBejaia: 28 t/day estimated with IwakuniKota Baru: 27 t/day estimated with IwakuniNghe Tinh: 27 t/day estimated with IwakuniTownsville: 26 t/day estimated with IwakuniSasebo: 26 t/day estimated with IwakuniHamada: 26 t/day estimated with IwakuniHonolulu: 26 t/day estimated with IwakuniGdynia: 26 t/day estimated with IwakuniHuelva: 25 t/day estimated with IwakuniDa Nang: 25 t/day estimated with IwakuniHofu: 25 t/day estimated with IwakuniPohang: 24 t/day estimated with IwakuniPort Klang: 24 t/day estimated with IwakuniNamikata: 24 t/day estimated with IwakuniHannan: 24 t/day estimated with IwakuniDongjiakou: 23 t/day estimated with IwakuniBalikpapan: 23 t/day estimated with IwakuniTokyo: 22 t/day estimated with IwakuniBuco: 22 t/day estimated with IwakuniHachinohe: 22 t/day estimated with IwakuniNaha: 21 t/day estimated with IwakuniPenang: 21 t/day estimated with IwakuniMina Al Ahmadi: 21 t/day estimated with IwakuniYawatahama: 20 t/day estimated with IwakuniMarin: 20 t/day estimated with IwakuniQingdao Port: 20 t/day estimated with IwakuniSines: 20 t/day estimated with IwakuniCalaca: 20 t/day estimated with IwakuniSerangoon Harbor: 20 t/day estimated with IwakuniPhiladelphia: 20 t/day estimated with IwakuniKanda: 20 t/day estimated with IwakuniMackay: 19 t/day estimated with IwakuniConchan Oil Terminal: 19 t/day estimated with IwakuniNew York-New Jersey: 19 t/day estimated with IwakuniAmlan: 19 t/day estimated with IwakuniAnacortes: 19 t/day estimated with IwakuniRas Tanura: 18 t/day estimated with IwakuniBeira: 18 t/day estimated with IwakuniIndonesia Morowali Industrial Park: 18 t/day estimated with IwakuniNovorossiysk: 17 t/day estimated with IwakuniCherry Point: 17 t/day estimated with IwakuniPort Elizabeth: 17 t/day estimated with IwakuniSaiki: 16 t/day estimated with IwakuniCape Town: 16 t/day estimated with IwakuniPago Pago Harbor: 16 t/day estimated with IwakuniSaigon: 16 t/day estimated with IwakuniNew Mangalore: 16 t/day estimated with IwakuniPortland, OR: 16 t/day estimated with IwakuniNanjing: 16 t/day estimated with IwakuniTagonoura: 15 t/day estimated with IwakuniSaipan: 15 t/day estimated with IwakuniSan Martin: 15 t/day estimated with IwakuniNingbo: 14 t/day estimated with IwakuniNew Westminster: 14 t/day estimated with IwakuniQushan Island: 14 t/day estimated with IwakuniPorto Grande: 14 t/day estimated with IwakuniIwakuni
click to enable scroll zoom · drag to pan

Full footprint: all 266 connections of Iwakuni aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.KiireJapan1.5 days between calls
  2. 2.MizushimaJapan2.0 days between calls
  3. 3.Sakai-SembokuJapan1.7 days between calls
  4. 4.Richards BaySouth Africa28.7 days between calls
  5. 5.PortlandAustralia20.3 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.MizushimaJapan1.8 days between calls
  2. 2.OitaJapan1.7 days between calls
  3. 3.Sakai-SembokuJapan1.9 days between calls
  4. 4.UlsanKorea2.0 days between calls
  5. 5.HakataJapan0.9 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)